AI- 60386
Planning Department 16.A.
CC - REGULAR
- Meeting Date:
- 06/27/2017
- Submitted For:
- Flor Castillo
- Submitted By:
- Flor Castillo, PLANNING DEPT.
- Department:
- PLANNING DEPT.
Information
CAPTION
1. Preliminary Approval with Variance Request
a. Martha Bermejo Subdivision- Pct. 3 (Martha Bermejo, Owner) (Mile 3 North Road& Bentsen Palm Drive)
No. of Lots: 1 Multi-Family, 1 Commercial
Flood Zone: C
Drainage: Yes, by onsite detention areas connecting to a type “A” curb inlet.
ETJ: Yes, approved by City of Mission
Water: Yes, provided by Agua S.U.D.
Sewer: Yes, OSSF
Paved: Yes, Mile 3 North Road (F.M. 1924).
b. Alberta Village Subdivision- Pct. 4 (Julio & Melissa Carranza,Owner) (Alberta Road & Raul Longoria Road)
No. of Lots: 36 Single Family
Flood Zone: B
Drainage: Yes, Storm Drainage Pipe System and Detention by widening the existing Drain Ditch.
ETJ: Yes, approved by City of Edinburg
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, Sanitary Sewer provided by City of Edinburg
Paved: Yes, Alberta Road and 1 proposed internal street.
2. Preliminary Approval
a. Rancho El Potrero Subdivision- Pct. 3 (Manuel Chapa, Owner) (Western Road & Mile 3 North Road)
No. of Lots: 74 Single Family
Flood Zone: C
Drainage: Yes, Storm Sewer System discharging to an existing drainage basin owned by the HCDD#1.
ETJ: Yes, approved by the City of Mission
Water: Yes, provided by Agua S.U.D.
Sewer: Yes, OSSF
Paved: Yes, Western Road and 3 proposed internal streets.
b. Camino De Abram Subdivision- Pct. 3 (Manuel Chapa, Owner) (Abram Road & Mile 3 North Road)
No. of Lots: 80 Single Family
Flood Zone: X
Drainage: Yes, Storm Sewer System discharging to an existing drainage basin owned by the HCDD#1.
ETJ: Yes, approved by the City of Mission.
Water: Yes, provided by Agua S.U.D.
Sewer: Yes, OSSF
Paved: Yes, Abram Road and 4 proposed internal streets.
c. Eduardo’s No. 15 Subdivision- Pct. 3 (Diana Izaguirre, Owner) (Trosper Road & Mile 3 North Road)
No. of Lots: 24 Single Family
Flood Zone: C
Drainage: Yes, Storm Drainage Pipe System and Detention by widening the existing Drain Ditch.
ETJ: Yes, approved by the City of Mission.
Water: Yes, provided by Sharyland Water Supply Corporation
Sewer: Yes, Sanitary Sewer provided by City of Mission
Paved: Yes, Trosper Road and 2 proposed internal streets.
3. Final Approval
a. McCain Subdivision- Pct.4 (Roger & Sheila McCain, Owner) (Cessna Ave. & Skylark Avenue)
No. of Lots: 1 Single Family
Flood Zone: B
Drainage: No Storm Drainage and Detention will be required.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, OSSF
Paved: Yes, Skylark Avenue.
b. ECISD Hargill Elementary Subdivision- Pct. 1 (Rene Gutierrez, E.C.I.S.D., Superintendent, Owner)
(Wilson Avenue & 4th Street
No. of Lots: 1 Institutional
Flood Zone: C
Drainage: Yes, by onsite detention area.
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply
Paved: Yes, 4th Street.
c. Hernandez Macias Subdivision- Pct. 2 (Noe Hernandez, Owner) (Alamo Road & Earling Road)
No. of Lots: 1 Single Family
Flood Zone: B & C
Drainage: Yes, by onsite detention areas and by re-grading Alamo road side ditch.
ETJ: Yes, approved by the City of Alamo.
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, OSSF
Paved: Yes, Alamo Road.
d. TVM Properties Subdivision- Pct. 4 (Thomas Arce, Jr., Owner) (Curve Road & Val Verde Road)
No. of Lots: 3 Commercial
Flood Zone: X
Drainage: Yes, by onsite detention areas to be constructed at building permit stage.
