Background:
• Issue 1: This is in regard to the low visibility of council members from the audience due to the frontal/facade height of the council desk.
• Issue2: This is in regard to the insufficient leg space that the council desk provides; which may not allow council members sufficient leg/knee clearance.
In an attempt to address both issues stated above, city staff presented contractor bids on two separate possible alterations to the dias on July 12 at a City Council work session.
• Option 1: lower the desk facade/front by 3 inches.
(Establish better visibility of council members)
• Option 2: raise the desk platform by 2 inches.
(Establish more clearance for legs/knees)
Observations:
After discussion in a City Council work session on July 12, staff recieved direction to get final bids on option #1 (dropping the desk facade by 3").
If the desk top is dropped the tops of the computer monitors will be exposed. Staff has also provided a remedy for that problem: a LCD wall mount. This mount would allow monitors to be dropped about 3 inches. NOTE: the old fixed mounts do not allow you do drop the height of monitors.
Again, based on input from the City Council work session, staff will install these wall mounts in conjunction with dropping the façade of the desk by 3”.
Attached to this case is a report. In the report is a visual depiction of the two options referred to above. Also included are the bids from three contractors.
Recommendation:
• Will take the most precaution with respecting and preventing damage to their environment (chamber dias)
• Will not need to add a piece of trim because they can make the original cut (reduction in bid price by $480, $1,800 final)
• Has taken the most time to understand the job; and has taken into account the complexity of the desk
• Will take the most time to prep and clean the site
• Will reduce their bid amount if the job goes quick (i.e. if it takes them less time than they expect they will charge less)
Funding Source:
Equipment Revolving Fund
Council Action:
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Kurt Ulrich | Kurt Ulrich | 08/18/2011 03:18 PM |
- Form Started By:
- Patrick Brama
- Started On:
- 08/18/2011
- Final Approval Date:
- 08/18/2011