Commissioners Court Meeting
Monday, JULY 14, 2025 at 9:00 AM
| Tano E. Tijerina, | County Judge |
| Jesse Gonzalez, | Commissioner, Pct. 1 |
| Rosaura "Wawi" Tijerina, | Commissioner, Pct. 2 |
| John C. Galo, | Commissioner, Pct. 3 |
| Ricardo A. Jaime | Commissioner, Pct. 4 |
Thus constituting a quorum, the Commissioners Court proceeded to act upon the Agenda as posted in the meeting notice of the 11th day of July 2025. Present also were Ms. Carmen L. Saldaña, Recording Secretary representing Mrs. Margie Ramirez Ibarra, Ex-officio Clerk of the Commissioners Court, various officers and others interested in the business of the Court.
Motion by Commissioner, Pct. 3 John C. Galo, seconded by Commissioner, Pct. 2 Rosaura “Wawi” Tijerina to excuse Commissioner, Pct. 1 Jesse Gonzalez
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Motion by Commissioner, Pct. 3 John C. Galo, seconded by Commissioner, Pct 4. Ricardo A. Jaime to approve as per general order including checks ready to be released
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Motion by County Judge Tano E. Tijerina, seconded by Commissioner, Pct. 3 John C. Galo to approve ratification of payments
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Motion by Commissioner, Pct. 3 John C. Galo, seconded by County Judge Tano E. Tijerina not to exceed amount of $52,000.00 for the estimated future Casa Blanca payroll
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Motion by Commissioner, Pct. 3 John C. Galo, seconded by County Judge Tano E. Tijerina to approve by order the Wage & Pay Scale Budget Amendments
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
The consent agenda has been created in order to give constituents the opportunity to view any and all pertinent backup information with reference to any item in the agenda. The objective of the consent agenda is for all Webb County constituents to be familiar with everyday county business and to demonstrate the transparency and fairness of this Commissioners Court.
The following Agenda Items are of a routine nature, and the Commissioners Court has received supporting materials for consideration. All of these Agenda Items will be passed with one vote without being discussed separately, unless a member of the Commissioners Court or the public requests that a particular Agenda Item be discussed. If so, that Agenda Item will be pulled from the Consent Agenda and discussed as part of the regular Agenda at the appropriate time. One vote will approve the remaining items on the Consent Agenda.
| Acct. Number | Acct. Name | Adopted | Request | Current | End Bal. | |
| From: | 2162-259700 | Fund Balance | $62,000.00 | |||
| To: | 2162-2260-001-456205 | Training & Education | $40,000 | $30,000.00 | $17,337.42 | $47.337.42 |
| 2162-2260-001-460140 | Firearms and Ammunition | $6,400.00 | $25,000.00 | $5,070.00 | $35,070.00 | |
| 2162-2260-001-441001 | Telephone | $20,500.00 | $7,000.00 | $1,348.38 | $8,348.38 | |
| $62,000.00 |
Issue: Budget increase to cover training/travel expenses, telephone expenses, and investigator equipment.
Solution: Transfer of funds to the mentioned accounts.
Result: Funds will be available to cover all expenses.
| Acct. Number | Acct. Name | Request | |
| To: | 1001-1130-001-431007-010 | Operational Reserve | $1,577,328 |
Issue: Budget Officer has directed a quarterly payroll sweep.
Solution: Complete second quarterly payroll sweep.
Result: Savings for Operational Reserve and funds for various county projects.
Issue: The Commissioner Pct. 2 Department requests authorization to purchase chargers (Power Banks) for school events that is necessary for the benefit of the children of Webb County and community of Pct. 2.
Solution: Authorization by the Commissioners Court is necessary to approve said purchase.
Result: Authorizing the purchase of these items will better serve the children of Webb County and community of Pct 2.
Issue: The Webb County Judge's Department requests authorization to purchase Rotating Pill Organizers, Twist and Chill Fans, and Clear Cross-Body Bags.
Solution: Authorization by the Commissioners Court is necessary to approve said purchase.
Result: Authorizing the purchase of these items will better serve the community of Webb County.
Retail Energy Provider:
174 Power Global Retail Texas, LLC dba Chariot Energy
Issue: These vendor agreements are a Texas Department of Housing and Community Affairs (TDHCA) requirement.