ETJ: No, Rural Area
Water: Provided by North Alamo Water Supply
Sewer: Yes, OSSF. Will be installed at permit stage.
Paved: Yes, Val Verde Road.
e. Loma Verde No. 4 Subdivision- Pct. 4 (Kyle Ruppert, Owner) (Mile 21 Road & F.M. 2812)
No. of Lots: 7 Single Family
Flood Zone: X
Drainage: Reconstruction of Mile 21 Road side ditch with a discharge outfall onto HCDD#1 ditch.
ETJ: No, Rural Area
Water: Provided by North Alamo Water Supply
Sewer: Yes, OSSF
Paved: No, Mile 21 Road to be paved.Developer has submitted 1/3 escrow for Road improvement.
f. Pueblo De Palmas Ph. 21 Subdivision- Pct. 4 (J. Gary Frisby, Owner) (Davis Road & Kenyon Road)
No. of Lots: 45 Single Family
Flood Zone: X
Drainage: Yes, by Storm Drainage Pipe System that connects to the existing drainage system of Pueblo De
Palmas Ph. 19 Subdivision.
ETJ: Yes, approved by the City of Edinburg.
Water: Provided by North Alamo Water Supply
Sewer: Yes, Sanitary Sewer provided by City of Edinburg
Paved: Yes, Kenyon Road and 2 internal streets.
g. Bon Viejo Ph. 2 Subdivision- Pct. 1 (Kyndel W. Bennett, Owner) (Mile 13 North Road & F.M. 493)
No. of Lots: 56 Single Family
Flood Zone: C
Drainage: Yes, Storm Drainage Pipe System and Detention by widening the existing Drain Ditch.
ETJ: Yes, approved by the City of Donna
Water: Provided by North Alamo Water Supply
Sewer: Yes, OSSF
Paved: Yes, Mile 13 North Road and 3 internal streets.
a. Martha Bermejo Subdivision- Pct. 3 (Martha Bermejo, Owner) (Mile 3 North Road& Bentsen Palm Drive)
No. of Lots: 1 Multi-Family, 1 Commercial
Flood Zone: C
Drainage: Yes, by onsite detention areas connecting to a type “A” curb inlet.
ETJ: Yes, approved by City of Mission
Water: Yes, provided by Agua S.U.D.
Sewer: Yes, OSSF
Paved: Yes, Mile 3 North Road (F.M. 1924).
b. Alberta Village Subdivision- Pct. 4 (Julio & Melissa Carranza,Owner) (Alberta Road & Raul Longoria Road)
No. of Lots: 36 Single Family
Flood Zone: B
Drainage: Yes, Storm Drainage Pipe System and Detention by widening the existing Drain Ditch.
ETJ: Yes, approved by City of Edinburg
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, Sanitary Sewer provided by City of Edinburg
Paved: Yes, Alberta Road and 1 proposed internal street.
2. Preliminary Approval
a. Rancho El Potrero Subdivision- Pct. 3 (Manuel Chapa, Owner) (Western Road & Mile 3 North Road)
No. of Lots: 74 Single Family
Flood Zone: C
Drainage: Yes, Storm Sewer System discharging to an existing drainage basin owned by the HCDD#1.
ETJ: Yes, approved by the City of Mission
Water: Yes, provided by Agua S.U.D.
Sewer: Yes, OSSF
Paved: Yes, Western Road and 3 proposed internal streets.
b. Camino De Abram Subdivision- Pct. 3 (Manuel Chapa, Owner) (Abram Road & Mile 3 North Road)
No. of Lots: 80 Single Family
Flood Zone: X
Drainage: Yes, Storm Sewer System discharging to an existing drainage basin owned by the HCDD#1.
ETJ: Yes, approved by the City of Mission.
Water: Yes, provided by Agua S.U.D.
Sewer: Yes, OSSF
Paved: Yes, Abram Road and 4 proposed internal streets.
c. Eduardo’s No. 15 Subdivision- Pct. 3 (Diana Izaguirre, Owner) (Trosper Road & Mile 3 North Road)
No. of Lots: 24 Single Family
Flood Zone: C
Drainage: Yes, Storm Drainage Pipe System and Detention by widening the existing Drain Ditch.
ETJ: Yes, approved by the City of Mission.
