AI- 49420
Executive Office 4.A.
CC CONSENT
- Meeting Date:
- 05/05/2015
- Submitted By:
- Rebecca Gomez, EXECUTIVE OFFICE
- Department:
- EXECUTIVE OFFICE
Information
CAPTION
Right of Way:
Sharyland Water Supply Corp.:
Road Crossing (BORE): A 4" PVC waterline to be encased within a 6" PVC casing to be located approximately 1528 ft. north of the intersection of Stewart Rd. and Mile 4 Rd.
Pedro Torres:
A new proposed 4-inch residential sewer connection crossing Jack's Rd. will be connected to an existing 8-inch sewer man line extending along the south side of Jack's Rd. The line will be installed through a 25-foot bore under the road. The installation location is approximately 380 feet west of Terry Rd.
Sharyland Water Supply Corp.:
Road Crossing (BORE): A 4" PVC waterline to be encased within a 6" PVC casing to be located approximately 1528 ft. north of the intersection of Stewart Rd. and Mile 4 Rd.
Pedro Torres:
A new proposed 4-inch residential sewer connection crossing Jack's Rd. will be connected to an existing 8-inch sewer man line extending along the south side of Jack's Rd. The line will be installed through a 25-foot bore under the road. The installation location is approximately 380 feet west of Terry Rd.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Veronica Ortiz | 04/29/2015 02:47 PM |
| Auditor's Office | Monica Salinas | 05/01/2015 03:25 PM |
- Form Started By:
- Rebecca Gomez
- Started On:
- 04/22/2015 01:48 PM
- Final Approval Date:
- 05/01/2015