7.1.
CC Regular Session
- Meeting Date:
- 06/11/2013
- Submitted For:
- Patrick Brama
- By:
- Patrick Brama, Administrative Services
Information
Title:
15153 Nowthen Blvd Property Development: Consider Comprehensive Plan Amendment Application
Background:
General Background
This site was vacated by the City when the City moved its operations to its new municipal campus in 2006, with the exception of Fire Station Number 2, and some storage. Since that time, the City has explored various options for selling the land in conjunction with the construction of a new fire station on an adjacent site to the east. In 2012, the City was approached by Connexus Energy regarding the development of City owned land located at 15153 Nowthen Boulevard; known as the Old Municipal Center Site (“Subject Property”). The Subject Property is 21.24 acres in size and is currently zoned Public/Quasi-Public.
The City is considering two general development scenarios for the Subject Property: data center and single family residential. The City completed a feasibility study on said development scenarios in early 2013.
The next step in the process to develop the Subject Property is to consider the appropriate land use and zoning. Staff was directed to conduct a public open house regarding a potential Comprehensive Plan and Zoning Amendment for Subject Property in April 2013.
Purpose of Case
Connexus Energy identified the Subject Property as the best available data center site in the entire County of Anoka in the fall of 2012; and, proposed the City partner with their organization to pursue development of the Subject Property for a data center user(s).
Previous to receiving Connexus Energy’s proposal, the City Council identified the Subject Property as surplus City owned land; as it is unneeded for current or future City functions (summer of 2012).
Both the EDA and City Council directed Staff to pursue the proposed partnership with Connexus Energy in the fall of 2012. However, a number of key development issues would need to be resolved before either the EDA our City Council were able to pledge their full support for a data center development. Major items included: a feasibility study (cost-benefit analysis) and Comprehensive Plan/Zoning Amendment for the Subject Property. The EDA and City Council were both interested in exploring how the proposed data center use might fit in with surrounding properties.
Feasibility Study
In early 2013, the EDA and City Council reviewed a feasibility study for the development of the Subject Property. Said study compared three general development scenarios: a single data center user, two data center users and a single family residential development. In summary, said study identified a data center development to be considerably more beneficial to the City than a single family residential development. Additionally, a data center development provided the City with a significant funding source for the City’s new Fire Station #2. NOTE: Fire Station #2 is temporarily located on Subject Property.
Upon review of said feasibility study, Staff was directed to move forward with identifying a zoning solution for the Subject Property. Staff was directed to conduct an open house prior to formally bringing forward a Comprehensive Plan and Zoning Amendment for the Subject Property; as the EDA and City Council were interested in feedback from surrounding property owners. The purpose of this step was to identify any issues the neighborhood would have with a Comprehensive Plan and Zoning Amendment.
Public Open House
On April 18, 2013 the City hosted an (“Open House”) regarding the future development of the Subject Property. Nearly 250 surrounding property owners were contacted via direct mailings.
Over the past few months, Staff has received inquiries from national builders and commercial real estate agents, Connexus Energy and the State of Minnesota regarding the development of the Subject Property for a data center user(s). Staff has not worked directly with any data center prospects (i.e. end users). However, it is Staff's opinion there is a strong market for data centers and the Subject Property would attract development.
NOTE: the City will not work directly with end users interested in utilizing the Subject Property until the City's Comprehensive Plan and Official Zoning Map is amended (data center or residential).
This site was vacated by the City when the City moved its operations to its new municipal campus in 2006, with the exception of Fire Station Number 2, and some storage. Since that time, the City has explored various options for selling the land in conjunction with the construction of a new fire station on an adjacent site to the east. In 2012, the City was approached by Connexus Energy regarding the development of City owned land located at 15153 Nowthen Boulevard; known as the Old Municipal Center Site (“Subject Property”). The Subject Property is 21.24 acres in size and is currently zoned Public/Quasi-Public.
The City is considering two general development scenarios for the Subject Property: data center and single family residential. The City completed a feasibility study on said development scenarios in early 2013.
The next step in the process to develop the Subject Property is to consider the appropriate land use and zoning. Staff was directed to conduct a public open house regarding a potential Comprehensive Plan and Zoning Amendment for Subject Property in April 2013.
Purpose of Case
Consider SUBMITTING AN APPLICATION for a Comprehensive Plan Amendment to allow for [data center and/or residential development]. Please note: this application will also need to be approved by the Metropolitan Council, if approved by the City Council. Upon completion of that process, the City would need to update its official controls (Zoning Code and Official Zoning Map)
IMPORTANT NOTE: The Council must remain objective when reviewing a Comprehensive Plan Amendment application; therefore, the Council must not take a POSITION ON APPROVING a Comprehensive Plan Amendment as part of this case. The Planning Commission must hold a public hearing, establish a findings-of-fact and submit a recommendation to the Council before consideration.
