AI- 78754
Planning Department 14.A.
CC REGULAR AGENDA SPECIAL MTG
- Meeting Date:
- 12/22/2020
- Submitted For:
- Flor Castillo
- Submitted By:
- Flor Castillo, PLANNING DEPT.
- Department:
- PLANNING DEPT.
Information
CAPTION
1. Preliminary Approval
a. J. Leal Subdivision- Pct. 3 (Jesus Eliu Leal De Leon) (Trosper Road & Mile 7 North Road)
No. of Lots: 1 Commercial
Flood Zone: X
Estimated Number of Streetlights:N/A
Filling Stations:1
Drainage: Yes, Drainage will be provided by onsite detention which will connect to an existing TxDot storm system at building permit stage.
ETJ: Yes, approved by the City of McAllen.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, OSSF
Paved: Yes, Mile 7 North Road and Trosper Road are paved.
b. Emily Villarreal Subdivision – Pct. 1 (Martin Villarreal) (Midway Road & Mile 5 North Road)
No. of Lots: 3 Single Family
Flood Zone: B
Estimated Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Mile 5 North Road side ditch.
ETJ: Yes, approved by the City of Weslaco.
Water: Yes, provided by City of Weslaco.
Sewer: Yes, OSSF’s
Paved: Yes, Mile 5 North Road and Midway Road are paved.
c. Owassa Springs Subdivision- Pct. 2 (The Three Rupperts, LLC.) (Owassa Road & Cesar Chavez Road)
No. of Lots: 15 Single Family
Flood Zone:B
Estimated Number of Streetlights: 5
Filling Stations: 2
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF’s
Paved: Yes, Owassa Road is paved and 1 internal street to be paved.
d. Western Oaks Subdivision- Pct. 3 (Rigoberto Villarreal) (Western Road & Mile 6 North Road)
No. of Lots: 42 Single Family
Flood Zone:X
Estimated Number of Streetlights: 18
Filling Stations: 9
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by regional detention areas dedicated to HCDD#1.
ETJ: Yes, approved by the City of Mission.
Water: Yes, provided by Agua SUD.
Sewer: Yes, OSSF’s
Paved: Yes, Western Road is paved.North Abram Road and 2 internal streets to be paved.
e. Blanquita Estates No. 2 Subdivision- Pct. 1 (La Cuesta Sol Development, LTD.) (Canton Road & F.M. 493)
No. of Lots: 42 Single Family
Flood Zone:C
Estimated Number of Streetlights: 10
Filling Stations: 4
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, approved by the City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF’s
Paved: Yes, Canton Road is paved and 3 internal streets to be paved.
f. El Pinto Estates Phase II Subdivision- Pct. 3 (Garvic Properties, LP) (El Pinto Road & Mesquite Lane)
No. of Lots: 47 Single Family
Flood Zone:C
Estimated Number of Streetlights: 9
Filling Stations: 6
Drainage: Yes, Drainage will be provided by onsite detention areas along the rear of the lots.
ETJ: No, Rural Area.
Water: Yes, provided by Agua SUD
Sewer: Yes, OSSF’s for lots 60-69 & sanitary sewer for the remaining lots.
Paved: Yes, El Pinto Road is paved and 1 internal street to be paved.
g. Encenada Estates Subdivision- Pct. 4 (Roman Vera Jr.) (Terry Road & Mile 17 North Road)
No. of Lots: 72 Single Family
Flood Zone:X
Estimated Number of Streetlights: 11
Filling Stations: 7
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply Corporation
Paved: Yes, Terry Road is paved and 5 internal streets to be paved.
h. Rio Rico Ranchettes No. 2 Subdivision- Pct. 1 (BPB Financial Services, LP) (Mile 4 North Road & Mile 1 1/2 East Road)
No. of Lots: 79 Single Family
Flood Zone:C
Estimated Number of Streetlights: 11
Filling Stations: 9
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by proposed drain ditch.
ETJ: No, Rural area.
Water: Yes, provided by Military Highway Water Supply Corporation
Sewer: Yes, OSSF’S
Paved: Yes, Mile 4 North Road is paved.Mile 1 ½ East Road and 2 internal streets to be paved.
i. Cantera Hermosa Phase I Subdivision- Pct. 1 (J.H. McKeever) (Eldora Road & Tower Road)
No. of Lots: 84 Single Family
Flood Zone:C
Estimated Number of Streetlights: 15
Filling Stations: 6
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by proposed drain ditch.
ETJ: Yes, approved by the City of Alamo.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply Corporation
Paved: Yes, Eldora Road is paved and 4 internal streets to be paved.
2. Final Approval with Financial Guarantee
a. The Estates at Paloma Park Subdivision- Pct. 4 (Lionel W. Gegenheimer III) (Alberta Road & Raul Longoria Road)
No. of Lots: 8 Single Family
Flood Zone:B
Streetlights: 5
Filling Stations: 3
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into Alberta Road side ditch.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF’s have been escrowed.
Paved: Yes, Alberta Road is paved.