Solution: The Webb County CAA will enter into a two-year vendor agreement with the Retail Energy Provider for the implementation of the Community Services Block Grant (CSBG) and the Comprehensive Energy Assistance Program (CEAP).
Result: The Texas Department of Housing and Community Affairs (TDHCA) will provide funding to be used for payment of qualifying low-income clients' home energy expenses.
Issue: TDHCA has awarded CAA a budget amendment under direct services under the CEAP Program.
Solution: Funds from Household Crisis were transferred into Program Expenditures in order to expend the budget.
Result: Webb County CAA Social Services will continue to provide direct services to eligible low-income residents of Webb County under the CEAP Program.
Issue: During harsh times, impoverished Webb County families are being left further behind economically as the high cost of diapers exacerbates and worsens the lack of affordable day care in the local community by adding yet another barrier to working families’ ability to climb out of poverty.
Solution: Court authorization for the purchase of diapering and menstrual products through the grant awarded by the Moody Foundation.
Result: Community Action Agency (CAA) will be able to establish a diaper resource center to provide additional services to the struggling individuals of Webb County.
Issue: TDHCA has awarded CAA a grant increase under the CSBG Program in the amount of $1,514.00.
Solution: The Court approval of CSBG Amendment #3 will benefit both operations and administrative expenses.
Result: Webb County CAA Social Services will continue to provide direct services to eligible low-income residents of Webb County under the CSBG Program.
Issue: Texas Health and Human Services Commission (Region 11, HHS Contract No 000158100) is an ongoing amendment that is ratified every year. The contract is amended to establish the fiscal Year 2025-2026 budget by adding funding in the amount of $25,000.20 for a total budget of $628,525.70 for home-delivered meals.
Solution: The discussion and possible action is to accept Amendment #21 with the current HHSC contract to provide Home-Delivered Meals to the elderly, home-bound residents of Webb County.
Result: The HHSC contract will provide an estimated 97,295 Home Delivered Meals from October 1, 2024, through September 30, 2026.
Issue: We currently have 16 Cisco IP Phones with over 10 years of use, which are malfunctioning. For example, there is white noise, which makes it hard to hear callers. After this purchase, we will only need to replace eight more phones, which could wait until next physical year.
Solution: With the approval of the Commissioner's Court, we would be able to proceed with this necessary purchase.
Result: These technological tools enable us to provide quality service.
Issue: The Webb County Purchasing Policy and the Texas Code of Criminal Procedure requires the Commissioners Court to authorize the use of funds from the Technology Fund. Subject to approval by the Commissioners Court, this fund may be used to assist a Constable Office with technology enhancements for operational use.
Solution: Consideration to authorize the purchase of allowable technology items in an amount not to exceed the projected budget listed in the subject area utilizing cooperative vendors.
Result: If approved, proceed with approved items and initiate the request to purchase the requested items for Constable Pct. 4 Office utilizing funds designed under JP 4 Technology Fund.
Issue: Jury plan needs to be updated to comply with provision from the Telephone Consumer Protection Act.
Solution: Recommendation to Commissioners Court for approval and to be adopted.
Result: Jury Plan will be up-to-date.
Issue: The Webb County Community Action Agency (WCCAA) was recently approved by the South Texas Food Bank as a food pantry site in order to serve the residents of Webb County, including the low-income, historically underserved but rapidly growing area where the WCCAA headquarters is located.
Solution: Proposed grant application will allow the WCCAA to help alleviate hunger and food insecurity for individuals and families residing in Webb County, Texas.
Result: The families and individuals experiencing hunger and food insecurity in Webb County, including those residing along Highway 359, will now have an additional resource to assist them in overcoming their struggles.
Issue: There is a need for additional services/expanded capacity to serve more impoverished elderly and/or disabled residents of Webb County.
Solution: Supplemental grant award will allow expanded capacity for additional home deliveries of hot, nutritious meals to elderly and/or disabled residents of Webb County, Texas.
Result: CAA’s Meals on Wheels Program will be able to provide additional services.
Issue: Rural Public Transportation is a grant-funded agency.
Solution: Through the approval of the Commissioners Court to submit the STATE application Webb County, will allow the department to receive funds.
Result: Approval of STATE contract application submission will ensure the continuation of transportation services to the rural areas of Webb County.
