AI- 14199
4.A.
CC CONSENT
- Meeting Date:
- 03/03/2009
- Submitted For:
- Joe Pena
- Submitted By:
- Sandra Garcia, RIGHT OF WAY DEPT.
- Department:
Information
CAPTION
1. L & G Engineering Laboratory, LLC:
a. Geotechnical Drilling- Mile 3 Rd; boring will be approximately 4" in diameter and are to be advanced to maximum depths of 90'.
2. North Alamo Water Supply:
a. Approximately 95' east from Terry Rd on the south side of Ingle Rd- Line Ext- Irasema Perez; 3/4" service connection.
a. Geotechnical Drilling- Mile 3 Rd; boring will be approximately 4" in diameter and are to be advanced to maximum depths of 90'.
2. North Alamo Water Supply:
a. Approximately 95' east from Terry Rd on the south side of Ingle Rd- Line Ext- Irasema Perez; 3/4" service connection.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Veronica Lopez | 02/26/2009 07:37 AM |
| Auditor's Office | 02/27/2009 04:43 PM |
- Form Started By:
- Saul Garcia
- Started On:
- 02/24/2009 08:35 AM
- Final Approval Date:
- 02/27/2009