5.14.
CC Regular Session
Meeting Date: 06/24/2025
   
Primary Strategic Plan Initiative: {ud_pd8}

Title:

Adopt Resolution #25-141 Ordering Plans and Specifications for Section 01 Unplatted (S. CR 27) Street Reconstructions, Improvement Project #26-07

Purpose/Background:

Purpose:
The purpose of this case is to adopt Resolution #25-141 ordering plans and specifications for Section 01 Unplatted (S. CR 27) Street Reconstructions, Improvement Project #26-07.
 
Background:
The 2025 – 2034 Capital Improvement Plan (CIP) identifies the streets within the Section 01 Unplatted south of CR 27 subdivision for street reconstruction in 2026. A street segment summary for the project is attached to this case.
 
Project History
  • On April 22, 2025, the Ramsey City Council adopted Resolution #25-082, accepting and awarding a proposal to Bolton & Menk for topographic survey of the project area.
  • May 13, 2025, the Ramsey City Council adopted Resolution #25-101, accepting and awarding a proposal to Independent Testing Technologies for a geotechnical report of the project area.
  • June 17, 2025, the Ramsey Public Works Committee recommended City Council order plans and specifications for said improvements.
 
Project Scope
This project proposes to reconstruct the streets within the Section 01 Unplatted subdivision, generally located west of CSAH 7 and south of 179th Lane (CR 27). The streets are 24-foot wide with a combination of rural and urban with bituminous curbing. Much of the bituminous curbing appears to be placed to address localized drainage within the subdivision, and eventually runs to flumes and swales. The streets total 1.44 miles in length. Drainage is handled through ditches adjacent to the streets, and runs to ponds and wetlands, which exist throughout the project area.
 
The streets within Section 01 Unplatted were constructed in 1980 and received an overlay in 1999. GPR data shows an average pavement section of 6.6-inches, including 4.0-inches of bituminous and 2.6-inches of aggregate base.
 
The reconstruction is proposed to be an FDR in the CIP. Soil corrections are not anticipated, this will be verified during design and review of the geotechnical report. The existing bituminous curbing is proposed to be replaced with concrete curb and gutter. During project design, significant stormwater analysis will be required to determine proper locations for curb and gutter. Street crossing culverts are proposed to be replaced. Municipal sewer and water do not exist within the project area.
 
 
Project Timelines
City Staff is proposing to prepare plans and specifications for this project in-house, as part of their normal duties. The following are the proposed general project timelines:
 
June 24, 2025                                      City Council Authorization to prepare plans and specifications
Summer 2025 / Winter 2026              Staff prepares plans and specifications
Fall 2025 / Winter 2026                      City Council approve plans, authorize bidding
Winter 2026                                        Bid opening, City Council award contracts
Spring 2026                                        Begin Construction
Summer / Fall 2026                            Finish Construction
 
Staff proposes to bid projects separately, but to bid and award projects as close together as practical, which generally allows for a better bidding environment for the City.

Notification:

If City Council orders plans and specifications, staff will send project update letters to property owners impacted by these improvements.

Time Frame/Observations/Alternatives:

Observations:
Estimates are CIP level and will be updated during the design process.
 
Alternatives:
Motion to adopt Resolution #25-141 ordering plans and specifications for Section 01 Unplatted (S. CR 27) Street Reconstructions, Improvement Project #26-07.

Funding Source:

Funding for this improvement is proposed to come from Pavement Management Funds and Storm Water Utility Funds.
 
CIP level estimated project costs are $1,013,472 ($881,280 Pavement Management Funds, $132,192 Storm Water Utility Funds).

Recommendation:

Staff recommends adopting Resolution #25-141 ordering plans and specifications for Section 01 Unplatted (S. CR 27) Street Reconstructions, Improvement Project #26-07.
 
On June 17, 2025, the Ramsey Public Works Committee recommended City Council order plans and specifications for Section 01 Unplatted (S. CR 27) Street Reconstructions, Improvement Project #26-07.

Outcome/Action:

Motion to adopt Resolution #25-141 ordering plans and specifications for Section 01 Unplatted (S. CR 27) Street Reconstructions, Improvement Project #26-07.

Attachments

Form Review

Inbox Reviewed By Date
Bruce Westby Bruce Westby 06/18/2025 01:23 PM
Brian Hagen Brian Hagen 06/18/2025 03:24 PM
Form Started By:
Joe Feriancek
Started On:
06/17/2025 09:57 AM
Final Approval Date:
06/18/2025