Skip to main content

AgendaQuick™

View Agenda Item

AI- 64579
Planning Department   16.A.
CC - REGULAR
Meeting Date:
04/24/2018
Submitted For:
Flor Castillo
Submitted By:
Flor Castillo, PLANNING DEPT.
Department:
PLANNING DEPT.

Information

CAPTION

1. Preliminary Approval with Variance Request
a. Treviño Brothers Subdivision- Pct. 4 (Hector Treviño) (Valverde Road & Mile 15 North Road)
No. of Lots: 2 Single Family
Flood Zone: C
Drainage: Yes, Drainage will be provided by natural perculation and surface run-off onto Valverde Road side ditch.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, OSSF
Paved: Yes, Valverde Road.

2. Preliminary Approval
a. A. Valadez #2 Subdivision- Pct. 4 (Adolfo Valadez) (Mile 20 North Road & Valverde Road)
No. of Lots: 5 Single Family
Flood Zone: X
Drainage: Yes, Drainage will be provided by natural perculation and surface run-off onto Mile 20 North Road side ditch.
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, OSSF
Paved: Yes, Mile 20 North Road.

b. Bellawoods Subdivision- Pct. 4 (Daniel Moffatt) (Benito Ramirez Road & Cesar Chavez Road)
No. of Lots: 52 Single Family
Flood Zone: X
Drainage: Yes, Drainage will be provided by storm drainage pipe system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, Sanitary Sewer provided by City of Edinburg
Paved: Yes, Benito Ramirez Road and 1 internal street to be paved.

c. Del Rey Estates Unit 3 Subdivision- Pct. 4 (Kyndel W. Bennett) (Canton Road & Alamo Road)
No. of Lots: 211 Single Family; 23 Commercial
Flood Zone: B
Drainage: Yes, Drainage will be provided by storm drainage pipe system and will discharge onto an existing drain ditch located ¼ mile north of Canton Road. 
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, OSSF
Paved: Yes, Canton Road and Alamo Road.7 internal streets to be paved.

3. Final Approval
a. Universal Estates RL Subdivision- Pct. 4 (Rosa Maria A. Vigon) (Raul Longoria Road & Trenton Road)
No. of Lots: 1 Commercial
Flood Zone: B
Drainage: Yes, Drainage will be provided by onsite detention ponds with a 8” pvc connection into an existing type “A” inlet along Raul Longoria Road (F.M. 1426).
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, Sanitary Sewer provided by City of Edinburg
Paved: Yes, Raul Longoria Road.

b. Fuentes Legacy Subdivision- Pct. 1 (Antonia Fuentes) (Black Street & Adam Street)
No. of Lots: 2 Single Family
Flood Zone: X
Drainage: Yes, Drainage will be provided by natural perculation and surface run-off onto Black Street Road side ditch.
ETJ: Yes, approved by the City of Weslaco.
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, OSSF
Paved: Yes, Black Street.

c. Brushline Estates Subdivision- Pct. 4 (Ferdinando Garcia) (Brushline Road & F.M. 2812)
No. of Lots: 5 Single Family
Flood Zone: X
Drainage: Yes, Drainage will be provided by natural perculation and surface run-off onto Brushline Road side ditch.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, OSSF
Paved: Yes, Brushline Road.

4. Final Approval with Financial Guarantee
a. Riviera Subdivision- Pct. 4 (Claudia Viera) (Skinner Road & Monte Cristo Road)
No. of Lots: 2 Single Family
Flood Zone: Property lies within Flood Zone: “X & AE” as per FEMA.  A portion of Flood Zone “AE” has been removed via LOMR-F Case# 18-06-07-49a dated 2-07-2018 and revised to Zone “X” shaded BFE: 72.00.
Drainage: Yes, Drainage will be provided by natural perculation on large lot and surface run-off onto Skinner Road side ditch.
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply
Sewer: Yes, OSSF for Lot 1 has been installed and Lot 2 has been escrowed.
Paved: Yes, Skinner Road.
*Final Approval with Cash Deposit in the amount of  $1,500.00 for 1 OSSF. 
 

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 04/19/2018 07:40 AM
Final Approval Monica Salinas 04/20/2018 05:23 PM
Form Started By:
Flor Castillo
Started On:
04/18/2018 02:59 PM
Final Approval Date:
04/20/2018