Approval to authorize the City Manager to amend the Muskogee Water System Maintenance Contract and Street Repair Contract between the City of Muskogee and Cook Consulting, LLC, by increasing the not-to-exceed limit to $675,000.00, for the remaining fiscal year, from the original amount of $575,000, or take other necessary action. (Mike Stewart)
BACKGROUND:
The City is currently engaged in a contract with Cook Consulting to do emergency water line repairs and fire hydrant replacements. Needs for these services suggests this contract limit be raised to $600,000, using existing water infrastructure funding. The Street Repair Contract for water repair cuts is also included, in the amount of $75,000, to increase the total not-to-exceed amount in the contract to $675,000. The total amount of requested increase to the contract is $100,000.
RECOMMENDED ACTION:
Approve the increase in Muskogee Water System Maintenance Contract.