AI - 101256
2.G.
DD-CONSENT AGENDA SPECIAL MTG
- Meeting Date:
- 10/28/2025
- Submitted For:
- Esther Mireles
- Submitted By:
- Esther Mireles
- Department:
- DRAINAGE DISTRICT
Information
CAPTION
Utility Permit
Bay Runner Pipeline, LLC and Pumpco, Inc. propose to install one (1) 42-inch gas line, with a maximum pressure of 2,350 PSIG and a minimum pressure of 1,880 PSIG, at WLC-0179.000 (Estate of Terry Harris, Santa Rosa Subdivision, out of Partition Share No. 44) and WLC-0182.000 (MJL Farms, LLC, Jose Narciso Cavazos Survey, A-8), crossing HCDD1’s Main Flood Water Channel.
Bay Runner Pipeline, LLC and Pumpco, Inc. propose to install one (1) 42-inch gas line, with a maximum pressure of 2,350 PSIG and a minimum pressure of 1,880 PSIG, at WLC-0179.000 (Estate of Terry Harris, Santa Rosa Subdivision, out of Partition Share No. 44) and WLC-0182.000 (MJL Farms, LLC, Jose Narciso Cavazos Survey, A-8), crossing HCDD1’s Main Flood Water Channel.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Final Approval | Nora Cavazos | 10/22/2025 04:14 PM |
- Form Started By:
- Esther Mireles
- Started On:
- 10/20/2025 11:00 AM
- Final Approval Date:
- 10/22/2025