1. Delta Lake Irrigation District:
a. We will be replacing the 12 inch mortar joint line into Contech Pipe along Jesus Flores Rd (Filegonia).

2. Baldemar Balderas:
a. The contractor shall install an 18" storm drain line approximately 17.00 feet north of the center line of Iowa Road approximately 1621.00 feet West of Tower Road.
b. The contractor shall install a 24" storm drain line approximately 45.00 feet north of the center line of Iowa Road stating approximately 994.00 feet West of Tower Road and extend 610 feet to the west.  Three caliche driveways will be cut and repaired for this construction.
c. The contractor shall install a 24" storm drain line crossing Iowa Road approximately 994.00 feet West of Tower Road.  The 24" storm drain line will be installed by open cut of Iowa Road pavement.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management mmunoz 11/22/2011 12:58 PM
Auditor's Office aduran 11/23/2011 12:23 PM
Form Started By:
Rebecca Gomez
Started On:
11/21/2011 09:20 AM
Final Approval Date:
11/23/2011