Skip to main content

AgendaQuick™

View Agenda Item

6.2.
Public Works Committee
Meeting Date:
05/16/2017
By:
Bruce Westby, Engineering/Public Works

Title:

Review Preliminary Plans for Improvement Project #17-04, Sunwood Drive Striping Improvements.

Purpose/Background:

Purpose:
The purpose of this case is to review preliminay plans for Improvement Project #17-04, Sunwood Drive Striping Improvements.
 
Background:
The existing striping along Sunwood Drive between Armstrong Boulevard and Ramsey Boulevard is missing or faded in many areas, and some areas are no longer striped appropriately based on recent development that occurred since the street was originally striped.  Staff is therefore in the process of preparing preliminary plans for Improvement Project #17-04, Sunwood Drive Striping Improvements, and will present the plans to the Public Works Committee at the meeting.

In summary, the preliminary plans represent a design that replaces all existing Center Two-Way Turn Lanes with dedicated left turn lanes, which will result in less driver confusion.  The plans also include a dedicated left turn lane for westbound vehicles to use when  turning into Casey's , as well as a dedicated left turn lane for westbound vehicles turning into the Residence at the COR.

At the time this case was prepared, Staff was still developing preliminary plans.  Preliminary plans will therefore be presented to the Public Works Committee during the meeting.
 

Timeframe:

Staff estimates 10 minutes will be required to present this case and respond to questions.

Observations/Alternatives:

N/A

Funding Source:

Preliminary estimated costs will be presented during the meeting, along with the preliminary plans.

Recommendation:

N/A

Action:

N/A

Attachments

No file(s) attached.

Form Review

Inbox Reviewed By Date
Grant Riemer MaryJo Warner 05/11/2017 09:49 AM
Kurt Ulrich MaryJo Warner 05/11/2017 04:08 PM
Form Started By:
Bruce Westby
Started On:
05/10/2017 02:49 PM
Final Approval Date:
05/11/2017