Detailed BackgroundIMPORTANT NOTE: The Council must remain objective when reviewing a Comprehensive Plan Amendment application; therefore, the Council must not take a POSITION ON APPROVING a Comprehensive Plan Amendment as part of this case. The Planning Commission must hold a public hearing, establish a findings-of-fact and submit a recommendation to the Council before consideration.
Connexus Energy identified the Subject Property as the best available data center site in the entire County of Anoka in the fall of 2012; and, proposed the City partner with their organization to pursue development of the Subject Property for a data center user(s).
Previous to receiving Connexus Energy’s proposal, the City Council identified the Subject Property as surplus City owned land; as it is unneeded for current or future City functions (summer of 2012).
Both the EDA and City Council directed Staff to pursue the proposed partnership with Connexus Energy in the fall of 2012. However, a number of key development issues would need to be resolved before either the EDA our City Council were able to pledge their full support for a data center development. Major items included: a feasibility study (cost-benefit analysis) and Comprehensive Plan/Zoning Amendment for the Subject Property. The EDA and City Council were both interested in exploring how the proposed data center use might fit in with surrounding properties.
Feasibility Study
In early 2013, the EDA and City Council reviewed a feasibility study for the development of the Subject Property. Said study compared three general development scenarios: a single data center user, two data center users and a single family residential development. In summary, said study identified a data center development to be considerably more beneficial to the City than a single family residential development. Additionally, a data center development provided the City with a significant funding source for the City’s new Fire Station #2. NOTE: Fire Station #2 is temporarily located on Subject Property.
Upon review of said feasibility study, Staff was directed to move forward with identifying a zoning solution for the Subject Property. Staff was directed to conduct an open house prior to formally bringing forward a Comprehensive Plan and Zoning Amendment for the Subject Property; as the EDA and City Council were interested in feedback from surrounding property owners. The purpose of this step was to identify any issues the neighborhood would have with a Comprehensive Plan and Zoning Amendment.
Public Open House
On April 18, 2013 the City hosted an (“Open House”) regarding the future development of the Subject Property. Nearly 250 surrounding property owners were contacted via direct mailings.
-Summary-
Comments were received from Open House attendees; additionally, Staff received written and verbal comments outside of the Open House. In total, the City received twenty-six (26) comments. Twenty-four (24) were in opposition of a data center development (92%) and two (2) preferred a data center development (8%). Additionally, Staff received a petition in opposition of a data center development, and in support of a residential development, from surrounding property owners on April 26. Said petition included 69 signatures and has not been reviewed or analyzed by Staff.
-Inquiries-
Common public inquiries included, but were not limited to, the use of the site as a school, park, or renovated Fire Station. There were also multiple inquiries as to whether the data center could be sited elsewhere in the community.
-Opposition to Data Center-
For those opposed to the data center concept, common comments included concerns with decreased property values, presence and view of a data center being undesirable, compatibility with the character of surrounding properties, noise, and long term risk/potential re-use of the site.
-Support of Data Center-
For those in opposition of a residential development, common concerns were centered around the high traffic impact of a residential development and the negative effect a residential development would have on the privacy of surrounding property owners (when compared to a data center).
Attached to this case is extensive information attained through the public input process.
Data Center Market InterestComments were received from Open House attendees; additionally, Staff received written and verbal comments outside of the Open House. In total, the City received twenty-six (26) comments. Twenty-four (24) were in opposition of a data center development (92%) and two (2) preferred a data center development (8%). Additionally, Staff received a petition in opposition of a data center development, and in support of a residential development, from surrounding property owners on April 26. Said petition included 69 signatures and has not been reviewed or analyzed by Staff.
-Inquiries-
Common public inquiries included, but were not limited to, the use of the site as a school, park, or renovated Fire Station. There were also multiple inquiries as to whether the data center could be sited elsewhere in the community.
-Opposition to Data Center-
For those opposed to the data center concept, common comments included concerns with decreased property values, presence and view of a data center being undesirable, compatibility with the character of surrounding properties, noise, and long term risk/potential re-use of the site.
-Support of Data Center-
For those in opposition of a residential development, common concerns were centered around the high traffic impact of a residential development and the negative effect a residential development would have on the privacy of surrounding property owners (when compared to a data center).
