AI- 76083
Planning Department 14.A.
CC REGULAR AGENDA SPECIAL MTG
- Meeting Date:
- 06/23/2020
- Submitted For:
- Flor Castillo
- Submitted By:
- Flor Castillo, PLANNING DEPT.
- Department:
- PLANNING DEPT.
Information
CAPTION
1. Preliminary Approval
a. Rancho El Viejito Subdivision- Pct. 1 (Lucila Martinez De Cantu) (Anderson Road & Dillon Road)
No. of Lots: 3 Single Family
Flood Zone: C
Estimated Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff onto Anderson Road side ditch.
ETJ: Yes, approved by the City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s
Paved: Yes, Anderson Road is paved.
b. Silver Heights Subdivision- Pct. 4 (Robert Garza) (Raul Longoria Road & Trenton Road)
No. of Lots: 45 Single Family, 2 Commercial
Flood Zone: B
Estimated Number of Streetlights:6
Filling Stations:3
Drainage: Yes, Drainage will be provided by storm sewer system with onsite detention and discharging onto an existing drainage system along Raul Longoria Road.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply Corporation.
Paved: Yes, Raul Longoria Road is paved and 2 internal streets to be paved.
2. Final Approval with Variance Request
a. Amended Plat of Amigo Estates Commercial Subdivision- Pct. 4 (CRV Investments, L.L.C.) (F.M. 2812 & Cesar Chavez Road)
No. of Lots: 1 Commercial
Flood Zone: X
Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by onsite detention based on the approved site plan and drainage report.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF
Paved: Yes, F.M. 2812 is paved.
3. Final Approval
a. Midnight Run Subdivision - Pct. 4 (Luis Garcia Jr.) (Rogers Road & Citation Drive)
No. of Lots: 1 Single Family
Flood Zone: X
Streetlights: N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Rogers Road side ditch.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF has been installed.
Paved: Yes, Rogers Road and Citation Drive are paved.
b. Ruben Valdez Subdivision - Pct. 4 (Ruben & Velma Valdez) (Taylor Road & Mile 5 North Road)
No. of Lots: 2 Single Family 1 Multi-Family
Flood Zone: X
Streetlights: N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff onto north Taylor Road side ditch.
ETJ: Yes, approved by the City of McAllen.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, Sanitary Sewer provided by Sharyland Water Supply Corporation.
Paved: Yes, Taylor Road is paved.
c. La Plazita Phase II Subdivision - Pct. 1 (Xenon Inc.) (Kennedy Street & Mile 10 North Road)
No. of Lots: 4 Single Family
Flood Zone: X
Streetlights: N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff onto Kennedy Street road side ditch.
ETJ: Yes, approved by the City of Weslaco.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s have been installed.
Paved: Yes, Kennedy Street is paved.
d. Abram Estates No. 1 Subdivision - Pct. 3 (Victor J. Daniec) (Abram Road & Business 83)
No. of Lots: 121 Single Family
Flood Zone: C
Streetlights: 12
Filling Stations:6
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, approved by the City of Palmview.
Water: Yes, provided by Agua SUD.
Sewer: Yes, Sanitary Sewer provided by Agua SUD.
Paved: Yes, Abram Road is paved and 5 internal streets are paved.
4. Final Approval with Financial Guarantee
a. Re-Plat of Lot 2 Fidencio Garcia Estates Subdivision- Pct. 1 (Melissa Garcia) (Monte Cristo Road & F.M. 493)
No. of Lots: 2 Single Family
Flood Zone:X
Streetlights: N/A
Filling Stations: N/A
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into Monte Cristo Road side ditch.
ETJ: No, Rural Area.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF for lot 2A has been escrowed and Lot 2B has been installed.
Final Approval with a cash deposit in the amount of $1,500.00 for 1 OSSF.
Paved: Yes, Monte Cristo Road is paved.
b. Rio Rico Ranchettes Subdivision- Pct. 1 (Victor J. Daniec) (Mile 3 North Road & Mile 2 ½ East Road)
No. of Lots: 4 Single Family
Flood Zone:C
Streetlights: N/A
Filling Stations: N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff onto Mile 3 North Road side ditch and Mile 2 ½ East Road side ditch.
ETJ: No, Rural Area.
Water: Yes, provided by Military Highway Water Supply Corporation.
Sewer: Yes, OSSF’s have been escrowed.
Final Approval with a cash deposit in the amount of $6,000.00 for 4 OSSF’s.
