TO:
Honorable Mayor and Members of the Common Council
FROM:
James Rabe, Director of Public Works
DATE:
September 23, 2025
SUBJECT:
Res 25-513 Approve Utility Undergrounding Policy
BACKGROUND
The City of Oshkosh (City) requires all new subdivision developments to have utilities, such as electric and communication, installed underground (currently located in
Section 30-444(F)(1)
of the
Municipal Code of the City of Oshkosh
) in easements outside of the public right-of-way. Electrical distribution lines of twelve thousand (12,000) volts (12kV) or more are exempt from the underground installation requirement. There are no requirements for the redeveloping areas of the City, nor for street reconstruction projects that are being managed by the City.
ANALYSIS
Moving utilities from aerial to underground has many benefits including: improving safety, improving climate change resiliency, improving aesthetics, and reducing overall cost of operation and maintenance.
There are also challenges associated with moving these utilities underground including: congested right-of-way, insufficient terrace widths, a lack of utility easements outside of the right-of-way, and structures built close to the right-of-way. There is an impact to private property owners as well, as they have to pay several thousand dollars to convert their overhead services to underground. If services are not converted, the utilities may end up placing poles at each house that does not convert, and bring the underground utilities overhead to the house.
Utility companies require twelve foot (12’) wide easements outside of the public right-of-way (on both sides of the right-of-way) to install utilities underground. If there are structures (buildings) located within fifteen feet (15’) of the right-of-way, it will be infeasible to obtain the required twelve foot (12’) wide easement.
Arterial streets carry the highest volume of traffic, which provides more chances for accidents to damage aerial utilities. The higher traffic on arterial streets also creates a greater aesthetics impact with aerial utilities. Collector streets carry the next highest volume of traffic, while local streets carry the lowest volume of traffic. Street classification is an important factor for the Common Council to consider when allocating available funding and determining which streets to move forward on utility undergrounding.
FISCAL IMPACT
There is no immediate fiscal impact to approving this policy; however, future Common Council’s will need to evaluate the fiscal impact of projects that contemplate undergrounding aerial utilities.
RECOMMENDATION
Staff recommends approval of the policy.
Attachments
Res 25-513
Utility undergrounding policy