Attached to this case is extensive information attained through the public input process.
Over the past few months, Staff has received inquiries from national builders and commercial real estate agents, Connexus Energy and the State of Minnesota regarding the development of the Subject Property for a data center user(s). Staff has not worked directly with any data center prospects (i.e. end users). However, it is Staff's opinion there is a strong market for data centers and the Subject Property would attract development.
NOTE: the City will not work directly with end users interested in utilizing the Subject Property until the City's Comprehensive Plan and Official Zoning Map is amended (data center or residential).
Observations:
Upon completion of the public open house in April, Staff analyzed input received from surrounding property owners and attempted to address common concerns raised in relation to the proposed data center development. The purpose of the information below is to (A) identify concerns that were raised; and, (B) attempt to provide the Council with a options to mitigate said concerns.
This information is broken down into two sections. The first section (open house) outlines specific concerns with specific mitigation options. The second section (revised feasibility and concept maps) includes updated analytical information based the mitigation options presented by Staff.
SECTION 1: OPEN HOUSE
Concerns listed below were raised at the public Open House regarding the development of the Subject Property for a data center user(s).
Noise
A number of residents raised concerns regarding the noise data center generators and air conditioning units would create.
Data centers do require significantly sized backup power generators. Additionally, data centers do create a significant level of heat due to the extensive use of computer servers; therefore, significant use of air-conditioning units is required. Both types of equipment, generators and air conditioning units, do create noise pollution. However, it is important to note, generators will only be operational in situations where regular power supply is lost/threatened and during monthly testing. Generators are not run regularly.
Noise pollution concerns can be mitigated with proper land use regulations. For example, increased building setbacks, requiring enclosed/indoor storage of generators, requiring air conditioning units to be located at the center of building rooftops and establishing noise restrictions on the Subject Property.
For example, the Cities of Anoka and Chaska have noise decibel (dB) restrictions; 65Db and 55dB respectively. The City of Ramsey could consider adopting a noise decibel (dB) restriction on the Subject Property of 55dB. 55dB is often compared to office noise, normal conversation, living room in suburban area, typical business office, library, moderate sound and a quiet house.
It should be noted that the City currently has dB restrictions within the existing City Code that are fairly close to the above samples. The City could choose to establish site-specific noise regulations through a number of tools.
Visual/Aesthetics
A number of residents raised concerns regarding the “look” and “presence” of a data center facility. Further, it has been stated a data center building would be an "eye sore."
At full build out, a data center structure would be significantly sized when compared to surrounding single family residential structures. It is staff’s estimation the site could sustain a maximum 195,000 square foot building.
Visual/Aesthetic concerns can be mitigated through land use regulations. For example, the City could require larger building setbacks, dictate a maximum building height, require a high standard of building materials and mandate proper screening (e.g. landscaping, berming plantings, etc.). In addition, the City has the ability to establish architectural standards in addition to the above bulk standards to make the architecture more conducive of a residential surrounding. Regarding the view of generators and water tanks, the City has the ability to require said units be enclosed or even located indoors.
It is important to note, the City can mitigate the visual/aesthetic effect of a data center development; however, it cannot not eliminate said concern.
Traffic
A number of residents raised concerns regarding traffic. Some residents were concerned that busy data center employees would drive carelessly through surrounding neighborhoods and decrease safety.
At full build out, a data center development would have significantly lower traffic impact on surrounding properties than would a residential development. It is estimated a data center development would create 64-96 vehicle trips per day and a residential development create 470 trips per day (at full build out). It is proposed, a data center development would attain road access exclusively from Nowthen Boulevard; and that a residential development would attain road access to Helium Street.
The City did receive a response from the Anoka County Highway Department on the preliminary sketches. Anoka County's response was that they desire to eliminate the access onto Nowthen Boulevard, as the current alignment interferes with future turn lanes and restricted turn movements. Staff is working with County Staff to clarify and explore all options. Staff would have a more formal answer as part of the formal amendment process.
Spot Zoning
Several residents indicated using the Subject Property for a data center would be considered “spot zoning.” NOTE: “spot zoning” is not addressed in State Statute; it is a part of case law and planning literature.
Staff had a chance to review the Subject Property with the League of Minnesota Cities, the City’s Planning Division, and the City Attorney. Considering the follow factors, Staff does not believe the City is in violation of "Spot zoning": large size of the Subject property, the City is using the property for a rational use, there is a public purpose for developing the Subject Property, the previous/anticipated use of the Subject Property was for either a school/municipal center complex, the City would enforce strict land use regulations to ensure a data center use would transition/be compatible with surrounding properties and the City would pass a Comprehensive Plan Amendment before moving forward.
