6.1.
Public Works Committee
Meeting Date:
06/20/2017
By:
Bruce Westby, Engineering/Public Works

Title:

Staff Updates on Improvement Projects and Items of Interest

Purpose/Background:

The purpose of this case is to update the Public Works Committee on current and proposed improvement projects within the City, and on other items of interest to the Committee.

City Improvement Projects
  • Business Park 95 Regional Stormwater Pond Improvements (#16-36)
    • Work is substantially complete
    • Final payment will occur in 2017 following satisfactory completion of punch list and warranty work
  • Andrie Street & 164th Lane Reconstruction (#16-00 Div. C)
    • Work is substantially complete
    • Final payment will occur in 2017 following satisfactory completion of punch list and warranty work
  • Mississippi River Trail Phase 3 (#16-54)
    • Work is substantially complete
    • Final completion scheduled for summer 2017
  • Zeolite Street Storm Sewer Extension Improvements (#16-95)
    • Work is substantially complete
    • Final payment will occur in 2017 following satisfactory completion of punch list and warranty work
  • Riverdale Drive Extension - Traprock St. to Ramsey Blvd. (#16-20)
    • Plans and specifications complete
    • Acquired deed for 5.3 acres of roadway right-of-way from Anoka County
    • Construction proposed for 2017 (pending State Aid approval to advance)
  • Alpine Drive Reconstruction (#17-00)
    • Construction proposed from June/July through September 22nd
  • Sunwood Drive Reconstruction (#17-01)
    • Construction proposed from June/July through September 22nd
  • Ground Penetrating Radar Pavement Evaluations (#17-11)
    • Work complete by August 11th
  • Soil Borings / Geotechnical Reports 2018/19 Reconstructs/Overlays (#17-12)
    • Work complete by August 11th
 
Anoka County Improvement Projects
  • Hanson Boulevard/CSAH 78 Grade Separation @ BNSF Railway Crossing (2017)
    • Reconstruct County State Aid Highway 78 (CSAH 78) / Hanson Boulevard to a 4-lane divided section
    • Construct a grade-separated overpass for Burlington Northern Sante Fe (BNSF) railway crossing
  • Hanson Boulevard/CSAH 78 Reconstruction (2018)
    • Expand CSAH 78 / Hanson Blvd between 139th Ave and CSAH 18 / Crosstown Blvd to 4-lane divided section
  • Foley Boulevard/CSAH 11 Grade Separation @ BNSF Railway Crossing
    • This project is currently unscheduled and unfunded
 
MnDOT Improvement Projects
  • Trunk Highway 10 Cable Median Barrier Installation (2018)  
    • Install cable median barrier along Highway 10 between Thurston Avenue and Highway 101 
  • Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Railway Crossing (2017)
    • Preliminary design in progress
 
Items of Interest
  • Puma St & Bunker Lake Blvd Infrastructure Improvements
  • Wellhead Protection Plan Update

Timeframe:

Staff estimates that 5 minutes will be needed for updates and discussion.

Observations/Alternatives:

N/A

Funding Source:

N/A

Recommendation:

N/A

Action:

No formal action is required.

Attachments

No file(s) attached.

Form Review

Inbox Reviewed By Date
Grant Riemer Grant Riemer 06/15/2017 07:40 AM
Kurt Ulrich Kurt Ulrich 06/15/2017 08:56 AM
Form Started By:
Bruce Westby
Started On:
06/15/2017 05:04 AM
Final Approval Date:
06/15/2017