Agua Special Utility District:
1. Agua SUD proposes to bore 40 ft across North El Pinto Road in Sullivan City, Texas and install a 12" waterline with 20" steel casing. Agua SUD also proposes to relocate 40 ft of the existing 8" waterline on the east side of El Pinto Road in Sullivan City, Texas. The waterline will be moved 6 ft. east of the current location, which will be a total distance of 8 ft. from the pavement.
2. Agua SUD proposes to make 5, 8 ft (L) X 3 ft. (W); partial pavement cuts on the east side of Minnesota Road in Mission, Texas, as shown on the site map. The purpose is to complete previously approved bores and connect to an existing 8 inch waterline that is underneath the pavement.
1. Agua SUD proposes to bore 40 ft across North El Pinto Road in Sullivan City, Texas and install a 12" waterline with 20" steel casing. Agua SUD also proposes to relocate 40 ft of the existing 8" waterline on the east side of El Pinto Road in Sullivan City, Texas. The waterline will be moved 6 ft. east of the current location, which will be a total distance of 8 ft. from the pavement.
2. Agua SUD proposes to make 5, 8 ft (L) X 3 ft. (W); partial pavement cuts on the east side of Minnesota Road in Mission, Texas, as shown on the site map. The purpose is to complete previously approved bores and connect to an existing 8 inch waterline that is underneath the pavement.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Debbie Tamez | 12/04/2013 04:32 PM |
| Auditor's Office | Monica Salinas | 12/06/2013 05:03 PM |
- Form Started By:
- Rebecca Gomez
- Started On:
- 12/04/2013 03:54 PM
- Final Approval Date:
- 12/06/2013