Property Values
Nearly all residents indicated the establishment of a data center development would reduce the value of their homes; and therefore is undesirable.
It is possible the establishment of a data center development would reduce the value of surrounding properties. However, it is also possible the establishment of a data center development could sustain or even increase the value of surrounding properties; depending on the quality of the project and the required screening/land use regulations (when compared to the alternative). This item is subjective.
Staff had a chance to review this item with the League of Minnesota Cities and the City Attorney. Most case law indicates this conclusion is subjective and unclear.
Staff would recommend the City update their comprehensive plan to reflect the desired zoning before moving forward with either development scenario (residential or data center).
Risk/Market Failure
A number of residents are concerned that a data center development will eventually fail; and, that another type of user would eventually take over. Said user may not work well with surrounding properties.
Like any business, the risk of a data center development failing is real. The City does not have the ability to mitigate this risk. However, in the event a data center user failed, the City does have the ability to regulate the next user. It is likely, an office type reuse would fit in best with surrounding properties. The City has the ability to control the use of the Subject Property through land use regulations; in this case, a Planned Unit Development (PUD) or an Overlay District.
Use of Subject Property for a Park
Several residents indicated the City should develop the entire Subject Property into a park.
If a data center project was located on the Subject Property, Staff would recommend the Council consider dedicating a piece of land for public open space (programming to be determined). Staff has reflected this recommendation in the revised site concept plans.
When considering dedicating the entire Subject Property for a public park, Staff has the following comments: over the course of the last decade, as new single family homes and town-home developments have been platted near the Subject Property, the Park and Recreation Commission has examined the need for recreational amenities and associated trail connections. Finding that there is adequate recreation and open space in the larger vicinity of the former Municipal Center, the City has focused on trail development; and, this part of Ramsey now has the most comprehensive trail and connected trail system within the entire City.
A summary of park amenities nearby the Subject Property includes the two community parks of Elmcrest and Alpine; and play equipment at Alpine, Woodland Green, Solstice and the school. Athletic fields at Alpine, Elmcrest, the school, Solstice, Woodland Green and Bear Park. Open space at all of the above, plus Sunfish Lake Park and the scout camp as well as other city-owned lands. In addition to the common recreational amenities at these parks, at Alpine there is a concrete skate park, free canoes and kayaks at Sunfish Lake, and ice skating and a warming house at the 60-acre Ramsey Elementary immediately west of the former Municipal Center.
Better Locations
Residents at the public open house indicated there are "better locations" for a data center in Ramsey; and that the Subject Property should not be considered.
Considering the requirements of a data center development, the Subject Property is the only substantial available site in the City of Ramsey. Requirements include: redundant fiber, redundant electricity, city utilities, minimum distance from city services, minimum distance from train tracks, minimum distance from a river, minimum distance from an electrical substation and a substantially sized site.
It was suggested by an attendee of the Open House that the site at the north east intersection of Saint Francis Boulevard (Highway 47) and Alpine Drive should be explored. This site is adjacent to Bill's Superette and Evergreen Pointe Townhomes. Staff did review the feasibility of this site. The site may be able to sustain some sort of data center development; however, it would not sustain the size or scenario being discussed with the current concepts and would be much smaller, if at all. The physical conditions such as site criteria, setbacks, wetlands, and actual property boundaries limit these opportunities.
Anoka Hennepin School District Use
Several residents indicated the Subject Property should be used for an Anoka Hennepen School District school campus. Staff made contact with the School District and has received word their organization is not interested in the Subject Property now or into the foreseeable future.
Fire Station Use
At the public Open House, a number of residents questioned why the City's Fire Station #2 needed to be moved from it's current location. The City's Fire Department has examined said possibility. It has been concluded the configuration and condition of buildings located on the Subject Property are inadequate for a permanent fire station.
SECTION 2: REVISED FEASIBILITY STUDY/CONCEPTS
As a result of the public input process, staff made a number of revisions to the proposed data center development scenarios as follows:
Building setbacks
Building setbacks are proposed to be increased from 125' to 200'; which is over three times the distance normally required by City Zoning Code. Increased building setbacks help mitigate noise, safety, visual/aesthetics and compatibility concerns. Attached to this case are examples of setbacks for data centers in other communities.
Placement of generators and air conditioning units
It is proposed all generators be enclosed or placed within a data center facility. It is also proposed air conditioning units be enclosed or located at the center of data center facility roof tops. Proper location of generators and air conditioning units help mitigate noise and visual/aesthetics concerns.
