Skip to main content

AgendaQuick™

View Agenda Item

AI- 90853
Planning Department   4.D.
CC CONSENT AGENDA SPECIAL MTG
Meeting Date:
05/16/2023
Submitted For:
Flor Castillo
Submitted By:
Flor Castillo
Department:
PLANNING DEPT.

Information

CAPTION

1. PIPELINE PERMITS
a.  Applicant: Agua SUD
Legal Description: 17.62 acres being the south 7.62 acres of lot 92 and all of lot 91 Nick Doffing Subdivision No. 1; Proposed: Brushline Meadows Subdivision (Brushline Road & Mile 7 North Road) (Pct. 3)
Location of Pipeline or Utilities: Existing 8” waterline west of Brushline Road.
Proposed improvement within Right-of-Way: Eleven 1” water service lines with a 2” PVC casing boring Brushline Road.

b. Applicant: Agua SUD
Legal Description: 16.00 acres all of lot 18 Blk. 7 Texan Gardens Subdivision; Proposed Western Meadows Subdivision (Mile 5 Road & Western Road) (Pct. 3)
Location of Pipeline or Utilities: Existing 12” waterline north of Mile 5 Road.
Proposed improvement within Right-of-Way: Twenty One 1” water service lines with a 2” PVC casing boring Mile 5 Road and Western Road.

c. Applicant: Sharyland Water Supply Corporation
Legal Description: 1.2 acres out of Lot 45 Blk. 4 La Homa Ranch Citrus Groves Unit 1 (Moorefield Road & Mile 5 Road) (Pct. 3)
Location of Pipeline or Utilities: Existing 6” waterline west of Moorefield Road.
Proposed improvement within Right-of-Way: One 1” water service line with a 2” PVC casing boring Moorefield Road.

d. Applicant: Sharyland Water Supply Corporation
Legal Description: 4.90 acres out of Lot 325 Bentsen Grove Addition “C” (Mile 7 Road & Bentsen Palm Drive) (Pct. 3)
Location of Pipeline or Utilities: Existing 4” waterline west of Bentsen Palm Drive.
Proposed improvement within Right-of-Way: One 1” water service line with a 2” PVC casing boring Bentsen Palm Drive.
 
e. Applicant: North Alamo Water Supply Corporation
Legal Description: All of Farm Tract 171 Blk. 160 West Tract Subdivision Proposed; The District North Weslaco Phase 2 Subdivision (Mile 11 North Road & Mile 5 ½ West Road) (Pct. 1)
Location of Pipeline or Utilities: Existing 8” waterline west of Mile 5 ½ West Road.
Proposed improvement within Right-of-Way: Two 8” water line with a 16” PVC casing boring Mile 5 ½ West Road.

f. Applicant: Nordhausen Utility Construction LLC.
Legal Description: 16.00 acres being all of lot 18 blk. 7 Texan Gardens Subdivision; Proposed; Western Meadows Subdivision (Western Road & Mile 5 Road) (Pct. 3)
Proposed improvement within Right-of-Way: One 12” PVC Irrigation line with a 20” steel casing boring Mile 5 Road.

g. Applicant: DBA Trevino & Sons Septic Tanks
Legal Description: 13.488 acres out of the north 18.12 acres out of lot 133 Hall Fifield Subdivision; Proposed; Villas Paraiso Subdivision (Valverde Road & Minnesota Road) (Pct. 1)
Proposed improvement within Right-of-Way: One 24” RCP Storm Sewer Line extension running east approximately 1320.00 feet along the south side of Minnesota Road.

h. Applicant: ABIMAEL Sanchez Gutierrez dba ASG Construction  
Legal Description: 10.00 acres out of Lot 452 John H. Shary Subdivision; Proposed; Nemont Estates Phase II Subdivision (Glasscock Road & Mile 6 Road) (Pct. 4)
Proposed improvement within Right-of-Way: One 6” Sanitary Sewer Line with a 12” PVC casing boring Mile 6 Road, Glasscock Road and Taylor Road.  One Line extension running east approximately 1/2 mile east along the south side of Mile 6 Road.

i. Applicant: North Alamo Water Supply Corporation (Pct. 4)
Proposed improvement within Right-of-Way: One 8” Sanitary Sewer force main line extension and borings with a 15” steel casing along the following road right of ways: South 83rd Street, Tex-Mex Road, South 83rd Street, Curve Road, Tower Road and Canton Road.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 05/11/2023 10:16 AM
Final Approval Monica Salinas 05/12/2023 05:12 PM
Form Started By:
Flor Castillo
Started On:
05/11/2023 10:01 AM
Final Approval Date:
05/12/2023