Approval of final payment to Mason Enterprise Group, in the amount of $3,519.00, for Sewer Plant Chiller, Project No. 2022038, or take other necessary action. (Mike Stewart)
BACKGROUND:
The Sewer Plant Chiller is complete and ready for final payment.
The project consisted of:
Supply and Install three (3) Trane fan motors for space heaters
Remove existing piping and re-pipe the supply to the water softener and back flow preventer
Supply and Install new piping to the boiler loop
Pressurize new piping, leak check and set pressure regulator
Supply and Install six (6) actuator motors for the AHU
Supply and Install six (6) thermostats and wiring for the thermostats to the actuators
Wire thermostats and actuators, reconnect power to existing circuits and check operation
Remove the damaged coils from AHU 1
Supply and install new Trane coil(s) for AHU 1
Connect new coil(s) to the existing piping system and restore water supply
RECOMMENDED ACTION:
Approve Final Payment to Mason Enterprise Group in the amount of $3,519.00.