Establish 55dB noise regulations
It is proposed the City establish noise regulations making 55dB the maximum decibel of noise allowed from the Subject Property (similar to Chaska). Noise regulations help mitigate noise concerns.
Provide public open space
It is proposed the City utilize land located in the northeast corner of the Subject Property as public open space. Various options exist for utilization of the proposed open space. Public open space mitigates safety and compatibility concerns.
Updated Feasibility Study & Concept Maps
As a result of revisions to the site map concepts (reviewed above), and a recent market value appraisal for the Subject Property, Staff made a number of revisions to the feasibility study for the development of the Subject Property.
In summary, results of the revised feasibility study are similar to the the original feasibility study: a data center development is significantly more beneficial to the City (financially) than a residential development. Estimated City tax revenues from a data center development range from $124,807 to $118,596 annually; whereas, a residential development is estimated to produce $28,263 annually.
Other taxing jurisdictions would also benefit from a data center development. Estimated TOTAL tax revenues from a data center development range from $968,336 to $920,150 annually; whereas, a residential development is estimated to produce $92,013 annually.
Considering land only: The appraised value of the Subject Property for data center is $1,275,000; and, the appraised value of the Subject Property for a residential development $650,000.
Considering the estimated market value of an entire project: the value of data center is $24,150,300 (one user) and $22,950,300 (two users) and the value of residential development is $7,632,941.
EDA Input
On May 16 the EDA reviewed information collected from the April public input meeting and the revised (mitigated) site plan concepts and feasibility study. The EDA had the following comments to provide the City Council:
• Considering the mitigated data center site plan, the EDA is in favor of pursuing a Comprehensive Plan Amendment to allow for a data center user.
• The mitigated site plan is a compromise with surrounding property owners; it addresses most concerns raised during the public input process.
• The EDA believes the data center concept is in line with Council and EDA goals.
• The EDA would like to remain transparent and open with surrounding property owners. The EDA would like a mailing sent to surrounding property owners before the City Council directs Staff (and the Planning Commission) to either move forward/not move forward with a Comprehensive Plan Amendment; said letter would be an invite to submit comments and attend said Council meeting.
• The EDA would like a webpage set up for this project.
• The EDA is also in favor of the residential site plan concept; and would be in favor of pursuing zoning to allow for said use. However, the EDA would recommend the City pursue a data center user first.
• In general, the EDA is not interested in a nonprofit entity utilizing the subject property. However, if the data center and residential concepts do not gain traction, they would be willing to consider.
• Considering the data center concept, the City Council should strongly consider the proposed open space; as it would be very important to surrounding property owners.
• One EDA member was opposed to moving forward with a data center development.
• One EDA member indicated it would be wrong to push something through given the current level of opposition. Said member later indicated the mitigated data center site plan was sufficient.
Staff had previously noted a potential second open house due to poor weather conditions (snow event) during the original open house. Staff has not suggested a second open house to date, however would note ample opportunity for public input through two (2) separate processes (1. Comprehensive Plan Amendment and 2. Zoning Amendment). Staff would support providing time on the evening of the Planning Commission Meeting prior to the Public Hearing to have Staff available to provide background on the concepts.
This information is broken down into two sections. The first section (open house) outlines specific concerns with specific mitigation options. The second section (revised feasibility and concept maps) includes updated analytical information based the mitigation options presented by Staff.
SECTION 1: OPEN HOUSE
Concerns listed below were raised at the public Open House regarding the development of the Subject Property for a data center user(s).
Noise
A number of residents raised concerns regarding the noise data center generators and air conditioning units would create.
Data centers do require significantly sized backup power generators. Additionally, data centers do create a significant level of heat due to the extensive use of computer servers; therefore, significant use of air-conditioning units is required. Both types of equipment, generators and air conditioning units, do create noise pollution. However, it is important to note, generators will only be operational in situations where regular power supply is lost/threatened and during monthly testing. Generators are not run regularly.
Noise pollution concerns can be mitigated with proper land use regulations. For example, increased building setbacks, requiring enclosed/indoor storage of generators, requiring air conditioning units to be located at the center of building rooftops and establishing noise restrictions on the Subject Property.
For example, the Cities of Anoka and Chaska have noise decibel (dB) restrictions; 65Db and 55dB respectively. The City of Ramsey could consider adopting a noise decibel (dB) restriction on the Subject Property of 55dB. 55dB is often compared to office noise, normal conversation, living room in suburban area, typical business office, library, moderate sound and a quiet house.
