1. Preliminary Approval with Variance
a. Quinta Los Laureles Subdivision - Pct. 1 (Juan Saenz) (Mile 17 ½ North Road & Mile 6 West Road)
No. of Lots: 4 Single-Family
Flood Zone: X
Estimated Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Mile 17 ½ North Road.
ETJ: Yes, City of Elsa.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’S.
Paved: Yes, Mile 17 ½ North Road is paved.

b. Owassa Spring Townhomes Subdivision - Pct. 4 (Abesam Rentals, LLC.) (Owassa Road & Veterans Blvd.)
No. of Lots: 20 Single-Family
Flood Zone: B
Estimated Number of Streetlights:3
Filling Stations:1
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, City of Pharr.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, provided by City of Pharr.
Paved: Yes, Owassa Road is paved and 1 internal street to be paved.

c. Los Naranjos Estates Subdivision - Pct. 3 (Evert Enterprises, Inc.) (Texan Road & Mile 5 North Road)
No. of Lots: 21 Single-Family
Flood Zone: X
Estimated Number of Streetlights:N/A
Filling Stations:4
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Mile 5 North Road and Texan Road side ditch.  
 ETJ: Yes, City of Mission.
Water: Yes, provided by Agua SUD.
Sewer: Yes, OSSF’S.
Paved: Yes, Mile 5 North Road and Texan Road are paved.

d. Hibiscus Heights Subdivision - Pct. 3 (Fortis Land Co., LLC.) (Trosper Road & Mile 5 North Road)
No. of Lots: 48 Single-Family
Flood Zone: C
Estimated Number of Streetlights:6
Filling Stations:3
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.   
ETJ: Yes, City of Mission.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, provided by City of Mission.
Paved: Yes, Trosper Road is paved and 1 internal street to be paved.

 
2. Final Approval With Financial Guarantee
a. Carolina Cavazos Subdivision- Pct. 3 (Jose Cavazos Jr.) (Bentsen Palm Drive & Mile 3 Road)
No. of Lots: 2 Single-Family
Flood Zone: C
Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation, and surface runoff will drain into Bentsen Palm Drive roadside ditch.
ETJ: Yes, City of Mission.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, (1) OSSF has been escrowed.
Paved: Yes, Bentsen Palm Drive is paved. 
* Final Approval with a cash deposit in the amount of $1,500.00 for (1 OSSF)

b. Acres of Santa Cruz Ph. 3 Subdivision- Pct. 3 (Tierra Vacante, LLC.) (Cantu Road & Monte Cristo Road)
No. of Lots: 115 Single-Family
Flood Zone: X
Number of Streetlights:21
Filling Stations:8
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.  
ETJ: Yes, City of McAllen.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, OSSF’S has been escrowed.
Paved: Yes, 4 internal streets have been paved.Cantu Road to be paved.
* Final Approval with Letter of Credit No. 86999 in the amount of $87,500.00 for (25 OSSF’S)
* Final Approval with a cash deposit in the amount of $28,000.00 for (8 Fire Hydrants)

3. Final Approval
a. Replat of Lots 1 and 2 of Morales Land Subdivision- Pct. 3 (Luis M. Morales) (Los Ebanos Road & Mile 4 North Road)
No. of Lots: 3 Single Family
Flood Zone: C
Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Los Ebanos Road side ditch.  
ETJ: Yes, City of Mission.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, OSSF’S have been installed.
Paved: Yes, Los Ebanos Road is paved.

b. Progreso Spring Phase I Subdivision- Pct. 1 (HI Starr Investments) (Gonzalez Road & Baker Road)
No. of Lots: 40 Single Family
Flood Zone: B
Number of Streetlights:6
Filling Stations:3
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.  
ETJ: Yes, City of Progreso.
Water: Yes, provided by Military Highway Water Supply Corporation.
Sewer: Yes, provided by Military Highway Water Supply Corporation.
Paved: Yes, Gonzalez Road and 3 internal streets have been paved.
 

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 05/22/2025 11:03 AM
Final Approval Monica Salinas 05/26/2025 09:34 AM
Form Started By:
Flor Castillo
Started On:
05/21/2025 04:48 PM
Final Approval Date:
05/26/2025