Skip to main content

AgendaQuick™

View Agenda Item

5.A.
CC CONSENT
Meeting Date:
11/21/2006
Submitted For:
Joe Pena
Submitted By:
Sandra Garcia, RIGHT OF WAY DEPT.
Department:

Information

CAPTION

1. North Alamo Water Supply:  Approximately 500' going north from Davis Rd. on the east side of Uresti Rd - Bore- Juan C. Gonzalez; 3/4" meter installation.

2. Richard Linn- Central Ready Mix C/O Melden & Hunt,Inc.: Proposed 4" waterline crossing bore and encase with
8" x 3/8" x 60 LF of steel casing (MIN.36" below N.G.)  North Mile 3 Road and Abram Rd.

3. Enterprise Texas Pipeline,L.P.:  Install a 10" diameter steel pipeline to transport natural gas.  The proposed pipeline will be located approximately 8 feet south of the northerly right of way line of 7 mile line road.  The pipeline will begin at our facility located on the east side of Jara Chinas Road..

4. Enterprise Texas Pipeline, L.P.:  Install a 10" diameter steel pipeline to transport natural gas.  The proposed  pipeline will be located approximately 8 feet south of the northerly  right of way line of 7 mile line road.  The pipeline will begin at our facility located approximately 2.5 miles west of Jara Chinas Road and be heading to Jara Chinas Road.

BACKGROUND


Fiscal Impact

Attachments