Paved: Yes, Mile 3 North Road and Mile 2 ½ East Road are paved.
c. Ranchettes on Monte Cristo Subdivision- Pct. 1 (Victor J. Daniec) (Monte Cristo Road & F.M. 493)
No. of Lots: 10 Single Family
Flood Zone:X
Streetlights: 6
Filling Stations: 2
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: No, Rural Area.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s have been escrowed.
Final Approval with a cash deposit in the amount of $15,000.00 for 10 OSSF’s.
Final Approval with a cash deposit in the amount of $9,000.00 for 2 Filling Stations.
Paved: Yes, Monte Cristo Road and 2 internal streets are paved.
d. San Lucio No. 3 Subdivision- Pct. 1 (Tillmin Welch) (Dillon Road & Trenton Road)
No. of Lots: 13 Single Family
Flood Zone:C
Streetlights: N/A
Filling Stations: 2 and have been escrowed with City of Donna.
Drainage: Yes, Drainage will be provided by regrading the existing road side ditch along the east side of Dillon Road and the north side of Trenton Road. Detention will be provided by widening the existing drain ditch.
ETJ: Yes, approved by the City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s have been escrowed.
Final Approval with a cash deposit in the amount of $19,500.00 for 13 OSSF’s.
Paved: Yes, Dillon Road is paved.
e. San Marcos No. 2 Subdivision- Pct. 1 (Zachary Scurlock) (Mile 19 North Road & F.M. 88)
No. of Lots: 47 Single Family
Flood Zone:X
Streetlights: 11
Filling Stations: 4
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: No, Rural Area.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s have been installed.
Final Approval with a cash deposit in the amount of $12,700.00 for 4 Filling Stations.
Paved: Yes, Mile 19 North Road, F.M. 88 and 3 internal streets are paved.
f. Valle Mesa Estates Subdivision- Pct. 1 (Kyndel W. Bennett) (Mile 13 ½ North Road & F.M. 493)
No. of Lots: 65 Single Family
Flood Zone:C
Streetlights: 11
Filling Stations: 4
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, approved by the City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s have been installed.
Final Approval with a cash deposit in the amount of $20,000.00 for 4 Filling Stations.
Paved: Yes, Mile 13 ½ North Road and 3 internal streets are paved.
a. Rancho El Viejito Subdivision- Pct. 1 (Lucila Martinez De Cantu) (Anderson Road & Dillon Road)
No. of Lots: 3 Single Family
Flood Zone: C
Estimated Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff onto Anderson Road side ditch.
ETJ: Yes, approved by the City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s
Paved: Yes, Anderson Road is paved.
b. Silver Heights Subdivision- Pct. 4 (Robert Garza) (Raul Longoria Road & Trenton Road)
No. of Lots: 45 Single Family, 2 Commercial
Flood Zone: B
Estimated Number of Streetlights:6
Filling Stations:3
Drainage: Yes, Drainage will be provided by storm sewer system with onsite detention and discharging onto an existing drainage system along Raul Longoria Road.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply Corporation.
Paved: Yes, Raul Longoria Road is paved and 2 internal streets to be paved.
2. Final Approval with Variance Request
a. Amended Plat of Amigo Estates Commercial Subdivision- Pct. 4 (CRV Investments, L.L.C.) (F.M. 2812 & Cesar Chavez Road)
No. of Lots: 1 Commercial
Flood Zone: X
Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by onsite detention based on the approved site plan and drainage report.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF
Paved: Yes, F.M. 2812 is paved.
3. Final Approval
a. Midnight Run Subdivision - Pct. 4 (Luis Garcia Jr.) (Rogers Road & Citation Drive)
No. of Lots: 1 Single Family
Flood Zone: X
Streetlights: N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Rogers Road side ditch.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF has been installed.
Paved: Yes, Rogers Road and Citation Drive are paved.
b. Ruben Valdez Subdivision - Pct. 4 (Ruben & Velma Valdez) (Taylor Road & Mile 5 North Road)
No. of Lots: 2 Single Family 1 Multi-Family
Flood Zone: X
Streetlights: N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff onto north Taylor Road side ditch.
ETJ: Yes, approved by the City of McAllen.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, Sanitary Sewer provided by Sharyland Water Supply Corporation.
Paved: Yes, Taylor Road is paved.
c. La Plazita Phase II Subdivision - Pct. 1 (Xenon Inc.) (Kennedy Street & Mile 10 North Road)
No. of Lots: 4 Single Family
Flood Zone: X
Streetlights: N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff onto Kennedy Street road side ditch.
ETJ: Yes, approved by the City of Weslaco.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s have been installed.
