AGENDA RECOMMENDATION |
Consent Calendar 6.C.
City Council Regular Meeting
- Meeting Date:
- 07/28/2025
Agenda Item:
Resolution authorizing a reimbursable agreement for telephone service with the Federal Aviation Administration (FAA) for the Airport Control Tower at the Mankato Airport.
Recommendation/Action(s):
Adoption of the attached resolution.
Summary:
A part of the City’s requirements in establishing an Airport Control Tower is the agreement to pre-approve reimbursement of all Federal Aviation Administration (FAA) costs related to the establishment of Telephone Services and Local Area Network at the new facility, which includes the following:
Background:
Mankato Airport was accepted into the Federal Aviation Administration Contract Tower Program (FCT) on April 19, 2022. To be admitted into the program, the safety and efficiency benefits of a tower must exceed its costs. The FAA is required to perform benefit-cost analysis (BCA) to determine eligibility for participation in the program; Mankato Airport’s BCA is 2.35.
Conditions of acceptance into the FCT program:
- Administrative telephone line with long-distance capability and handsets to support a single person on duty, contingency plan and emergency operations. The line must be available in both the office and tower cab.
- Telecommunication requirements to sustain high-speed internet communication include:
- FAA Telecommunications Infrastructure Mission Support connection and Router.
- The Local Area Network consists of a network switch, an Uninterruptible Power Supply, a rack with patch panel, and network cabling to the wall jacks.
Background:
Mankato Airport was accepted into the Federal Aviation Administration Contract Tower Program (FCT) on April 19, 2022. To be admitted into the program, the safety and efficiency benefits of a tower must exceed its costs. The FAA is required to perform benefit-cost analysis (BCA) to determine eligibility for participation in the program; Mankato Airport’s BCA is 2.35.
Conditions of acceptance into the FCT program:
- Five years from the date of the acceptance letter (April 19, 2022) provide a control tower that has successfully completed an Operational Readiness Inspection (ORI).
- Enter into an Air Traffic Control Tower Operations Agreement (TOA).
- Tower funding is subject to availability.
- If the Airport fails to provide a control tower that successfully completes an Operational Readiness Inspection (ORI) within the five-year period, the Airport returns to Phase 1 (Interest Phase) and can reapply for acceptance into the FCT Program.