It should be noted that the City currently has dB restrictions within the existing City Code that are fairly close to the above samples. The City could choose to establish site-specific noise regulations through a number of tools.
Visual/Aesthetics
A number of residents raised concerns regarding the “look” and “presence” of a data center facility. Further, it has been stated a data center building would be an "eye sore."
At full build out, a data center structure would be significantly sized when compared to surrounding single family residential structures. It is staff’s estimation the site could sustain a maximum 195,000 square foot building.
Visual/Aesthetic concerns can be mitigated through land use regulations. For example, the City could require larger building setbacks, dictate a maximum building height, require a high standard of building materials and mandate proper screening (e.g. landscaping, berming plantings, etc.). In addition, the City has the ability to establish architectural standards in addition to the above bulk standards to make the architecture more conducive of a residential surrounding. Regarding the view of generators and water tanks, the City has the ability to require said units be enclosed or even located indoors.
It is important to note, the City can mitigate the visual/aesthetic effect of a data center development; however, it cannot not eliminate said concern.
Traffic
A number of residents raised concerns regarding traffic. Some residents were concerned that busy data center employees would drive carelessly through surrounding neighborhoods and decrease safety.
At full build out, a data center development would have significantly lower traffic impact on surrounding properties than would a residential development. It is estimated a data center development would create 64-96 vehicle trips per day and a residential development create 470 trips per day (at full build out). It is proposed, a data center development would attain road access exclusively from Nowthen Boulevard; and that a residential development would attain road access to Helium Street.
The City did receive a response from the Anoka County Highway Department on the preliminary sketches. Anoka County's response was that they desire to eliminate the access onto Nowthen Boulevard, as the current alignment interferes with future turn lanes and restricted turn movements. Staff is working with County Staff to clarify and explore all options. Staff would have a more formal answer as part of the formal amendment process.
Spot Zoning
Several residents indicated using the Subject Property for a data center would be considered “spot zoning.” NOTE: “spot zoning” is not addressed in State Statute; it is a part of case law and planning literature.
Staff had a chance to review the Subject Property with the League of Minnesota Cities, the City’s Planning Division, and the City Attorney. Considering the follow factors, Staff does not believe the City is in violation of "Spot zoning": large size of the Subject property, the City is using the property for a rational use, there is a public purpose for developing the Subject Property, the previous/anticipated use of the Subject Property was for either a school/municipal center complex, the City would enforce strict land use regulations to ensure a data center use would transition/be compatible with surrounding properties and the City would pass a Comprehensive Plan Amendment before moving forward.
Property Values
Nearly all residents indicated the establishment of a data center development would reduce the value of their homes; and therefore is undesirable.
It is possible the establishment of a data center development would reduce the value of surrounding properties. However, it is also possible the establishment of a data center development could sustain or even increase the value of surrounding properties; depending on the quality of the project and the required screening/land use regulations (when compared to the alternative). This item is subjective.
Staff had a chance to review this item with the League of Minnesota Cities and the City Attorney. Most case law indicates this conclusion is subjective and unclear.
Staff would recommend the City update their comprehensive plan to reflect the desired zoning before moving forward with either development scenario (residential or data center).
Risk/Market Failure
A number of residents are concerned that a data center development will eventually fail; and, that another type of user would eventually take over. Said user may not work well with surrounding properties.
Like any business, the risk of a data center development failing is real. The City does not have the ability to mitigate this risk. However, in the event a data center user failed, the City does have the ability to regulate the next user. It is likely, an office type reuse would fit in best with surrounding properties. The City has the ability to control the use of the Subject Property through land use regulations; in this case, a Planned Unit Development (PUD) or an Overlay District.
Use of Subject Property for a Park
Several residents indicated the City should develop the entire Subject Property into a park.
If a data center project was located on the Subject Property, Staff would recommend the Council consider dedicating a piece of land for public open space (programming to be determined). Staff has reflected this recommendation in the revised site concept plans.
When considering dedicating the entire Subject Property for a public park, Staff has the following comments: over the course of the last decade, as new single family homes and town-home developments have been platted near the Subject Property, the Park and Recreation Commission has examined the need for recreational amenities and associated trail connections. Finding that there is adequate recreation and open space in the larger vicinity of the former Municipal Center, the City has focused on trail development; and, this part of Ramsey now has the most comprehensive trail and connected trail system within the entire City.
