Skip to main content

AgendaQuick™

View Agenda Item

4.A.
CC CONSENT
Meeting Date:
05/08/2007
Submitted For:
Joe Pena
Submitted By:
Sandra Garcia, RIGHT OF WAY DEPT.
Department:

Information

CAPTION

1. North Alamo Water Supply:  
*  Alberta Subd  L22 (Alberta SS/W Tower) - BORE- Santhosh Skariah (3/4" meter installation)
*  Thelma St SS/E 1426 - BORE - Santana Torres (3/4" meter installation)

2. Cobos Construction:
*   Open cut Owassa Road and install a 6” PVC Water line to connect an existing 6” NAWSC water line.  Contractor will saw cut a 3 foot wide trench.  The trench will be backfilled, compacted to 98% standard density and overlaid with 2 inches of Type D, Hot Mix Asphaltic Concrete, see attached sketch.

3. Crystal Gas Storage:
*  Proposes to perform groundwater sampling of monitor wells to the west and southeast corner of FM 493 & a county road bordering the northern Former Adobe Refinery.  Upon completion the wells will be plugged and abandoned in accordance with State regulations.

BACKGROUND


Fiscal Impact

Attachments