CAPTION

1. Agua Special Utility District:
a. The contractor proposed to bore & install a 16" P.V.C. casing 40.0' L.F. across El Pinto Road for a proposed 8" P.V.C. waterline.  The bore will be located 600.0' South of El Sendero Road.

2. The North Alamo Water Supply Corporation:
a. Approximately 1460' west of Goolie Rd on the north and south side of Eldora Rd- Bore- Goolie Meadows Phase III- 8" waterline w/ 16" PVC casing.