Regular Items 3.
Infrastructure Committee
- Meeting Date:
- 01/27/2025
COMMITTEE:
Infrastructure
CONTACT:
Louis Najar
CHAIR:
Darrell Johnson
ACTION REQUESTED:
Consider PO ratification for PO 22501743 for repair of 20” water line leak on West Bland St. to White Cloud Pipeline for $104,554.27 including GRT.
BACKGROUND:
Initiated by: Andrew Valadez
The City has a large diameter water line break on an 20” concrete transmission line on West Bland Rd. The large diameter water line repair work was awarded to White Cloud Pipeline utilizing RFP-25-001 On Call Utility Repair Services. This is specialized repair work which requires an excavator, shoring equipment and welding steel reinforcement bands.
The City has a large diameter water line break on an 20” concrete transmission line on West Bland Rd. The large diameter water line repair work was awarded to White Cloud Pipeline utilizing RFP-25-001 On Call Utility Repair Services. This is specialized repair work which requires an excavator, shoring equipment and welding steel reinforcement bands.
FINANCIAL CONSIDERATION:
This item will be funded through the regular operating budget using the Infrastructure Maintenance and Repair account.
LEGAL REVIEW:
Not Applicable for this agenda item.
BOARD AND COMMITTEE ACTION:
Consider PO ratification for PO 22501743 for repair of 20” water line leak on West Bland St. to White Cloud Pipeline for $104,554.27 including GRT to February Finance Committee.