5.15.
CC Regular Session
Meeting Date: 07/25/2023
   
Primary Strategic Plan Initiative: {ud_pd7}

Information

Title

Adopt Resolution #23-167 Authorizing Solicitation of Quotes for 2023 Spray Patching Contracted Services

Purpose/Background:

Purpose:
The purpose of this case is to adopt Resolution #23-167 authorizing solicitation of Requests for Quotes for Pavement Maintenance Project #23-23, 2023 Spray Patching Contracted Services. 
 
Background:
Many miles of City streets have significant numbers of potholes deeper than 2-inches and/or numerous areas where the upper 2-inches or less of pavement are missing, generally termed surface stripping, resulting in poor and unsafe conditions for drivers and pedestrians. The number of streets with deep and shallow (surface stripping) potholes have grown significantly in recent years, resulting in Public Works staff spending more and more time patching potholes and less time completing other core duties.  In 2023, the number of streets with significant numbers of deep potholes and surface stripping have increased to the point that Public Works staff are able to maintain only a small portion of them. This is due in part to last winter’s severe weather conditions, but also due to the age and composition of the pavement sections, as well as not receiving regular proactive maintenance treatments over the life of the pavement sections. 
 
In April, Staff finalized the attached overall pavement repair plan showing all streets proposed to receive temporary 2-inch mill and overlays, temporary deep pothole patching, and temporary spray patching to most cost-effectively maintain pavement sections on the worst streets until they can be reconstructed.
 
Deep pothole patching involves removing all debris and water from potholes deeper than 2-inches using compressed air, applying bituminous tack coat on existing bituminous pavement surfaces within the potholes, placing hot asphalt mix in the potholes, then compacting the hot mix.
 
Spray patching involves using a spray patching truck to clean debris and water out of potholes 2-inches deep or shallower using compressed air, then applying a bituminous spray patch mix within the shallow potholes.
 
On April 25, 2023, the City Council adopted Resolution #23-089 approving plans and specifications and authorizing advertisements for bids for Improvement Project #23-14, 2023 Critical Mill and Overlay Improvements. The intent of this project, which is complete, was to temporarily repair distressed pavement sections in 21 of the most critical areas by completing 2-inch mill and overlay improvements. That same evening, the City Council directed the City Engineer to solicit quotes for contracted pavement patching services to immediately patch as many of the highest priority potholes as practical. This project, which was designated project #23-15, Priority Pothole Patching, was completed in early June.
 
On April 25, 2023, the City Council also directed the City Engineer to prepare plans for enlisting contracted services to patch all remaining streets shown on the overall pavement repair plan and to present said plans to the City Council on May 9, 2023, to authorize bids. Attached are two figures showing the remaining streets that Staff identified as requiring temporary pavement repairs in the form of deep pothole patching (Figure 1) and spray patching (Figure 2). Approximately 19.6 miles of City streets are identified in Figure 1 as needing deep pothole patching, and approximately 20.8 miles of City streets are identified in Figure 2 as needing spray patching. Some overlap exists between the figures since some streets will require both deep pothole patching and spray patching. These figures were used to develop Pavement Maintenance Project #23-16 intended to help hold these streets together until they receive reconstruction or overlay improvements per the current Pavement Management Program (PMP) or until they can be added to the PMP in the future.  
 
On June 8, 2023, a total of two (2) bids were received, opened, and tabulated for Pavement Maintenance Project #23-16 but only one (1) bid was found to comply with the approved plans and specifications and advertisement for bids.  This bid was submitted by Asphalt Surface Technologies Corp. in the amount of $2,418,600.00. After bids were opened the low bidder indicated their interpretation of the contract documents resulted in a bid that was higher than intended. Upon discussing this with the City Council, the bid was rejected and staff was directed to split Project #23-16 into two separate projects with one project including only deep pothole patching and one project including only spray patching. Staff then prepared new contract documents and advertised bids the following day for the two new projects designated as Street Maintenance Project #23-21, Deep Pothole Patching Contracted Services, and Street Maintenance Project #23-22, Spray Patching Contracted Services.
 
On July 11, 2023, the City Council adopted Resolution #23-154 awarding a construction contract for Street Maintenance Project #23-21, 2023 Deep Pothole Patching Contracted Services   However, the City Council rejected bids for Street Maintenance Project #23-22, Spray Patching Contracted Services and directed the City Engineer to return with a new plan for enlisting contracted services to patch any remaining streets previously proposed to be patched in 2023 but that were not previously patched by staff or using contracted services, and that are not proposed to be patched by staff or using contracted services in 2023.
 
Attached is a map of all the streets proposed to be spray patched by contracted services in 2023.  This map will be included in the Request for Quotes and contractors will be asked to provide a lump sum quote to spray patch these streets, which are highlighted in red on the map.
 
Also attached is a map showing all streets that either have or are proposed to receive pavement patching in 2023 by City forces and contracted services. Streets previously patched by City staff are shown in purple, while streets that are still proposed to be patched by City staff are shown in yellow. Streets previously patched by contracted services are shown in blue, while streets that are still proposed to be patched by contracted services are shown in orange.  Streets highlighted in red are again those streets proposed to be spray patched as part of this project.   

Notification:

Not required for this case.

Funding Source:

The adopted 2023 budget included $375,000 to temporarily repair the bituminous pavement on numerous public street segments in support of the City’s Pavement Management Program, with another $375,000 reserved for temporary pavement repairs in 2024. These funds have been fully expended on other pavement patching projects in 2023.
 
Other potential funding sources include the Public Improvement Revolving (PIR) Fund, the Pavement Management fund, and/or Municipal State Aid (MSA) Funds, as applicable.  Staff will provide a detailed funding recommendation when quotes are presented on August 8th.   

Recommendation:

Staff recommends soliciting quotes for this project.  

Action:

Adopt Resolution #23-167 authorizing solicitation of Requests for Quotes for Pavement Maintenance Project #23-23, 2023 Spray Patching Contracted Services.  

Attachments

Form Review

Inbox Reviewed By Date
Brian Hagen Brian Hagen 07/20/2023 01:46 PM
Form Started By:
Bruce Westby
Started On:
07/18/2023 06:56 PM
Final Approval Date:
07/20/2023