AI- 69510
Planning Department 15.A.
CC - REGULAR
- Meeting Date:
- 03/26/2019
- Submitted For:
- Flor Castillo
- Submitted By:
- Flor Castillo, PLANNING DEPT.
- Department:
- PLANNING DEPT.
Information
CAPTION
1. Preliminary Approval with Variance Request
a. Santa Fe Terrace Subdivision- Pct. 2 (Oscar Hernandez) (El Gato Road & South 3rd Street)
No. of Lots: 7 Single Family
Flood Zone: B
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into El Gato Road side ditch.
ETJ: Yes, approved by the City of Alamo.
Water: Yes, provided by Military Highway Water Supply Corporation.
Sewer: Yes, Sanitary Sewer provided by Military Highway Water Supply.
2. Preliminary Approval
a. RePlat of Lot 2 Fidencio Garcia Estates Subdivision- Pct. 1 (Melissa Garcia) (Monte Cristo Road & F.M. 493)
No. of Lots: 2 Single Family
Flood Zone: X
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into Monte Cristo Road side ditch.
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s
b. Ruben Valdez Subdivision- Pct. 4 (Ruben & Velma Valdez) (North Taylor Road & Mile 5 North Road)
No. of Lots: 2 Single Family, 1 Multi-Family
Flood Zone: X
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into North Taylor Road side ditch.
ETJ: Yes, approved by the City of McAllen.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, Sanitary Sewer provided by Sharyland Water Supply Corporation.
c. Resendez Subdivision- Pct. 4 (Sergio Resendez) (Canton Road & Tower Road)
No. of Lots: 4 Single Family
Flood Zone: B
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into
Canton Road side ditch.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s
d. Las Comadres #6 Subdivision- Pct. 3 (Carlos G. Leal, Jr.) (Iowa Road & Mile 4 North Road)
No. of Lots: 66 Single Family
Streetlights: To be determined
Flood Zone: X
Drainage: Yes, Drainage will be provided by a Storm Sewer System discharging to HCDD#1 Regional Detention Facility approximately ½ mile southwest from the proposed subdivision.
ETJ: Yes, approved by the City of Mission.
Water: Yes, provided by Agua SUD
Sewer: Yes, OSSF’s
Paved: 4 internal streets to be paved.
e. Pueblo De Palmas Phase 23 Subdivision- Pct. 4 (PDP Mile 4, LTD.) (Alamo Road & Mile 19 North Road)
No. of Lots: 89 Single Family
Streetlights: To be determined
Flood Zone: X
Drainage: Yes, Drainage will be provided by a Storm Sewer System and Detention will be provided by widening the existing drain ditch.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, Sanitary Sewer provided by City of Edinburg.
Paved: 5 internal streets to be paved.
3. Final Approval
a. El Mirador Subdivision - Pct. 4 (Alvar Gonzalez) (F.M. 2128 & Cesar Chavez Road)
No. of Lots: 1 Multi-Family
Flood Zone: X
Drainage: Yes, Drainage will be provided by onsite detention with a proposed 8” PVC Bleeder line connecting to an existing TxDot inlet along F.M. 2128.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF has been installed.
4. Final Approval with Financial Guarantee
a. Mesquite Xrossing Subdivision- Pct. 1 (Daniel Alaniz) (F.M. 88 & Mile 14 North Road)
No. of Lots: 5 Single Family
Flood Zone: X
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff along the front area of the lots discharging into existing TxDot System.
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, (5) OSSF’s have been escrowed.
*Final Approval with Cash Deposit in the amount of $8,700.00 for 5 OSSF’s and 2 Shared Driveways.
a. Santa Fe Terrace Subdivision- Pct. 2 (Oscar Hernandez) (El Gato Road & South 3rd Street)
No. of Lots: 7 Single Family
Flood Zone: B
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into El Gato Road side ditch.
ETJ: Yes, approved by the City of Alamo.
Water: Yes, provided by Military Highway Water Supply Corporation.
Sewer: Yes, Sanitary Sewer provided by Military Highway Water Supply.
2. Preliminary Approval
a. RePlat of Lot 2 Fidencio Garcia Estates Subdivision- Pct. 1 (Melissa Garcia) (Monte Cristo Road & F.M. 493)
No. of Lots: 2 Single Family
Flood Zone: X
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into Monte Cristo Road side ditch.
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s
b. Ruben Valdez Subdivision- Pct. 4 (Ruben & Velma Valdez) (North Taylor Road & Mile 5 North Road)
No. of Lots: 2 Single Family, 1 Multi-Family
Flood Zone: X
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into North Taylor Road side ditch.
ETJ: Yes, approved by the City of McAllen.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, Sanitary Sewer provided by Sharyland Water Supply Corporation.
c. Resendez Subdivision- Pct. 4 (Sergio Resendez) (Canton Road & Tower Road)
No. of Lots: 4 Single Family
Flood Zone: B
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into
Canton Road side ditch.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s
d. Las Comadres #6 Subdivision- Pct. 3 (Carlos G. Leal, Jr.) (Iowa Road & Mile 4 North Road)
No. of Lots: 66 Single Family
Streetlights: To be determined
Flood Zone: X
Drainage: Yes, Drainage will be provided by a Storm Sewer System discharging to HCDD#1 Regional Detention Facility approximately ½ mile southwest from the proposed subdivision.
ETJ: Yes, approved by the City of Mission.
Water: Yes, provided by Agua SUD
Sewer: Yes, OSSF’s
Paved: 4 internal streets to be paved.
e. Pueblo De Palmas Phase 23 Subdivision- Pct. 4 (PDP Mile 4, LTD.) (Alamo Road & Mile 19 North Road)
No. of Lots: 89 Single Family
Streetlights: To be determined
Flood Zone: X
Drainage: Yes, Drainage will be provided by a Storm Sewer System and Detention will be provided by widening the existing drain ditch.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, Sanitary Sewer provided by City of Edinburg.
Paved: 5 internal streets to be paved.
3. Final Approval
a. El Mirador Subdivision - Pct. 4 (Alvar Gonzalez) (F.M. 2128 & Cesar Chavez Road)
No. of Lots: 1 Multi-Family
Flood Zone: X
Drainage: Yes, Drainage will be provided by onsite detention with a proposed 8” PVC Bleeder line connecting to an existing TxDot inlet along F.M. 2128.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF has been installed.
4. Final Approval with Financial Guarantee
a. Mesquite Xrossing Subdivision- Pct. 1 (Daniel Alaniz) (F.M. 88 & Mile 14 North Road)
No. of Lots: 5 Single Family
Flood Zone: X
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff along the front area of the lots discharging into existing TxDot System.
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, (5) OSSF’s have been escrowed.
*Final Approval with Cash Deposit in the amount of $8,700.00 for 5 OSSF’s and 2 Shared Driveways.
BACKGROUND
Fiscal Impact
Attachments
- Santa Fe Terrace Subd.
- RePlat of Lot 2 Fidencio Garcia Est.
- Ruben Valdez subd.
- Resendez Subd.
- Las Comadres #6 Subd.
- Pueblo De Palmas 23 subd.
- El Mirador Subd.
- Mesquite Xrossing Subd.
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Veronica Ortiz | 03/21/2019 02:18 PM |
| Final Approval | Monica Salinas | 03/22/2019 05:59 PM |
- Form Started By:
- Flor Castillo
- Started On:
- 03/21/2019 11:26 AM
- Final Approval Date:
- 03/22/2019