A summary of park amenities nearby the Subject Property includes the two community parks of Elmcrest and Alpine; and play equipment at Alpine, Woodland Green, Solstice and the school. Athletic fields at Alpine, Elmcrest, the school, Solstice, Woodland Green and Bear Park. Open space at all of the above, plus Sunfish Lake Park and the scout camp as well as other city-owned lands. In addition to the common recreational amenities at these parks, at Alpine there is a concrete skate park, free canoes and kayaks at Sunfish Lake, and ice skating and a warming house at the 60-acre Ramsey Elementary immediately west of the former Municipal Center.
Better Locations
Residents at the public open house indicated there are "better locations" for a data center in Ramsey; and that the Subject Property should not be considered.
Considering the requirements of a data center development, the Subject Property is the only substantial available site in the City of Ramsey. Requirements include: redundant fiber, redundant electricity, city utilities, minimum distance from city services, minimum distance from train tracks, minimum distance from a river, minimum distance from an electrical substation and a substantially sized site.
It was suggested by an attendee of the Open House that the site at the north east intersection of Saint Francis Boulevard (Highway 47) and Alpine Drive should be explored. This site is adjacent to Bill's Superette and Evergreen Pointe Townhomes. Staff did review the feasibility of this site. The site may be able to sustain some sort of data center development; however, it would not sustain the size or scenario being discussed with the current concepts and would be much smaller, if at all. The physical conditions such as site criteria, setbacks, wetlands, and actual property boundaries limit these opportunities.
Anoka Hennepin School District Use
Several residents indicated the Subject Property should be used for an Anoka Hennepen School District school campus. Staff made contact with the School District and has received word their organization is not interested in the Subject Property now or into the foreseeable future.
Fire Station Use
At the public Open House, a number of residents questioned why the City's Fire Station #2 needed to be moved from it's current location. The City's Fire Department has examined said possibility. It has been concluded the configuration and condition of buildings located on the Subject Property are inadequate for a permanent fire station.
SECTION 2: REVISED FEASIBILITY STUDY/CONCEPTS
As a result of the public input process, staff made a number of revisions to the proposed data center development scenarios as follows:
Building setbacks
Building setbacks are proposed to be increased from 125' to 200'; which is over three times the distance normally required by City Zoning Code. Increased building setbacks help mitigate noise, safety, visual/aesthetics and compatibility concerns. Attached to this case are examples of setbacks for data centers in other communities.
Placement of generators and air conditioning units
It is proposed all generators be enclosed or placed within a data center facility. It is also proposed air conditioning units be enclosed or located at the center of data center facility roof tops. Proper location of generators and air conditioning units help mitigate noise and visual/aesthetics concerns.
Establish 55dB noise regulations
It is proposed the City establish noise regulations making 55dB the maximum decibel of noise allowed from the Subject Property (similar to Chaska). Noise regulations help mitigate noise concerns.
Provide public open space
It is proposed the City utilize land located in the northeast corner of the Subject Property as public open space. Various options exist for utilization of the proposed open space. Public open space mitigates safety and compatibility concerns.
Updated Feasibility Study & Concept Maps
As a result of revisions to the site map concepts (reviewed above), and a recent market value appraisal for the Subject Property, Staff made a number of revisions to the feasibility study for the development of the Subject Property.
In summary, results of the revised feasibility study are similar to the the original feasibility study: a data center development is significantly more beneficial to the City (financially) than a residential development. Estimated City tax revenues from a data center development range from $124,807 to $118,596 annually; whereas, a residential development is estimated to produce $28,263 annually.
Other taxing jurisdictions would also benefit from a data center development. Estimated TOTAL tax revenues from a data center development range from $968,336 to $920,150 annually; whereas, a residential development is estimated to produce $92,013 annually.
Considering land only: The appraised value of the Subject Property for data center is $1,275,000; and, the appraised value of the Subject Property for a residential development $650,000.
Considering the estimated market value of an entire project: the value of data center is $24,150,300 (one user) and $22,950,300 (two users) and the value of residential development is $7,632,941.
EDA Input
On May 16 the EDA reviewed information collected from the April public input meeting and the revised (mitigated) site plan concepts and feasibility study. The EDA had the following comments to provide the City Council:
• Considering the mitigated data center site plan, the EDA is in favor of pursuing a Comprehensive Plan Amendment to allow for a data center user.
• The mitigated site plan is a compromise with surrounding property owners; it addresses most concerns raised during the public input process.
• The EDA believes the data center concept is in line with Council and EDA goals.
• The EDA would like to remain transparent and open with surrounding property owners. The EDA would like a mailing sent to surrounding property owners before the City Council directs Staff (and the Planning Commission) to either move forward/not move forward with a Comprehensive Plan Amendment; said letter would be an invite to submit comments and attend said Council meeting.
