5.A.
CC CONSENT
- Meeting Date:
- 10/17/2006
- Submitted For:
- Joe Pena
- Submitted By:
- Sandra Garcia, RIGHT OF WAY DEPT.
- Department:
Information
CAPTION
Permits:
1. North Alamo Water Supply: Approximately 500’ going east from the centerline of mile 6W and Mile 17 1/2N on the north side boring from south to north – BORE- Amy L. Rios- ¾” meter installation.
2. Sharyland Water Supply: Road Crossing (BORE)- A 1” waterline to be encased within a 2” PVC casing crossing to be located approximately 631 ft. East of the intersection of McColl Rd. and Schunior Rd.
3. Salinas Associates: Doolittle Road & S.H. 107 (see attached drawing- sheet 1 of 1) by Salinas Engineering & Assoc. dated 2/08/06.
1. North Alamo Water Supply: Approximately 500’ going east from the centerline of mile 6W and Mile 17 1/2N on the north side boring from south to north – BORE- Amy L. Rios- ¾” meter installation.
2. Sharyland Water Supply: Road Crossing (BORE)- A 1” waterline to be encased within a 2” PVC casing crossing to be located approximately 631 ft. East of the intersection of McColl Rd. and Schunior Rd.
3. Salinas Associates: Doolittle Road & S.H. 107 (see attached drawing- sheet 1 of 1) by Salinas Engineering & Assoc. dated 2/08/06.