Issue: The following items have impacted the progress of the project: AEP Texas power connection (15 days), and other approved changes: chain link gates at the generator area, water treatment system, shelves for the pantry area, wheel stops at the canopy area and fire lane additions (15 days), the General Contractor requests that the current substantial completion date to be extended thirty (30) calendar days.
Solution: Approval of Change Order which will increase the contract time by thirty (30) days.
Result: Substantial completion date will be from July 9, 2025, to August 9, 2025.
Issue: The following items have impacted the progress of the project:
- Install furr wall to cover rough finish due to demolition of tile.
- Cut and cap a 6” water line that was found (not in plans) during the excavation of a storm drain line.
- Installation of carpet as requested by CAA in the Manager’s office.
- Ice maker relocation requested by CAA.
Some of the listed items and other items are due to relocation and/or demolition due to remodeling. These and other items may be found on the attached documents. The completion date will be extended thirty (30) calendar days.
Solution: Approval of Change Order which will increase the contract time by thirty (30) days.
Result: Substantial completion date will be from September 21, 2025 to October 21, 2025.
Disclaimer: All Head Start monies are 100% Federal funds
Slot #2036 becomes vacant 7/31/25.
| Slot# | Title | Hourly Rate | |
| From: | 2524 | Early Head Start Child Care Partnership Family Service Worker/AA |
$20.64 |
| To: | 2036 | Head Start Family Service Worker/AA | $21.27 |
| To Fill: | 2524 | Early Head Start Child Care Partnership Family Service Worker/AA |
$20.64 |
| Slot # | Title | Hourly Rate | Pay Periods |
| 979/ 2032/ 3002/ 3029 | Substitute | $11.94 | 20 |
| 1104/ 2048/ 2912 | Part-Time Classroom Aide | $11.94 | 20 |
| 1842 | Teacher / AA | $20.14 | 20 |
| 1042 | Teacher Assistant / ISD / CDA | $13.87 | 21 |
| 2964 | Office Clerk | $16.24 | 26 |
| 2556 | Early Head Start Teacher | $15.43-$15.86 | 26 |
Issue: Webb County is no longer under contract with AT&T for our Fiber ASE.
Solution: Approve the schedule agreement.
Result: Webb County will have a new pricing schedule for future connections.
| Slot # | Title | Salary |
| 2086 | Supervising Attorney | 25/N-W ($90,105.60 - $100,776.00) |
Issue: Slot #2086 became vacant on July 10, 2025. This slot may be filled from within, thus creating a vacant attorney slot.
Solution: Request is being made to post and fill the vacant Supervising Attorney slot (2086), and to post and fill any remaining vacant slots created by promoting from within.
Result: This action will allow our department to promote from within, fill any remaining vacant slots, and allow our department to continue to function efficiently and effectively.
Issue: Excess county property that is either by definition salvage or surplus property because of time, accident, or any other cause such as wear and deterioration, damage, or obsolete that has no value and/or usefulness for the intended purpose and is no longer needed by the department.
Solution: Authorize the Purchasing Agent to attempt to sell the County surplus or salvage property through public auction, dispose of or destroy property that cannot be sold through public auction because it has been deemed worthless or disposed of through a recycling program under which property is collected, separated, or processed and returned to use in the form of raw materials of new products and/or donate as permitted by state law.
Result: Generate auction revenue from sale of county property, reduce county expenditures by transferring surplus property to other departments.
Issue: Our nation is in the middle of a fentanyl epidemic where even a traffic stop can result in fentanyl poisoning for an officer. Banned substances need to be identified quickly, safely, and accurately to save lives and protect deputies.
Solution: Funding from the Operation Lone Star Grant for FY 2025 was awarded to Webb County for the purchase of a Handheld Mass Spectrometer Chemical Detection System for Gas/Vapor for the safety of Webb County law enforcement Officers.
Result: Proceed with the order of the approved purchase under the Operation Lone Star Grant. No impact to the General Fund.
Issue: F-250 Unit is funded for purchase through Operation Lone Star, awarded to the Webb County Sheriff's Office.
Solution: Approval of purchase from Commissioners Court.
Result: Approved Purchase order will be forwarded to Dana Safety Supply for official purchase.
Issue: The Webb County Jail’s Fourth Floor Recreation Area is in need of a comprehensive renovation.
Solution: Consideration to authorize the Purchasing Agent to seek cooperative pricing and/or formal competitive bids for the specifications required to install a durable, industrial-grade flooring system and wall coating that can address the existing structural and cosmetic deficiencies. The adopted FY 2025 budget for the Webb County Jail Division has surplus funds under capital outlay.
Result: If approved, the Purchasing Agent will proceed with the solicitation of this project and return for final approval for award by the Webb County Commissioners Court with approval to execute contract with awarded vendor.
| Acct. Number | Acct. Name | Adopted | Request | Current | End Bal. | |
| From: | 2024-259700 | Fund Balance | $35,000.00 | |||
| To: | 2027-2320-001-461009 | Pro Se Legal Assistance | $50,000.00 | $35,000.00 | $920.02 | $35,920.02 |
Issue: There is insufficient budget in the pro se litigant legal assistance account to cover the resource attorney vouchers for the remainder of the fiscal year.
Solution: Transfer funds to pay the resource attorney vouchers.
Result: There will be sufficient funds to pay the resource attorney vouchers for the remaining months of the fiscal year.
| Acct. Number | Acct. Name | Adopted | Request | Current | End Bal. | |
| From: | 1001-1280-001-443000-110 | Repairs & Maint. Software | $1,487,000 | $75,000 | $102,137 | $27,137 |
| To: | 1001-1280-001-460105-020 | Minor Tools & Apparatus SW & HW | $252,000 | $75,000 | $4,804 | $79,804 |
Issue: Equipment/Software needed for Webb County.
Solution: Authorize transfer of funds.
Result: Necessary equipment and software will be facilitated.
| Acct. Number | Acct. Name | Adopted | Request | Current | End Bal. | |
| From: | 7200-7080-001-443000-035 | Repairs & Maint Equipment | $125,280.00 | $6,000.00 | $65,580.52 | $59,580.52 |
| To: | 7200-7080-001-460105 | Minor Tools & Apparatus | $9,000.00 | $3,000.00 | $338.39 | $3,338.39 |
| 7200-7080-001-456105 | Licenses & Permits | $9,350.00 | $3,000.00 | $1,234.22 | $4,234.22 | |
| $6,000.00 |
Issue: The funds available in these accounts will not cover costs needed for the end of the budget year.
Solution: Approve line item transfer.
Result: Accounts will have sufficient funds to allow necessary expenses and permits needed for the department.
| Acct. Number | Acct. Name | Adopted | Request | Current | End Bal. | |
| From: | 6100-1090-001-432056-020 | Administration Fees | $603,305.00 | $142,000.00 | $269,369.23 | $127,369.23 |
| To: | 6100-1090-001-452015-005 | Plan Premiums Vision Aetna | $122,00.00 | $12,000.00 | $23,131.49 | $35,131.49 |
| 6100-1090-001-432056-025 | Administrative Fees | $1,522,846.00 | $130,000.00 | $302,586.04 | $432,586.04 | |
| $142,000.00 |
Issue: Budget line-item transfer is needed to cover the remainder of the 2025 fiscal year expenses.
Solution: Approve line-item transfer to fund adequately the accounts mentioned above for the remainder of the fiscal year.
Result: Approval of line-item transfer will result in having funds available for upcoming invoices.
| Acct. Number | Acct. Name | Adopted | Request | Current | End Bal. | |
| From: | 1001-1180-001-452001-010 | Insurance, Other Bonds & Insurance | $35,000.00 | $10,000.00 | $27,707.00 | $17,707.00 |
| To: | 1001-1180-001-461001 | Loss Control Program | $5,000.00 | $10,000.00 | $691.97 | $10,691.17 |
Issue: Risk Management has identified a need for additional Automated External Defibrillator (AED) machines and replacement batteries, as existing units are outdated. Furthermore, fire blankets are currently lacking in key areas where they may be critical during fire-related emergencies.
Solution: Approve line-item transfer to allocate funding for the purchase of new AED machines, replacement batteries, and fire blankets. This action will ensure that proper emergency equipment is available and accessible.
Result:This investment will enhance the County’s emergency preparedness and reduce risks and liabilities. Ensuring the availability of up-to-date safety equipment supports a proactive approach to risk management and reinforces the County’s commitment to public and employee safety.
| Acct. Number | Acct. Name | Adopted | Request | Current | End Bal. | |
| From: | 1001-3130-001-464005 | Books & Subscriptions | $3,000.00 | $1,442.32 | $2,442.32 | $1,000.00 |
| To: | 1001-3130-001-456305 | Uniforms | $3,000.00 | $1,442.32 | $329.89 | $1,772.21 |
Issue: Transfer of funds is required to cover estimated forecasted expenditures in the Uniform account, and New Inspector needs uniforms, respectively.
Solution: Approval of line item transfer to cover forecasted and possible unforeseen expenses.
Result: Line items will have sufficient funds and Fire Marshal's department operations will continue uninterrupted.
| Acct. Number | Acct. Name | Adopted | Request | Current | End Bal. | |
| From: | 1001-2310-001-444500 | Equipment Rental | $2,500.00 | $1,000.00 | $1,263.22 | $263.22 |
| To: | 1001-2310-001-461000 | Materials & Supplies | $18,000.00 | $1,000.00 | $2,746.71 | $3,746.71 |
Issue: There are insufficient funds to complete the fiscal year.
Solution: To transfer money into materials & supplies to purchase supplies needed.
Result: Approval of line item transfer will result in having funding available to purchase materials & supplies.
| Acct. Number | Acct. Name | Adopted | Request | Current | End Bal. | |
| From: | 2003-2310 | Fund Balance | $1,000.00 | |||
| To: | 2003-2310-001-410000 | Payroll Cost | $46,269.00 | $1,000.00 | $11,498.12 | $12,498.12 |
Issue: Shortage of funds for payroll for the remainder of the fiscal year based on current forecasts.
Solution: To seek authorization to transfer funds into payroll cost account to cover employee salary.
Result: To ensure adequate funding for the remainder of the current fiscal year’s payroll.
| Acct. Number | Acct. Name | Adopted | Request | Current | End Bal. | |
| From: | 2006-2310 | Fund Balance | $1,200.00 | |||
| To: | 2006-2310-001-41000 | Payroll | $59,958.00 | $1,200.00 | $14,904.08 | $16,104.08 |
Issue: Shortage of funds for payroll for the remainder of the fiscal year based on current forecasts.
Solution: To seek authorization to transfer funds into payroll cost account to cover employee salary.
Result: To ensure adequate funding for the remainder of the current fiscal year’s payroll.
| Acct. Number | Acct. Name | Adopted | Request | Current | End Bal. | |
| From: | 1001-1120-001-462605 | Fuel & Lubricants | $30,000 | $17,000 | $19,691.61 | $19,691.61 |
| To: | 1001-1120-001-443000-025 | Repair & Maint. Fuel Pumps | $10,000 | $17,000 | $17,483.16 | $17,483.16 |
Issue: Need additional funding to replace fuel station spill buckets as required by TCEQ.
Solution: Transfer funds as indicated above.
Result: Fuel station spill buckets will be replaced, and the R&B fuel station will be in compliance with TCEQ regulations.
| Acct. Number | Acct. Name | Adopted | Request | Current | End Bal. | |
| From: | 1001-3130-001-464010 | Dues & Memberships | $3,300 | $1,000 | $2,245.00 | $1,245.00 |
| To: | 1001-3130-001-441010 | Cell Phone Cost | $5,000 | $1,000 | $1,281.66 | $2,281.66 |
Issue: Discussion and possible action to approve the following line item transfer to cover cell phone costs:
Solution: The transferred monies will be used to cover the cell phone cost
Result: The transferred monies will be used to cover the cell phone costs.
Motion by Commissioner, Pct. 2 Rosaura “Wawi” Tijerina, seconded by County Judge Tano E. Tijerina to approve Consent Agenda
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Vote: 4 - 0 Motion Carried - Unanimously
Other:Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Issue: The District Attorney’s Office is requesting to hire a temporary part-time employee to move our current System Analyst. He is scheduled to resign on August 22, 2025. The proposed hourly rate of $48.08 is necessary to retain the current System Analyst so he can train the new System Analyst. This position bares critical system operational responsibilities.
Solution: Seek Commissioners Court approval to authorize a temporary exception to the $15.00/hour cap, allowing the District Attorney's Office to offer $48.08/hour for the training and onboarding of a temporary part-time employee.
Result: This action will ensure continuity of operations within the District Attorney’s Office by allowing sufficient time for training and knowledge transfer prior to the resignation of the System Analyst, without disruption to departmental functions.
Motion by County Judge Tano E. Tijerina, seconded by Commissioner, Pct 4. Ricardo A. Jaime to approve
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Issue: The Casa Blanca Golf Course is in need of newer golf carts for their customers. Webb County has the need and the opportunity to replace the entire fleet of golf carts with eighty (80) new ones.
Solution: Authorize the execution of a sixty (60) month lease with Huntington National Bank who is financing the rental of the eight (80) golf carts.
Result: The Golf Course Department will have enough carts to facilitate the growth and demand of increased rounds of golf at Casa Blanca, which will better serve the golfing community.
Motion by County Judge Tano E. Tijerina, seconded by Commissioner, Pct 4. Ricardo A. Jaime to table items #26 and #27
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Issue: The Casa Blanca Golf Course is in need of a utility vehicle designed for heavy-duty tasks involving hauling equipment and tools to transporting personnel.
Solution: Authorize the execution of a sixty (60) month lease with Huntington National Bank who is financing the rental of the Cushman Hauler.
Result: The Golf Course Department will allow Casa Blanca Golf Course personnel to be able to haul work equipment and tools throughout the golf course.
Issue: As the Webb County Volunteer Fire Department expands to insure the safety of Webb County residents, so does the demand for paid, certified, frontline firefighting personnel.
Solution: The acquisition of grant funds will offset Webb County personnel expenses for a three-year period.
Result: A healthy budgetary outlook for Webb County and the volunteer fire department.
Motion by Commissioner, Pct. 3 John C. Galo, seconded by Commissioner, Pct 4. Ricardo A. Jaime to approve
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Motion by County Judge Tano E. Tijerina, seconded by Commissioner, Pct. 3 John C. Galo to bring up Item #47
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Motion by Commissioner, Pct. 3 John C. Galo, seconded by Commissioner, Pct 4. Ricardo A. Jaime to approve
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Vote: 4 - 0 Motion Carried - Unanimously
Other:Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Issue: Webb County Justices of the Peace Courts provide truancy court for juveniles referred to their Courts by school districts for violation of compulsory state attendance laws. The Justices of the Peace require the presence of school district Attendance Officers in order to enforce these school compulsory attendance laws. These Attendance Officers, who assist the Justices of the Peace in providing court coordination of the truancy court docket, require their services be compensated (salary).
Solution: UISD and Webb County each pay ½ the salaries of Attendance Officers acting as Justice Court Coordinators overseeing the truancy court docket.
Motion by Commissioner, Pct. 3 John C. Galo, seconded by County Judge Tano E. Tijerina to bring back item at a future meeting
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Issue: Webb County Justices of the Peace Courts provide truancy court for juveniles referred to their Courts by school districts for violation of compulsory state attendance laws. The Justices of the Peace require the presence of school district Attendance Officers in order to enforce these school compulsory attendance laws. These Attendance Officers, who assist the Justices of the Peace in providing court coordination of the truancy court docket, require their services be compensated (salary).
Solution: UISD and Webb County each pay ½ the salaries of Attendance Officers acting as Justice Court Coordinators overseeing the truancy court docket.
Issue: Quantum Construction proposes to use a contingency allowance needed for the following additional items: caliche-material, steel bollards w/chain, pantry shelves, water treatment system and installation, chain link fence gates and caliche pad for the generator.
Solution: Consideration to authorize the use of $24,618.25 from the owner's contingency allowance funds.
Result: If approved, the Contractor will be authorized to use the owner's contingency amount as approved by Commissioners Court. There will be no increase or decrease to the original contract sum.
Motion by Commissioner, Pct 4. Ricardo A. Jaime, seconded by Commissioner, Pct. 3 John C. Galo to approve
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Motion by Commissioner, Pct. 3 John C. Galo, seconded by Commissioner, Pct 4. Ricardo A. Jaime to approve
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Issue: The funds in the amount of $41,380.00 are needed to fund the following:
- Install furr wall to cover rough finish due to demolition of tile.
- Cut and cap a 6” water line that was found (not in plans) during the excavation of a storm drain line.
- Installation of carpet as requested by CAA in the Manager’s office.
- Ice maker relocation requested by CAA.
Some of the listed items and other items are due to relocation and / or demolition due to remodeling. These and other items may be found on the attached documents.
Solution: Consideration to authorize the use of the Contingency Allowance
Result: If approved, the Contractor will be authorized to use the owner's contingency amount as approved by Commissioners Court. There will be no increase or decrease to the original contract sum.
Motion by Commissioner, Pct 4. Ricardo A. Jaime, seconded by Commissioner, Pct. 3 John C. Galo to approve
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Vote: 4 - 0 Motion Carried - Unanimously
Other:Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Motion by County Judge Tano E. Tijerina, seconded by Commissioner, Pct 4. Ricardo A. Jaime to open Public Hearing
Vote: 3 - 0 Motion Carried
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Commissioner, Pct. 3 John C. Galo (OUT OF THE COURTROOM)
County Judge, Tano E. Tijerina asked if anyone was for or against three times.
Motion by County Judge Tano E. Tijerina, seconded by Commissioner, Pct. 3 John C. Galo to close Public Hearing
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Issue: The City of Laredo is seeking Webb County’s assistance with renaming a portion of the Wormser Rd. realignment in order to maintain consistency across that transportation corridor East of the Cuatro Vientos Rd. to the new Sports Complex.
Solution: Renaming that portion of the realignment will maintain consistency across the transportation corridor without impacting E911 addresses East of the sports complex.
Result: The City’s request will be accomplished without any impacts to County residents along East Wormser Rd.
Motion by Commissioner, Pct. 3 John C. Galo, seconded by Commissioner, Pct 4. Ricardo A. Jaime to approve by order
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Issue: On September 25, 2023, RFP 2023-012 "Hybrid Audio/Video System for Juvenile Detention Center" was awarded to Rhodes Research. This project has a contractual completion timeline of 140 calendar days after the date of contract execution. The contractor did not initiate the installation phase and has exceeded the contractual timeline to complete the project.
Solution: Consideration to terminate contract for non-compliance of contractual timeline completion deadline and authorize the Purchasing agent to re-solicit this project to secure formal proposals with pricing for Court's review and approval.
Result: If approved, the contractor will receive a formal notice of termination.
Motion by Commissioner, Pct. 3 John C. Galo, seconded by Commissioner, Pct 4. Ricardo A. Jaime to approve
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Issue: On September 25, 2023, RFP 2023-011 "Hybrid Audio/Video System for Child Support Court" was awarded to Rhodes Research. This project has a contractual completion timeline of 140 calendar days after the date of contract execution. The contractor did not initiate the installation phase and has exceeded the contractual timeline to complete the project.
Solution: Consideration to terminate contract for non-compliance of contractual timeline completion deadline and authorize the Purchasing agent to re-solicit this project to secure formal proposals with pricing for Court's review and approval.
Result: If approved, the contractor will receive a formal notice of termination.
Vote: 4 - 0 Motion Carried - Unanimously
Other:Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Issue: Webb County approved a developer participation agreement with AFW/East Laredo in order to authorize the purchase of construction material to expedite the construction of a section of Estrella County road which provides access to the Phoenix Village Subdivision being developed by AFW/East Laredo.
Solution: Webb County will provide the road construction material requested and developer of subdivision will make the improvements agreed to on County road known as Estrella road. In order to meet construction deadlines, the public advertisement for bids was initiated to start the process of securing formal bids for the Court's consideration.
Result: If approved, the Commissioners Court will authorize the ratification of public advertisement for bids for this approved project.
Motion by Commissioner, Pct. 2 Rosaura “Wawi” Tijerina, seconded by County Judge Tano E. Tijerina to approve
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Issue: Webb County approved a developer participation agreement with AFW/East Laredo in order to authorize the purchase of construction road material for the construction of a section of Estrella County road which provides access to the Phoenix Village Subdivision being developed by AFW/East Laredo.
Solution: Consideration to authorize the award to the lowest responsible bidder as presented by the Webb County Purchasing Agent. Webb County will provide the road construction material requested and developer of subdivision will make the improvements agreed to on County road known as Estrella road.
Result: If approved, the purchase of construction material required for the construction of Estrella Road will be initiated by the Purchasing Agent contingent upon funding allocation for the awarded sum.
Motion by Commissioner, Pct. 3 John C. Galo, seconded by County Judge Tano E. Tijerina to approve
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Issue: Elk Creek is requesting an increase of $5,000.00 per trailer pending production (3 out of the 4) due to significant increases in cost to steel, AC units, and other key components. As per vendor, some of the material has been ordered but the key components to build the units are pending due to recent spikes in material.
Solution: Consideration to authorize the change order as requested by the vendor.
Result: If approved, the Purchasing Agent will initiate the change order to the Purchase Order, so the vendor can complete the remaining units pending production.
Motion by Commissioner, Pct. 3 John C. Galo, seconded by County Judge Tano E. Tijerina to reject item in order to proceed discussing with legal
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Issue: The County Employees Benefit Fund is expected to incur related health cost for FY 2025 fiscal year for third party administration, medical claims, prescriptions and dental.
Solution: Additional funding will be from capital projects being postponed to next year budget cycle, operational reserve and payroll savings being utilized to cover the County employee's health benefits projected year end cost.
Result: The additional funding sources will ensure all the health benefits for employees are addressed timely within the fiscal year.
Issue: On January 13, 2025, the Commissioners Court approved a Contract with Stoddard Enterprise, LLC (“CMAR”) to undertake the rehabilitation and preservation of the Veterans Building (“Project”) contingent on approval of a Guaranteed Maximum Price (“GMP”) for the project.
Solution: At the May 27, 2025, the Court accepted the Guaranteed Maximum Price on the Project, but there was no timeline to complete the Project. If the Court accepts the Guaranteed Maximum Price, Stoddard Enterprise, LLC will be contractually bound to undertake the Project and substantially complete the Project within Three Hundred Sixty-Five Days (365) calendar days after the issuance of the “Notice to Proceed.”
Result: Acceptance of the GMP and substantial completion timeline will allow the CMAR to do the rehabilitation and preservation work of the Veterans Building within one calendar year.
Motion by County Judge Tano E. Tijerina, seconded by Commissioner, Pct. 3 John C. Galo to bring up Item #42
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Issue: The County Employees Benefit Fund is expected to incur related health cost for FY 2025 fiscal year for third party administration, medical claims, prescriptions and dental.
Solution: Additional funding will be from capital projects being postponed to next year budget cycle, operational reserve and payroll savings being utilized to cover the County employee's health benefits projected year end cost.
Result: The additional funding sources will ensure all the health benefits for employees are addressed timely within the fiscal year.
Motion by Commissioner, Pct 4. Ricardo A. Jaime, seconded by Commissioner, Pct. 3 John C. Galo to approve amount of $3.5 million
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Issue: On January 13, 2025, the Commissioners Court approved a Contract with Stoddard Enterprise, LLC (“CMAR”) to undertake the rehabilitation and preservation of the Veterans Building (“Project”) contingent on approval of a Guaranteed Maximum Price (“GMP”) for the project.
Solution: At the May 27, 2025, the Court accepted the Guaranteed Maximum Price on the Project, but there was no timeline to complete the Project. If the Court accepts the Guaranteed Maximum Price, Stoddard Enterprise, LLC will be contractually bound to undertake the Project and substantially complete the Project within Three Hundred Sixty-Five Days (365) calendar days after the issuance of the “Notice to Proceed.”
Result: Acceptance of the GMP and substantial completion timeline will allow the CMAR to do the rehabilitation and preservation work of the Veterans Building within one calendar year.
Motion by Commissioner, Pct 4. Ricardo A. Jaime, seconded by Commissioner, Pct. 3 John C. Galo to approve
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Motion by Commissioner, Pct. 3 John C. Galo, seconded by County Judge Tano E. Tijerina to approve
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Issue: Commissioners Court approved a Contract with Leyendecker Construction of Texas, Inc. (“CMAR”) to undertake the construction of a rodeo arena and multi-purposae exhibition hall with parking (“Project”) contingent on approval of a Guaranteed Maximum Price (“GMP”) for the project.
Solution: If the Court accepts the Guaranteed Maximum Price, Leyendecker Construction of Texas, Inc.will be contractually bound to undertake the Project and substantially complete the Project.
Result: Acceptance of the GMP will allow for the CMAR to do the work.
Motion by Commissioner, Pct. 3 John C. Galo, seconded by County Judge Tano E. Tijerina to approve
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Motion by County Judge Tano E. Tijerina, seconded by Commissioner, Pct. 3 John C. Galo to approve
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)
Motion by County Judge Tano E. Tijerina, seconded by Commissioner, Pct 4. Ricardo A. Jaime to adjourn
Vote: 4 - 0 Motion Carried - Unanimously
- Other:
-
Commissioner, Pct. 1 Jesse Gonzalez (ABSENT)