• The EDA would like a webpage set up for this project.
• The EDA is also in favor of the residential site plan concept; and would be in favor of pursuing zoning to allow for said use. However, the EDA would recommend the City pursue a data center user first.
• In general, the EDA is not interested in a nonprofit entity utilizing the subject property. However, if the data center and residential concepts do not gain traction, they would be willing to consider.
• Considering the data center concept, the City Council should strongly consider the proposed open space; as it would be very important to surrounding property owners.
• One EDA member was opposed to moving forward with a data center development.
• One EDA member indicated it would be wrong to push something through given the current level of opposition. Said member later indicated the mitigated data center site plan was sufficient.
Staff had previously noted a potential second open house due to poor weather conditions (snow event) during the original open house. Staff has not suggested a second open house to date, however would note ample opportunity for public input through two (2) separate processes (1. Comprehensive Plan Amendment and 2. Zoning Amendment). Staff would support providing time on the evening of the Planning Commission Meeting prior to the Public Hearing to have Staff available to provide background on the concepts.
Funding Source:
There is no funding required at this time to consider submitting an application to begin the Comprehensive Plan Amendment process. However, there will be personnel time required to prepare the necessary materials for the amendment. Staff may need to supplement Staff resources with contracted services under the existing contracted planner.
Staff Recommendation:
In order to move forward with either development scenario, the City must pass a Comprehensive Plan Amendment. Staff would ask the City Council provide direction on which development scenario to pursue. Listed below are a number of recommendations for Council consideration. NOTE: attached to this case is a "Development Scenarios Comparison Chart."
EDA INPUT: Submit a Comprehensive Plan Amendment Application to the Planning Commission to allow for a data center user on the Subject Property. Specific comments are included in the observation section of this case.
PUBLIC INPUT: Based on public input received, Staff would summarize the direction of surrounding property owners to be: Submit a Comprehensive Plan Amendment Application to the Planning Commission to allow for a residential development on the Subject Property. Specific comments are included in the attachments to this case.
STAFF INPUT:
(A) Based on public input received, it is clear there is a strong desire for the Subject Property not to be developed for a data center user. When considering existing surrounding land uses, a residential development is the most compatible use for the Subject Property. Staff would be in support of developing the Subject Property as a residential neighborhood.
(B) Based on the cost-benefit analysis, EDA/Council strategic goals and the need for a new Fire Station #2, a data center development is more beneficial to the community as a whole. With proper land use mitigation practices, and a proper public input process, Staff would be in support of a data center development.
EDA INPUT: Submit a Comprehensive Plan Amendment Application to the Planning Commission to allow for a data center user on the Subject Property. Specific comments are included in the observation section of this case.
PUBLIC INPUT: Based on public input received, Staff would summarize the direction of surrounding property owners to be: Submit a Comprehensive Plan Amendment Application to the Planning Commission to allow for a residential development on the Subject Property. Specific comments are included in the attachments to this case.
STAFF INPUT:
(A) Based on public input received, it is clear there is a strong desire for the Subject Property not to be developed for a data center user. When considering existing surrounding land uses, a residential development is the most compatible use for the Subject Property. Staff would be in support of developing the Subject Property as a residential neighborhood.
(B) Based on the cost-benefit analysis, EDA/Council strategic goals and the need for a new Fire Station #2, a data center development is more beneficial to the community as a whole. With proper land use mitigation practices, and a proper public input process, Staff would be in support of a data center development.
Action:
Submit a Comprehensive Plan Amendment Application to the Planning Commission to allow for a data center user on the Subject Property.
-and/or-
Submit a Comprehensive Plan Amendment Application to the Planning Commission to allow for a residential development on the Subject Property.
Attachments
- OLD Concept Maps
- NEW Concept Maps
- Cost Benefit Analysis (June 5)
- Site Location Map
- Development Scenarios Comparison Chart
- REF MAP
- Council Meeting Invite (letter 2)
- Public Open House Invite Letter
- Public Open House Petition
- Public Open House Attendees Maps All
- Public Open House Phone Calls and Emails Received
- Process Timeline 06062013
- Example Data Centers (Building Set Backs)
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Brian Hagen | Tim Gladhill | 06/06/2013 11:48 AM |
| Kurt Ulrich | Kurt Ulrich | 06/06/2013 03:42 PM |
- Form Started By:
- Patrick Brama
- Started On:
- 06/05/2013
- Final Approval Date:
- 06/06/2013