Skip to main content

AgendaQuick™

View Agenda Item

AI- 12082
4.A.
CC CONSENT
Meeting Date:
11/12/2008
Submitted For:
Joe Pena
Submitted By:
Sandra Garcia, RIGHT OF WAY DEPT.
Department:

CAPTION

1.  Heraclio Garcia c/o Melden & Hunt, Inc. (Heraclio Garcia Subdivision):
a.  The 3/4 of an inch water service line being proposed will connect to an existing 6-inch line located on the south side of Trenton Road.  The purpose for this service line is to provide with potable water to lot 1 of Heraclio Garcia Subdivision.
b.  The 6-inch water line being proposed will connect to an existing  6-inch line located on the south side of Trenton Road.  The purpose for this line is to feed a proposed fire hydrant, which will be located on the north side of  said Road, approximately 1/4 of a mile east from "I" Road.  The material for this line is PVC C900 Dr-25.
c.  The 8-inch sanitary sewer line being proposed will connect to an existing manhole located approximately 35 feet east of the east line of Heraclio Garcia Subdivision.  The material for this line is PVC SDR-35.

2.  North Alamo Water Supply Corporation:
a.  Approximately 500' east of 1423 on the south side of Roosevelt- Bore- David Campbell- 3/4" service connection.  
b.  Approximately 340' east of Engelman Rd on the south side of Mile 20N- Line Ext- Nathan Carr-3/4" service connection

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Lopez 11/06/2008 07:50 AM
Auditor's Office lfong 11/06/2008 05:20 PM
Form Started By:
Saul Garcia
Started On:
11/03/2008 01:31 PM
Final Approval Date:
11/06/2008