|
If the Planning and Zoning Commission so chooses to follow the recommendation of Staff, a possible motion the Commission could make is as follows:
I make a motion to approve P&Z Resolution No. 1, Series 2025, a resolution approving a special exception and site development plan for four residential units on property located at 422 E 3rd St., Cortez, Colorado, in the NB zone, with the following conditions:
1. All requirements of utility providers, City departments, CDOT and affected districts must be satisfied, as outlined in adopted City Codes and other regulatory documents. Specifically, all public improvements shall comply with the minimum requirements of the 2009 City of Cortez Construction Design Standards and Specifications.
2. The appropriate construction drawings and reports for the project, revised as required by the City Engineer shall be signed and stamped by a Colorado licensed architect or engineer, must be approved by the Building Official and City Engineer, and a building permit obtained prior to any construction on the Property.
3. Prior to issuance of a Certificate of Occupancy the Applicant's engineer shall certify that all improvements were constructed in conformance with the approved plans.
|