5.A.
CC CONSENT
- Meeting Date:
- 11/21/2006
- Submitted For:
- Joe Pena
- Submitted By:
- Sandra Garcia, RIGHT OF WAY DEPT.
- Department:
Information
CAPTION
1. North Alamo Water Supply: Approximately 500' going north from Davis Rd. on the east side of Uresti Rd - Bore- Juan C. Gonzalez; 3/4" meter installation.
2. Richard Linn- Central Ready Mix C/O Melden & Hunt,Inc.: Proposed 4" waterline crossing bore and encase with
8" x 3/8" x 60 LF of steel casing (MIN.36" below N.G.) North Mile 3 Road and Abram Rd.
3. Enterprise Texas Pipeline,L.P.: Install a 10" diameter steel pipeline to transport natural gas. The proposed pipeline will be located approximately 8 feet south of the northerly right of way line of 7 mile line road. The pipeline will begin at our facility located on the east side of Jara Chinas Road..
4. Enterprise Texas Pipeline, L.P.: Install a 10" diameter steel pipeline to transport natural gas. The proposed pipeline will be located approximately 8 feet south of the northerly right of way line of 7 mile line road. The pipeline will begin at our facility located approximately 2.5 miles west of Jara Chinas Road and be heading to Jara Chinas Road.
2. Richard Linn- Central Ready Mix C/O Melden & Hunt,Inc.: Proposed 4" waterline crossing bore and encase with
8" x 3/8" x 60 LF of steel casing (MIN.36" below N.G.) North Mile 3 Road and Abram Rd.
3. Enterprise Texas Pipeline,L.P.: Install a 10" diameter steel pipeline to transport natural gas. The proposed pipeline will be located approximately 8 feet south of the northerly right of way line of 7 mile line road. The pipeline will begin at our facility located on the east side of Jara Chinas Road..
4. Enterprise Texas Pipeline, L.P.: Install a 10" diameter steel pipeline to transport natural gas. The proposed pipeline will be located approximately 8 feet south of the northerly right of way line of 7 mile line road. The pipeline will begin at our facility located approximately 2.5 miles west of Jara Chinas Road and be heading to Jara Chinas Road.