CAPTION

North Alamo Water Supply
  1. Approximately 500’ going west of Doolittle on the north side of Ramseyer – Bore- Marilu Gomez; ¾” service connection;
  2. Approximately 500’ going west of Alamo Rd on the north side of Curry Rd- Bore- Adolfo Valadez; ¾” service connection.
  3. Approximately 1120'  east of FM 907 on the NS of Alberta Rd –Bore- 12” casing – Solano Subdivision
  4. Approximately 1240’ east of FM 907 on the NS of Alberta Rd – Bore- 1” waterline w/2” casing- Solano S/D
 Capital Star Oil and Gas, Inc.
  1. We will trench the pipeline ditch and weld pipe.  The pipeline will then be X-rayed and shrink sleeved.  All pipe will be joeped.  The pipeline that will be tested to twice the operating pressure of the pipe.  The pipeline ditch will be at least 45” deep.
 Rio Delta Engineering
  1. Road crossing bore:  an 8” PVC water line to be encased with 15” PVC casing.  Crossing to be located approximately 796 ft. east of the intersection of Rio Grande Floral and FM 3250.
  2. A 21” PVC line incased in a 30” steel pipe across 13th Street approximately 1 ½ miles west of FM 491.
 Pizza Properties (Melden & Hunt)
  1. Install a 10” sewer line on Mile 2 Road and N Conway Road
  2. Install an 8” waterline on Mile 2 Rd and Conway Avenue
El Paso E & P Company
  1. Six inch poly pipeline parallel to the southern ROW boundary of Mile 14 Road along the route shown on the attached Exhibit A reference to which is made for more specific route and type materials information.  This distance includes two (2) “T’s” in the proposed line located at a point 598 feet and 609 feet easterly of the northwest corner of the F.H. Kirkbride Survey, A-658, where existing  pipelines will tie-in to this pipeline.  Approximately 21,493 feet or 1,302.61 RODS.