Water: Yes, provided by Sharyland Water Supply Corporation
Sewer: Yes, Sanitary Sewer provided by City of Mission
Paved: Yes, Trosper Road and 2 proposed internal streets.
3. Final Approval
a. McCain Subdivision- Pct.4 (Roger & Sheila McCain, Owner) (Cessna Ave. & Skylark Avenue)
No. of Lots: 1 Single Family
Flood Zone: B
Drainage: No Storm Drainage and Detention will be required.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, OSSF
Paved: Yes, Skylark Avenue.
b. ECISD Hargill Elementary Subdivision- Pct. 1 (Rene Gutierrez, E.C.I.S.D., Superintendent, Owner)
(Wilson Avenue & 4th Street
No. of Lots: 1 Institutional
Flood Zone: C
Drainage: Yes, by onsite detention area.
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply
Paved: Yes, 4th Street.
c. Hernandez Macias Subdivision- Pct. 2 (Noe Hernandez, Owner) (Alamo Road & Earling Road)
No. of Lots: 1 Single Family
Flood Zone: B & C
Drainage: Yes, by onsite detention areas and by re-grading Alamo road side ditch.
ETJ: Yes, approved by the City of Alamo.
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, OSSF
Paved: Yes, Alamo Road.
d. TVM Properties Subdivision- Pct. 4 (Thomas Arce, Jr., Owner) (Curve Road & Val Verde Road)
No. of Lots: 3 Commercial
Flood Zone: X
Drainage: Yes, by onsite detention areas to be constructed at building permit stage.
ETJ: No, Rural Area
Water: Provided by North Alamo Water Supply
Sewer: Yes, OSSF. Will be installed at permit stage.
Paved: Yes, Val Verde Road.
e. Loma Verde No. 4 Subdivision- Pct. 4 (Kyle Ruppert, Owner) (Mile 21 Road & F.M. 2812)
No. of Lots: 7 Single Family
Flood Zone: X
Drainage: Reconstruction of Mile 21 Road side ditch with a discharge outfall onto HCDD#1 ditch.
ETJ: No, Rural Area
Water: Provided by North Alamo Water Supply
Sewer: Yes, OSSF
Paved: No, Mile 21 Road to be paved.Developer has submitted 1/3 escrow for Road improvement.
f. Pueblo De Palmas Ph. 21 Subdivision- Pct. 4 (J. Gary Frisby, Owner) (Davis Road & Kenyon Road)
No. of Lots: 45 Single Family
Flood Zone: X
Drainage: Yes, by Storm Drainage Pipe System that connects to the existing drainage system of Pueblo De
Palmas Ph. 19 Subdivision.
ETJ: Yes, approved by the City of Edinburg.
Water: Provided by North Alamo Water Supply
Sewer: Yes, Sanitary Sewer provided by City of Edinburg
Paved: Yes, Kenyon Road and 2 internal streets.
g. Bon Viejo Ph. 2 Subdivision- Pct. 1 (Kyndel W. Bennett, Owner) (Mile 13 North Road & F.M. 493)
No. of Lots: 56 Single Family
Flood Zone: C
Drainage: Yes, Storm Drainage Pipe System and Detention by widening the existing Drain Ditch.
ETJ: Yes, approved by the City of Donna
Water: Provided by North Alamo Water Supply
Sewer: Yes, OSSF
Paved: Yes, Mile 13 North Road and 3 internal streets.
BACKGROUND
Fiscal Impact
Attachments
- Martha Bermejo Subd.
- Alberta Village Subd.
- Rancho el Potrero Subd.
- Camino De Abram Subd.
- Eduardo's No. 15 Subd.
- McCain Subd.
- ECISD Hargill Elem. Subd.
- Hernandez Macias Subd.
- TVM Properties Subd.
- Loma Verde NO.4 Subd.
- Pueblo de Palmas #21 Subd.
- Bon Viejo Ph. 2 Subd.
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Veronica Ortiz | 06/21/2017 04:42 PM |
| Budget and Management | Veronica Ortiz | 06/21/2017 04:42 PM |
| Final Approval | Monica Salinas | 06/23/2017 06:36 PM |
- Form Started By:
- Flor Castillo
- Started On:
- 06/21/2017 04:04 PM
- Final Approval Date:
- 06/23/2017