5.6.
CC Regular Session
- Meeting Date:
- 07/13/2021
- Submitted For:
- Joe Feriancek
- By:
- Joe Feriancek, Engineering/Public Works
Information
Title
Adopt Resolution #21-194 Ordering Request for Proposals for Topographic Surveys, Geotechnical Evaluations and Utility Testing for 2022 Pavement Management Program Projects
Purpose/Background:
Purpose:
The purpose of this case is to adopt Resolution #21-194 ordering Requests for Proposals for topographic surveys, geotechnical evaluations and utility testing for 2022 Pavement Management Program projects.
Background:
The current 2021 through 2030 10-Year Capital Improvement Plan (CIP) proposes street reconstructions of the following streets in 2022:
Staff will use the materials as design aids for the improvement projects. Topographic surveys are essential to locate all existing site features and to create an existing ground surface, used as the base for designing the project. Geotechnical Reports inform Staff of subsoil conditions, which is essential when designing the pavement section for the reconstructed streets. Also included are groundwater elevations and support capabilities of the soils for utilities and trenches, as well as associated back filling recommendations. Televising sewer pipes informs staff of the condition of the pipes, and locates existing damage. This allows staff to include fixing damaged pipes into the construction plans, which is more cost effective than doing repairs as standalone projects, or as change orders during the reconstruction project.
Street segment summaries and 2022 street reconstruction map is attached to this case for reference.
The purpose of this case is to adopt Resolution #21-194 ordering Requests for Proposals for topographic surveys, geotechnical evaluations and utility testing for 2022 Pavement Management Program projects.
Background:
The current 2021 through 2030 10-Year Capital Improvement Plan (CIP) proposes street reconstructions of the following streets in 2022:
- Autumn Heights Subdivision
- MSA Waco Street between Sunwood Drive and 150th Avenue
- MSA Sunwood Drive between Trunk Highway 47 and Waco Street
Staff will use the materials as design aids for the improvement projects. Topographic surveys are essential to locate all existing site features and to create an existing ground surface, used as the base for designing the project. Geotechnical Reports inform Staff of subsoil conditions, which is essential when designing the pavement section for the reconstructed streets. Also included are groundwater elevations and support capabilities of the soils for utilities and trenches, as well as associated back filling recommendations. Televising sewer pipes informs staff of the condition of the pipes, and locates existing damage. This allows staff to include fixing damaged pipes into the construction plans, which is more cost effective than doing repairs as standalone projects, or as change orders during the reconstruction project.
Street segment summaries and 2022 street reconstruction map is attached to this case for reference.
Notification:
No notifications are required with this case.
Observations/Alternatives:
Motion to adopt Resolution #21-194 ordering Requests for Proposals for topographic surveys, geotechnical evaluations and utility testing for 2022 Pavement Management Program projects.
Note: Projects would be commenced based upon available funding.
Note: Projects would be commenced based upon available funding.
Recommendation:
Staff recommends adopting Resolution #21-194 ordering Requests for Proposals for topographic surveys, geotechnical evaluations and utility testing for 2022 Pavement Management Program projects.
Action:
Adopt Resolution #21-194 ordering Requests for Proposals for topographic surveys, geotechnical evaluations and utility testing for 2022 Pavement Management Program projects.
Attachments
- 2022 Street Reconstruciton Map
- Sunwood and Waco Street Segment Summary
- Autumn Heights Street Segment Summary
- Wood Pond Hills Street Segment Summary
- Res 21-194
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Bruce Westby | Bruce Westby | 07/07/2021 12:46 PM |
| Bruce Westby | Bruce Westby | 07/07/2021 03:45 PM |
| Bruce Westby | Bruce Westby | 07/07/2021 03:45 PM |
| Kurt Ulrich | Kurt Ulrich | 07/07/2021 04:16 PM |
- Form Started By:
- Joe Feriancek
- Started On:
- 06/15/2021 02:08 PM
- Final Approval Date:
- 07/07/2021