AI- 32248
5.A.
CC CONSENT
- Meeting Date:
- 05/22/2012
- Submitted By:
- Rebecca Gomez, RIGHT OF WAY DEPT.
- Department:
Information
CAPTION
Kyndell Bennett of Bennett Investments:
1. Proposed 18" concrete storm sewer pipeline will be located from the south side to the north side of Texas Road at Clinton, then said line will travel west along the north side of Texas Road all within the ROW to Cesar Chavez.
Heberto J. Garza and Fidela Garza Family Limited Partnership:
1. The contractor shall install an 8" PVC water line within a 16" PVC casing crossing the existing right-of-way of Mile 12 1/2 North Road. The water line shall be installed approximately 1242 feet west of North Mile 2 West.
The North Alamo Water Supply Corporation:
1. Approximately 515' north of mile 17.5N on the east and west side of 83rd St- Bore- San ClementeSub; 8" PVC water line
2. Approximately 715' going east from 83rd on the north side of mile 17.5N- Line Ext. San Clemente Sub
3. Approximately 475' north of mile 17.5N on the east and west side of 83rd- Bore- San Clemente Sub; 8" PVC sewer line
1. Proposed 18" concrete storm sewer pipeline will be located from the south side to the north side of Texas Road at Clinton, then said line will travel west along the north side of Texas Road all within the ROW to Cesar Chavez.
Heberto J. Garza and Fidela Garza Family Limited Partnership:
1. The contractor shall install an 8" PVC water line within a 16" PVC casing crossing the existing right-of-way of Mile 12 1/2 North Road. The water line shall be installed approximately 1242 feet west of North Mile 2 West.
The North Alamo Water Supply Corporation:
1. Approximately 515' north of mile 17.5N on the east and west side of 83rd St- Bore- San ClementeSub; 8" PVC water line
2. Approximately 715' going east from 83rd on the north side of mile 17.5N- Line Ext. San Clemente Sub
3. Approximately 475' north of mile 17.5N on the east and west side of 83rd- Bore- San Clemente Sub; 8" PVC sewer line
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | mmunoz | 05/09/2012 02:32 PM |
| Auditor's Office | aduran | 05/17/2012 02:59 PM |
- Form Started By:
- Rebecca Gomez
- Started On:
- 05/07/2012 11:20 AM
- Final Approval Date:
- 05/17/2012