| TITLE: | |||||
| Consideration and Approval of Contract: Approve the First Amendments to 21 Job Order Professional Contracting Services Contracts to increase project limits and annual contractor caps for the Job-Order-Contracting Program. |
|||||
| STAFF RECOMMENDED ACTION: | |||||
|
|||||
| Executive Summary: | |||||
| City staff administer a significant number of projects spanning a wide range in size and complexity. The City utilizes a Job-Order-Contracting Program (JOC Program) to conduct numerous, commonly encountered construction projects done quickly and easily during the short construction season. The JOC Program reduces burdensome levels of contract procurement time along with construction project procurement costs by awarding long-term contracts for a wide variety of renovation, repair, and construction projects. The Job Order Professional Contracting Services Contracts already in effect follow the Arizona Revised Statutes (A.R.S.) Title 34 expenditure limits for Job-Order-Contracting. The City's current JOC Program has an individual project limit of $1,000,000 and caps the annual amount the City can spend on a specific contractor at $5,000,000. Due to rising construction costs, various City Departments have been unable to utilize the JOC Program as intended. By raising the individual project limit to $2,000,000 and the annual amount the City can spend on a specific contractor to $10,000,000, City staff will have more flexibility to use the JOC Program as authorized within Arizona State statute. The increased efficiency in project delivery will render project and City staff time savings that will then be utilized on other additional projects. With all non-emergency related projects, City Staff will make its best effort to obtain pricing proposals from all JOC Program contractors in the particular discipline under which the project falls. City staff will then move forward under the overarching JOC Services Contract and require an individual JOC Construction Contract that will include the individual project's name, cost, time to completion and will require the contractors to provide bonds and insurance coverage specific to each individual project initiated under the JOC Program. |
|||||
| Financial Impact: | |||||
| Costs will be expended from budgets already approved and allocated by the City Council. Awarding multiple contracts based on specific areas of qualifications and experience on an as needed basis will result in increased efficiency. | |||||
| Policy Impact: | |||||
| No impact. | |||||
| Previous Council Decision or Community Discussion: | |||||
|
|||||
| Options and Alternatives to Recommended Action: | |||||
|
|||||
| Background and History: | |||||
| Title 34 of Arizona Revised Statute provides government entities the ability to solicit a pool of vendors who are qualified and experienced in specific construction disciplines and utilize those vendors through a JOC Program. By utilizing this solicitation method, the City is able to conduct a general solicitation for each discipline, enter into a service contract with each selected vendor that defines the scope of work for the specific discipline, and as projects arise, request that the vendor submit a "job-order" bid to perform the services and enter into individual JOC construction contracts. In 2021, the Purchasing Section conducted solicitations for individual disciplines within the JOC Program; one for City-wide construction services and one for Flagstaff Pulliam Airport construction services. An evaluation committee for each solicitation, including local registered contractors, evaluated the responses and selected the contractors identified above. The JOC Program has been both vital and successful in completing projects, however, rising construction costs have limited its usefulness over the past few years due to the relatively low project and annual limits. By approving the First Amendments, the increased individual and annual JOC limits will:
|
|||||
| Connection to PBB Priorities and Objectives: | |||||
Safe & Healthy Community:
Inclusive & Engaged Community:
Sustainable, Innovative Infrastructure:
|
|||||
| Connection to Regional Plan: | |||||
|
|||||
| Connection to Carbon Neutrality Plan: | |||||
|
|||||
| Connection to 10-Year Housing Plan: | |||||
| None. | |||||
| Connection to Division Specific Plan: | |||||
| None. | |||||
|
|
|||||
| Attachments: | First Amendment - Airport JOCs - Horizontal | ||
| First Amendment - Airport JOCs - Verticle | |||
| First Amendment - City-wide JOCs - Horizontal | |||
| First Amendment - City-wide JOCs - Landfill Construction | |||
| First Amendment - City-wide JOCs - Vertical Construction | |||
| First Amendment - City-wide JOCs - WW Controls Construction | |||
| First Amendment - City-wide JOCs - WW General Construction | |||