6.1.
Public Works Committee
- Meeting Date:
- 09/19/2017
- By:
- Bruce Westby, Engineering/Public Works
Title:
Staff Updates on Improvement Projects and Items of Interest
Purpose/Background:
The purpose of this case is to update the Public Works Committee on current and proposed improvement projects within the City, and on other items of interest to the Committee.
City Improvement Projects
Anoka County Improvement Projects
MnDOT Improvement Projects
Items of Interest
Puma St Infrastructure Improvements
City Improvement Projects
- Riverdale Drive Extension - Traprock St. to Ramsey Blvd. (#16-20)
- This project completes the south Highway 10 frontage road between Llama Street and Tungsten Street
- Construction began last week
- Construction will be substantially complete by November 2017
- Final completion will occur in 2018
- Sunwood Drive Reconstruction (#17-00)
- Construction is substantially complete
- Final completion will occur in 2018
- Alpine Drive Reconstruction (#17-01)
- Construction is substantially complete
- Final completion will occur in 2018
- 2017 Crackseal and Sealcoat Improvements (#17-03)
- Approximately 13.6 miles of public streets throughout the City were crack sealed and sealcoated
- Construction is substantially complete, but striping remained as of the time this report was prepared
- Sunwood Drive Striping Improvements (#17-04)
- The concrete pavement on Sunwood Drive between Zeolite Street and Rhinestone is being restriped
- Construction is scheduled to be complete before September 19
- Bunker Lake Boulevard Utilities Extensions (#17-09)
- Construction is complete
Anoka County Improvement Projects
- Hanson Boulevard/CSAH 78 Grade Separation @ BNSF Railway Crossing (2017)
- Reconstruct County State Aid Highway 78 (CSAH 78) / Hanson Boulevard to a 4-lane divided section
- Construct a grade-separated overpass for Burlington Northern Sante Fe (BNSF) railway crossing
- Hanson Boulevard/CSAH 78 Reconstruction (2018)
- Expand CSAH 78 / Hanson Blvd between 139th Ave and CSAH 18 / Crosstown Blvd to 4-lane divided section
- Foley Boulevard/CSAH 11 Grade Separation @ BNSF Railway Crossing
- This project is currently unscheduled and unfunded
MnDOT Improvement Projects
- Trunk Highway 10 Cable Median Barrier Installation (2018)
- Install cable median barrier along Highway 10 between Thurston Avenue and Highway 101
- Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Railway Crossing (2017)
- Preliminary design in progress
Items of Interest
Puma St Infrastructure Improvements
Timeframe:
Staff estimates that 5 minutes will be needed for updates and discussion.
Observations/Alternatives:
N/A
Funding Source:
N/A
Recommendation:
N/A
Action:
No formal action is required. For Committee review and discussion purposes only.
Attachments
No file(s) attached.
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Grant Riemer | Grant Riemer | 09/13/2017 03:03 PM |
| Kurt Ulrich | Kurt Ulrich | 09/14/2017 03:34 PM |
- Form Started By:
- Bruce Westby
- Started On:
- 09/13/2017 10:59 AM
- Final Approval Date:
- 09/14/2017