1. James R. Douglas c/o Tennessee Gas Pipeline:
Open cut Ingle Road between Alamo Road and Muse Road to replace and upgrade old pipeline due to population growth in this area.
2. North Alamo Water Supply:
Sandy Ridge Subdivision L48 (Pinkston NS/W Doolittle)- Bore- Manuel Aguilar- 3/4" service connection.
3. City of Donna c/o Halff Associates:
A. Sewer line will be constructed on Val Verde Grove S/D in the following streets: North Blvd., Main St. & South Blvd. The line will be laid as shown on preliminary plans. The 8 inch line will be centered on the north lane for Main St. & South Blvd., and on the south lane for North Blvd. The 15 inch will be constructed on Main St. generally on the center of the street adjacent to the 8 inch line.
B. Sewer line will be constructed on Village Grove S/D in the following streets: Kennard St. & Clark St. The line will be laid as shown on attached preliminary plans. Generally, the 8 inch line will be centered on the north land of the streets.
C. Sewer line will be constructed on Valley View Estates Cabana Street. The line will be laid as shown on attached preliminary plans. Generally, the 8 inch line will be centered on the west lane of the street.
D. Sewer line will be constructed on Sun Grove S/D in the following streets: Audubon St. & Colorado St. The line will be laid as shown on attached preliminary plans. Generally, the 8 inch line will be centered on the west lane of the streets.
E. Sewer line will be constructed on Clark S/D in the following streets: Lee St.,Larry St. & Angie St. The line will be laid as shown on attached preliminary plans. Generally, the 8 inch line will be centered on the south lane of the street.
F. Sewer line will be constructed on Benita Addition S/D in the following streets: Janneth St. & Olivarez St. The line will be laid as shown on attached preliminary plans. Generally, the 8 inch line will be centered on the south or west lane of the streets.
G. Sewer line will be constructed on South Point S/D in the following streets: Pine St., Oak St., Fir St., Mesquite St., Birch St., Dogwood St., Redwood St. & Boxwood St. The line will be laid as shown on attached preliminary plans. Generally, the 8 inch line will be centered on the south or west lane of the streets.
H. Sewer line will be constructed on Val Verde Rd. The line will be laid as shown on attached preliminary plans. Generally, the 8 inch line will be centered on the west lane of the street.
4. Franz Reinhold Schamberger c/o Quintanilla, Headley & Associates:
The contractor proposed to open cut and repair the existing asphalt road for a 30" RCP storm sewer line across Benito Ramirez Road. The bore will be located 25.0' west of Cesar Chavez Rd. The 30" line will then run East 652.0' being 5.0' south of the north ROW line of Benito Ramirez to the proposed subdivision.
Open cut Ingle Road between Alamo Road and Muse Road to replace and upgrade old pipeline due to population growth in this area.
2. North Alamo Water Supply:
Sandy Ridge Subdivision L48 (Pinkston NS/W Doolittle)- Bore- Manuel Aguilar- 3/4" service connection.
3. City of Donna c/o Halff Associates:
A. Sewer line will be constructed on Val Verde Grove S/D in the following streets: North Blvd., Main St. & South Blvd. The line will be laid as shown on preliminary plans. The 8 inch line will be centered on the north lane for Main St. & South Blvd., and on the south lane for North Blvd. The 15 inch will be constructed on Main St. generally on the center of the street adjacent to the 8 inch line.
B. Sewer line will be constructed on Village Grove S/D in the following streets: Kennard St. & Clark St. The line will be laid as shown on attached preliminary plans. Generally, the 8 inch line will be centered on the north land of the streets.
C. Sewer line will be constructed on Valley View Estates Cabana Street. The line will be laid as shown on attached preliminary plans. Generally, the 8 inch line will be centered on the west lane of the street.
D. Sewer line will be constructed on Sun Grove S/D in the following streets: Audubon St. & Colorado St. The line will be laid as shown on attached preliminary plans. Generally, the 8 inch line will be centered on the west lane of the streets.
E. Sewer line will be constructed on Clark S/D in the following streets: Lee St.,Larry St. & Angie St. The line will be laid as shown on attached preliminary plans. Generally, the 8 inch line will be centered on the south lane of the street.
F. Sewer line will be constructed on Benita Addition S/D in the following streets: Janneth St. & Olivarez St. The line will be laid as shown on attached preliminary plans. Generally, the 8 inch line will be centered on the south or west lane of the streets.
G. Sewer line will be constructed on South Point S/D in the following streets: Pine St., Oak St., Fir St., Mesquite St., Birch St., Dogwood St., Redwood St. & Boxwood St. The line will be laid as shown on attached preliminary plans. Generally, the 8 inch line will be centered on the south or west lane of the streets.
H. Sewer line will be constructed on Val Verde Rd. The line will be laid as shown on attached preliminary plans. Generally, the 8 inch line will be centered on the west lane of the street.
4. Franz Reinhold Schamberger c/o Quintanilla, Headley & Associates:
The contractor proposed to open cut and repair the existing asphalt road for a 30" RCP storm sewer line across Benito Ramirez Road. The bore will be located 25.0' west of Cesar Chavez Rd. The 30" line will then run East 652.0' being 5.0' south of the north ROW line of Benito Ramirez to the proposed subdivision.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Dina Trevino | 06/19/2008 08:57 AM |
| Auditor's Office | lfong | 06/25/2008 03:42 PM |
| Court Administrator | Alejandro Garcia | 06/25/2008 03:53 PM |
- Form Started By:
- Saul Garcia
- Started On:
- 06/17/2008 11:28 AM
- Final Approval Date:
- 06/25/2008