*Final Approval with a cash deposit in the amount of $12,000.00 for (8) OSSF’s
b. Highland Manor Subdivision- Pct. 1 (Criselda Hinojosa) (Mile 11 North Road & Mile 5 ½ West Road)
No. of Lots: 11 Single Family
Flood Zone:X
Streetlights: N/A
Filling Stations: 3
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Mile 11 North Road side ditch.
ETJ: Yes, approved by the City of Weslaco.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF’s have been escrowed.
Paved: Yes, Mile 11 North Road is paved and Mile 5 ½ West Road to be paved.
*Final Approval with a cash deposit in the amount of $16,500.00 for (11) OSSF’s
c. Sedona Estates Subdivision- Pct. 1 (Cayetano Development) (Sioux Road & Tower Road)
No. of Lots: 135 Single Family
Flood Zone:B
Streetlights: 21
Filling Stations: 14
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, approved by the City of Alamo.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply Corporation.
Paved: Yes, Sioux Road is paved and 5 internal streets to be paved.
*Final Approval with a cash deposit in the amount of $343,286.30 for Paving & Drainage Imps.
d. Bon Viejo Phase 5 Subdivision – Pct. 1 (Kyndel W. Bennett) (Mile 13 ½ North Road & F.M. 493)
No. of Lots: 42 Single Family
Flood Zone:C
Streetlights: 9
Filling Stations: 4
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, approved by the City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s have been installed.
Paved: Yes, Mile 13 ½ North Road and 3 internal streets are paved.
*Final Approval with a cash deposit in the amount of $12,500.00 for Drain ditch & Lot grading.
3. Final Approval
a. AAA Subdivision – Pct. 3 (Angel De La Cerda) (Doffing Road & Mile 5 North Road)
No. of Lots: 1 Multi- Family
Flood Zone:X
Streetlights: N/A
Filling Stations: 1
Drainage: Yes, Drainage will be provided by onsite detention and discharging onto Doffing Road side ditch.
ETJ: Yes, approved by the City of Mission.
Water: Yes, provided by Agua SUD.
Sewer: Yes, OSSF’s have been installed.
Paved: Yes, El Coyote Circle and Doffing Road are paved.
b. Rancho El Viejito Subdivision – Pct. 1 (Lucila Martinez De Cantu) (Anderson Road & Dillon Road)
No. of Lots: 3 Single Family
Flood Zone:C
Streetlights: N/A
Filling Stations: N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain onto Anderson Road side ditch.
ETJ: Yes, approved by the City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s have been installed.
Paved: Yes, Anderson Road is paved.
c. T & O Ranch Subdivision – Pct. 3 (T & O Ranch Investments, LLC.) (Mesquite Lane & El Pinto Road)
No. of Lots: 7 Single Family
Flood Zone:C
Streetlights: N/A
Filling Stations: 1
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Mesquite Lane Road side ditch.
ETJ: No, Rural area.
Water: Yes, provided by Agua SUD.
Sewer: Yes, Sanitary Sewer provided by Agua SUD.
Paved: Yes, Mesquite Lane is paved.
a. J. Leal Subdivision- Pct. 3 (Jesus Eliu Leal De Leon) (Trosper Road & Mile 7 North Road)
No. of Lots: 1 Commercial
Flood Zone: X
Estimated Number of Streetlights:N/A
Filling Stations:1
Drainage: Yes, Drainage will be provided by onsite detention which will connect to an existing TxDot storm system at building permit stage.
ETJ: Yes, approved by the City of McAllen.
Water: Yes, provided by Sharyland Water Supply Corporation.
Sewer: Yes, OSSF
Paved: Yes, Mile 7 North Road and Trosper Road are paved.
b. Emily Villarreal Subdivision – Pct. 1 (Martin Villarreal) (Midway Road & Mile 5 North Road)
No. of Lots: 3 Single Family
Flood Zone: B
Estimated Number of Streetlights:N/A
Filling Stations:N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Mile 5 North Road side ditch.
ETJ: Yes, approved by the City of Weslaco.
Water: Yes, provided by City of Weslaco.
Sewer: Yes, OSSF’s
Paved: Yes, Mile 5 North Road and Midway Road are paved.
c. Owassa Springs Subdivision- Pct. 2 (The Three Rupperts, LLC.) (Owassa Road & Cesar Chavez Road)
No. of Lots: 15 Single Family
Flood Zone:B
Estimated Number of Streetlights: 5
Filling Stations: 2
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: No, Rural Area
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF’s
Paved: Yes, Owassa Road is paved and 1 internal street to be paved.
d. Western Oaks Subdivision- Pct. 3 (Rigoberto Villarreal) (Western Road & Mile 6 North Road)
No. of Lots: 42 Single Family
Flood Zone:X
Estimated Number of Streetlights: 18
Filling Stations: 9
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by regional detention areas dedicated to HCDD#1.
ETJ: Yes, approved by the City of Mission.
Water: Yes, provided by Agua SUD.
Sewer: Yes, OSSF’s
Paved: Yes, Western Road is paved.North Abram Road and 2 internal streets to be paved.
e. