YOLO COUNTY
CACHE CREEK TECHNICAL ADVISORY COMMITTEE
AGENDA
SEPTEMBER 5, 2023
2:00 P.M.
CACHE CREEK TECHNICAL ADVISORY COMMITTEE
DR. MARK TOMPKINS, CHAIR, FLUVIAL GEOMORPHOLOGIST
DR. DREW RAYBURN, RIPARIAN BIOLOGIST
PAUL FRANK, HYDRAULIC ENGINEER
THIS MEETING WILL OCCUR BY TELECONFERENCE
TELECONFERENCE OPTIONS TO JOIN ZOOM MEETING:
By Computer: https://yolocounty.zoom.us/j/87664066796
Meeting ID: 876 6406 6796
or
By Phone: (408) 638-0968
Meeting ID: 876 6406 6796
DR. MARK TOMPKINS, CHAIR, FLUVIAL GEOMORPHOLOGIST
DR. DREW RAYBURN, RIPARIAN BIOLOGIST
PAUL FRANK, HYDRAULIC ENGINEER
THIS MEETING WILL OCCUR BY TELECONFERENCE
TELECONFERENCE OPTIONS TO JOIN ZOOM MEETING:
By Computer: https://yolocounty.zoom.us/j/87664066796
Meeting ID: 876 6406 6796
or
By Phone: (408) 638-0968
Meeting ID: 876 6406 6796
| ELISA SABATINI MANAGER OF NATURAL RESOURCES |
CASEY LIEBLER NATURAL RESOURCES PLANNER |
|
CALL TO ORDER - 2:00 PM
|
1.
Introductions.
2.
Consider Approval of Agenda.
3.
Public Comment: Members of the public may address the Technical Advisory Committee on any subject relating to the Technical Advisory Committee, but not relative to items on the present agenda. The Committee reserves the right to impose a reasonable time limit on time afforded to any individual speaker.
|
REGULAR AGENDA
|
4.
Flood Hazard Development Permit Application Review: Teichert Shifler Streambank Stabilization and Habitat Enhancement Project (ZF #2023-0014) (Applicant: Teichert Materials)
The Cache Creek TAC will make a formal recommendation regarding issuance of a Flood Hazard Development Permit for the above referenced project. The proposed project involves bank stabilization and habitat enhancement improvements adjacent to the Teichert Shifler mining operation. The streambank stabilization plan focuses on two components: (1) a soil backfilled and planted rock revetment, and (2) habitat enhancements, including the removal of non-native species and the planting appropriate native woody species. Implementation of the streambank stabilization plan is required before Teichert commences mining and other activities within 700 feet of the top of bank per Teichert Shifler Mining and Reclamation Plan Permit condition of approval numbers 90 and 91.
The Cache Creek TAC will make a formal recommendation regarding issuance of a Flood Hazard Development Permit for the above referenced project. The proposed project involves bank stabilization and habitat enhancement improvements adjacent to the Teichert Shifler mining operation. The streambank stabilization plan focuses on two components: (1) a soil backfilled and planted rock revetment, and (2) habitat enhancements, including the removal of non-native species and the planting appropriate native woody species. Implementation of the streambank stabilization plan is required before Teichert commences mining and other activities within 700 feet of the top of bank per Teichert Shifler Mining and Reclamation Plan Permit condition of approval numbers 90 and 91.
5.
Conceptual Project Presentation: Bullfrog and Slider Mitigation at the Cache Creek Nature Preserve (Cache Creek Conservancy - Operations/Restoration Committee)
The Cache Creek Conservancy's Operations/Restoration Committee will provide a short informational presentation about a conceptual project focused on the eradication of the American Bullfrog (Lithobates catesbeianus) and Red-Eared Slider (Trachemys scipta elegans) from the County-owned Cache Creek Nature Preserve. Both species are invasive to the Cache Creek watershed and compete with native species for food and habitat. The Cache Creek TAC will offer comments on the project as it continues to be developed.
The Cache Creek Conservancy's Operations/Restoration Committee will provide a short informational presentation about a conceptual project focused on the eradication of the American Bullfrog (Lithobates catesbeianus) and Red-Eared Slider (Trachemys scipta elegans) from the County-owned Cache Creek Nature Preserve. Both species are invasive to the Cache Creek watershed and compete with native species for food and habitat. The Cache Creek TAC will offer comments on the project as it continues to be developed.
|
ADJOURNMENT
|
Next meeting scheduled for: TBD.
I declare under penalty of perjury that the foregoing agenda was posted by 5:00 p.m. on Friday, September 1, 2023, at the following places:
- On the bulletin board at the entrance of the Department of Community Services at 292 W. Beamer Street, Woodland, California; and
- On the Yolo County Natural Resources Division website: www.yolonaturalresources.org.
Casey Liebler, Clerk
Cache Creek Technical Advisory Committee
|
NOTICE
If requested, this agenda can be made available in appropriate alternative formats to persons with a disability, as required by Section 202 of the Americans with Disabilities Act of 1990 and the Federal Rules and Regulations adopted in implementation thereof. Persons seeking an alternative format should contact the Clerk of the Board for further information. In addition, a person with a disability who requires a modification or accommodation, including auxiliary aids or services, in order to participate in a public meeting should telephone or otherwise contact the Natural Resources Division as soon as possible and at least 24 hours prior to the meeting. The Division may be reached at (530) 666-8775 or
NaturalResources@yolocounty.org.
|