Paved: Yes, Kennedy Street is paved.
d. Abram Estates No. 1 Subdivision - Pct. 3 (Victor J. Daniec) (Abram Road & Business 83)
No. of Lots: 121 Single Family
Flood Zone: C
Streetlights: 12
Filling Stations:6
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, approved by the City of Palmview.
Water: Yes, provided by Agua SUD.
Sewer: Yes, Sanitary Sewer provided by Agua SUD.
Paved: Yes, Abram Road is paved and 5 internal streets are paved.
4. Final Approval with Financial Guarantee
a. Re-Plat of Lot 2 Fidencio Garcia Estates Subdivision- Pct. 1 (Melissa Garcia) (Monte Cristo Road & F.M. 493)
No. of Lots: 2 Single Family
Flood Zone:X
Streetlights: N/A
Filling Stations: N/A
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into Monte Cristo Road side ditch.
ETJ: No, Rural Area.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF for lot 2A has been escrowed and Lot 2B has been installed.
Final Approval with a cash deposit in the amount of $1,500.00 for 1 OSSF.
Paved: Yes, Monte Cristo Road is paved.
b. Rio Rico Ranchettes Subdivision- Pct. 1 (Victor J. Daniec) (Mile 3 North Road & Mile 2 ½ East Road)
No. of Lots: 4 Single Family
Flood Zone:C
Streetlights: N/A
Filling Stations: N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff onto Mile 3 North Road side ditch and Mile 2 ½ East Road side ditch.
ETJ: No, Rural Area.
Water: Yes, provided by Military Highway Water Supply Corporation.
Sewer: Yes, OSSF’s have been escrowed.
Final Approval with a cash deposit in the amount of $6,000.00 for 4 OSSF’s.
Paved: Yes, Mile 3 North Road and Mile 2 ½ East Road are paved.
c. Ranchettes on Monte Cristo Subdivision- Pct. 1 (Victor J. Daniec) (Monte Cristo Road & F.M. 493)
No. of Lots: 10 Single Family
Flood Zone:X
Streetlights: 6
Filling Stations: 2
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: No, Rural Area.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s have been escrowed.
Final Approval with a cash deposit in the amount of $15,000.00 for 10 OSSF’s.
Final Approval with a cash deposit in the amount of $9,000.00 for 2 Filling Stations.
Paved: Yes, Monte Cristo Road and 2 internal streets are paved.
d. San Lucio No. 3 Subdivision- Pct. 1 (Tillmin Welch) (Dillon Road & Trenton Road)
No. of Lots: 13 Single Family
Flood Zone:C
Streetlights: N/A
Filling Stations: 2 and have been escrowed with City of Donna.
Drainage: Yes, Drainage will be provided by regrading the existing road side ditch along the east side of Dillon Road and the north side of Trenton Road. Detention will be provided by widening the existing drain ditch.
ETJ: Yes, approved by the City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s have been escrowed.
Final Approval with a cash deposit in the amount of $19,500.00 for 13 OSSF’s.
Paved: Yes, Dillon Road is paved.
e. San Marcos No. 2 Subdivision- Pct. 1 (Zachary Scurlock) (Mile 19 North Road & F.M. 88)
No. of Lots: 47 Single Family
Flood Zone:X
Streetlights: 11
Filling Stations: 4
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: No, Rural Area.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s have been installed.
Final Approval with a cash deposit in the amount of $12,700.00 for 4 Filling Stations.
Paved: Yes, Mile 19 North Road, F.M. 88 and 3 internal streets are paved.
f. Valle Mesa Estates Subdivision- Pct. 1 (Kyndel W. Bennett) (Mile 13 ½ North Road & F.M. 493)
No. of Lots: 65 Single Family
Flood Zone:C
Streetlights: 11
Filling Stations: 4
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, approved by the City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s have been installed.
Final Approval with a cash deposit in the amount of $20,000.00 for 4 Filling Stations.
Paved: Yes, Mile 13 ½ North Road and 3 internal streets are paved.
BACKGROUND
Fiscal Impact
Attachments
- Rancho el Viejito
- Silver heights
- Amend. Plat of Amigo Est. Comm.
- Midnight Run
- Ruben Valdez
- La Plazita 2
- Abram Est. 1
- Re-Plat of Lot 2 Fidencio Garcia Est.
- Rio Rico Ranchettes
- Ranchettes on Monte Cristo
- San Lucio 3
- San Marcos 2
- Valle Mesa
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | mmunoz | 06/19/2020 09:38 AM |
| Final Approval | Monica Salinas | 06/19/2020 07:52 PM |
- Form Started By:
- Flor Castillo
- Started On:
- 06/18/2020 04:26 PM
- Final Approval Date:
- 06/19/2020