5.17.
CC Regular Session
- Meeting Date:
- 01/12/2021
- Submitted For:
- Bruce Westby
- By:
- Joe Feriancek, Engineering/Public Works
Information
Title
Adopt Resolution #21-012 Ordering Plans and Specifications for Improvement Project # 21-05, 2021 MSA Pavement Overlay Improvements.
Purpose/Background:
Purpose:
The purpose of this case is to adopt Resolution #21-012 Ordering Plans and Specifications for Improvement Project #21-05 2021 MSA Pavement Overlay Improvements.
Background:
Overlaying the Municipal State Aid (MSA) streets identified within the 2021 – 2030 Capital Improvement Program for 2021 will allow the City to maintain these streets in the most cost-effective manner throughout the serviceable life of the streets.
The MSA street segments proposed to receive bituminous pavement overlay improvements in 2021 are:
A street segment summary is attached. The proposed project is 0.72 miles in total length.
The proposed improvements are designated as City Improvement Project #21-05, 2021 MSA Pavement Overlay Improvements.
The purpose of this case is to adopt Resolution #21-012 Ordering Plans and Specifications for Improvement Project #21-05 2021 MSA Pavement Overlay Improvements.
Background:
Overlaying the Municipal State Aid (MSA) streets identified within the 2021 – 2030 Capital Improvement Program for 2021 will allow the City to maintain these streets in the most cost-effective manner throughout the serviceable life of the streets.
The MSA street segments proposed to receive bituminous pavement overlay improvements in 2021 are:
- Sunwood Drive between Bunker Lake Boulevard and Sunfish Lake Boulevard
- Sunwood Drive between Erkium Street and Trunk Highway 47
A street segment summary is attached. The proposed project is 0.72 miles in total length.
The proposed improvements are designated as City Improvement Project #21-05, 2021 MSA Pavement Overlay Improvements.
Notification:
No notifications are required with this case.
Observations/Alternatives:
Motion to adopt Resolution #21-012 ordering plans and specifications for improvement project #21-05, 2021 MSA Pavement Overlay Improvements.
Funding Source:
Staff estimates project costs, based on anticipated 2021 construction costs, to be $324,000.
Plans and specifications will be prepared in-house as part of Staff's normal duties.
Funding for this improvement is proposed to come from the MSA Fund and Stormwater Utility Fund.
Plans and specifications will be prepared in-house as part of Staff's normal duties.
Funding for this improvement is proposed to come from the MSA Fund and Stormwater Utility Fund.
- Street Project Cost $313,000
- Storm Sewer Project Cost $ 11,000
- Total Estimated Project Cost $324,000
Recommendation:
Staff recommends adopting Resolution #21-012 ordering plans and specifications for improvement project #21-05, 2021 MSA Pavement Overlay Improvements.
Action:
Adopt Resolution #21-012 ordering plans and specifications for improvement project #21-05, 2021 MSA Pavement Overlay Improvements.
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Bruce Westby | Bruce Westby | 01/07/2021 02:42 PM |
- Form Started By:
- Joe Feriancek
- Started On:
- 01/05/2021 08:30 AM
- Final Approval Date:
- 01/07/2021