CAPTION

Approval of Right of Way Permits -
1.  Sharyland Water Supply Corp.:  Road Crossing (Bore): A 12" PVC waterline to be encased within a 20" STEEL casing to be located approximately 70 ft. north of the intersection of 10th ST. and Chapin Rd.

2. North Alamo Water Supply: (Huisache  Acres #13)
a).  A proposed 8" PVC waterline within Dillon Road right-of-way approximately 730.62 feet South & 27.0 feet East  of the centerline and intersection of Trenton Road and Dillon Road.  Said waterline will be 589.38 feet in length and the contractor shall install a 16" PVC casing said 8" waterline. 
b).  A proposed 8" PVC water line crossing Trenton Road approximately 57.5 feet East of Dillon Road.  The contractor shall open cut Trenton Road and install a 16" PVC casing for the 8" water line. 
c).  A proposed 8" PVC water line crossing Wisconsin  Road approximately 57.5 feet East of Dillon Road.  The contractor shall bore Wisconsin Road and install a 16" PVC casing for the 8" water line. 

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 08/25/2016 03:46 PM
Final Approval Monica Salinas 08/26/2016 05:46 PM
Form Started By:
Rebecca Gomez
Started On:
08/24/2016 09:29 AM
Final Approval Date:
08/26/2016