AI- 76999
Planning Department   16.A.
CC REGULAR AGENDA REGULAR MTG
Meeting Date:
08/25/2020
Submitted For:
Flor Castillo
Submitted By:
Flor Castillo, PLANNING DEPT.
Department:
PLANNING DEPT.

CAPTION

1. Preliminary Approval with Variance Request
a. Milanos Estates Subdivision- Pct. 1 (Garvic Properties, LP) (Mile 6 ½ West Road & Mile 5 ½ North Road)
 No. of Lots: 88 Single Family
 Flood Zone: B
 Estimated Number of Streetlights:14
 Filling Stations:11
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: Yes, approved by the City of Weslaco.
 Water: Yes, provided by City of Weslaco.
 Sewer: Yes, Sanitary Sewer provided by City of Weslaco.
 Paved: Yes, Mile 6 ½ West Road is paved and 5 internal streets to be paved.
 
b. Pueblo De Palmas Phase 25 Subdivision- Pct. 4 (Gary Frisby) (Cesar Chavez Road & Mile 19 North Road)
 No. of Lots: 140 Single Family
 Flood Zone: X
 Estimated Number of Streetlights:20
 Filling Stations:6
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by an existing drain ditch.
 ETJ: Yes, approved by the City of Edinburg.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, Sanitary Sewer provided by City of Edinburg.
 Paved: No, Cesar Chavez Road and 7 internal streets to be paved.
 
2. Preliminary Approval
a. Ocañas Subdivision- Pct. 2 (Jose Domingo Ocañas) (Eldora Road & Alamo Road)
 No. of Lots: 2 Single Family
 Flood Zone: B
 Estimated Number of Streetlights:N/A
 Filling Stations:N/A
 Drainage: Yes, Drainage will be provided by natural perculation and surface runoff onto Eldora Road side ditch.
 ETJ: Yes, approved by the City of Alamo.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s
 Paved: Yes, Eldora Road is paved.
 
b. Agado Subdivision- Pct. 1 (Eloy Agado) (U.S. Hwy 281 & F.M. 491)
 No. of Lots: 3 Single Family, 2 Commercial
 Flood Zone: C
 Estimated Number of Streetlights:N/A
 Filling Stations:N/A
 Drainage: Yes, Drainage will be provided by onsite detention in commercial lots and discharging onto U.S. Hwy 281 road side ditch.
 ETJ: No, Rural Area.
 Water: Yes, provided by Military Highway Water Supply Corporation.
 Sewer: Yes, OSSF’s
 Paved: Yes, U.S. Hwy 281 & Old Military Road are paved.
 
3. Final Approval with Financial Guarantee
a. NM Subdivision- Pct. 4 (Noe Martinez) (3rd Street & Davis Road)
 No. of Lots: 1 Single Family
 Flood Zone:X
 Streetlights: N/A
 Filling Stations: N/A
 Drainage: Yes, Drainage will be provided by natural perculation within the proposed lot and surface runoff will drain onto 3rd Street road side ditch.
 ETJ: No, Rural Area.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF has been escrowed.
 *Final Approval with a cash deposit in the amount of $1,500.00 for 1 OSSF.
Paved: Yes, 3rd Street is paved.
 
b. Valverde Commercial Acres Subdivision- Pct. 4 (Bernardo Chapa) (Valverde Road & Tex-Mex Road)
 No. of Lots: 13 Commercial 
Flood Zone: X
 Streetlights: N/A
 Filling Stations: 2
 Drainage: Yes, Drainage will be provided by onsite detention and offsite storm sewer system discharging onto an existing drain ditch.
 ETJ: No, Rural Area.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s will be installed at building permit stage.
 *Final Approval with a letter of credit in the amount of $127,278.00 for Paving & Drainage.
Paved: Yes, Valverde Road and Tex-Mex Road are paved.
 
c. RBR Subdivision No. 1 - Pct. 4 (Roel A. Rodriguez Jr.) (Mile 21 North Road & Valverde Road)
 No. of Lots: 16 Single Family
 Flood Zone: X
 Streetlights: 4
 Filling Stations: 2
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: No, Rural Area.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s have been installed.
 *Final Approval with a cash deposit in the amount of $3,500.00 for (2) Filling Stations.
Paved: Yes, Mile 21 North Road and 1 internal street are paved.
 
d. Baseline Heights Subdivision Unit No. 3 - Pct. 1 (Robert Closner Jr.) (Mile 12 ½ North Road & F.M. 491)
 No. of Lots: 22 Single Family
 Flood Zone: X
 Streetlights: 4
 Filling Stations: 3
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: Yes, approved by the City of Mercedes.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s have been escrowed.
 *Final Approval with a cash deposit in the amount of $33,000.00 for (22) OSSF’s.
Paved: Yes, Mile 12 ½ North Road and 2 internal streets are paved.
 
e. Los Amigos Phase 2 Subdivision- Pct. 1 (Kyle Ruppert) (Baseline Road & Mile 12 ½ North Road)
 No. of Lots: 26 Single Family
 Flood Zone:X
 Streetlights: 4
 Filling Stations: 2
 Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
 ETJ: No, Rural Area.
 Water: Yes, provided by North Alamo Water Supply Corporation.
 Sewer: Yes, OSSF’s have been escrowed.
 *Final Approval with a cash deposit in the amount of $294,394.00 for Paving, Drainage and OSSF’s.
Paved: Yes, Baseline Road and 1 internal street are paved.

4.  Board Appointments:
a. Re-appointment of Member to the Hidalgo County Subdivision Advisory Board & Hidalgo County Board of Building Line Adjustment - Pct. 4 
b. Re-appointment of Member to the Hidalgo County Subdivision Advisory Board & Hidalgo County Board of Building Line Adjustment - Pct. 2

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 08/20/2020 01:33 PM
Final Approval Monica Salinas 08/21/2020 05:52 PM
Form Started By:
Flor Castillo
Started On:
08/20/2020 10:10 AM
Final Approval Date:
08/21/2020