Approval of Right of Way Permits:

H2O Construction Services- Installation only of 60" pipe crossing Dicker Rd. Project for City of Hidalgo (Northwest Drain)

North Alamo Water Supply Corporation: 
a).  North Alamo Water Supply Corporation is proposing to install 2,664.0 lineal feet of 12-inch waterline along Sioux Road beginning at Station 114+00 and also being 1,200.0 feet east from the centerline of the Donna Irrigation Main Canal.  The proposed waterline will be installed 5.0 feet north from the south right-of-way line and will be installed 40-inches below natural ground.  The said line will traverse towards the east where at Station 127+15 the waterline will cross North to a 90 degree elbow installed 5.00 feet south of the north right-of-way line of said Sioux Road.  The waterline crossing will be bored and encased with 25.0 feet of SDR26 PVC Casing.  The waterline will then traverse to the east to a 12 x 12 inch cross to be installed at Station 139+75 where the said line will cross Sioux Road to the South and be 5.0 east of the west right-of-way line of Old La Blanca Road.  The waterline crossing south will be bored and encased with 20.0 feet of SDR26 PVC Casing.  The proposed waterline and bores will be installed 40-inches below lowest point of natural ground. 

b).  North Alamo Water Supply Corporation is proposing to install 375.0 lineal feet of 12-inch waterline along La Blanca Road.  The proposed waterline will begin at Station 140+50 and be 5.0 feet east of the west right-of-way of line of Old La Blanca Road also being located at the southwest corner of the intersection of Old La Blanca Road and Sioux Road.al.  The proposed waterline will traverse 375.0 feet to the south and connect to an existing waterline.  The proposed waterline will be installed 40-inches below natural ground. 

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 05/20/2016 10:54 AM
Final Approval Monica Salinas 05/20/2016 05:11 PM
Form Started By:
Rebecca Gomez
Started On:
05/20/2016 08:33 AM
Final Approval Date:
05/20/2016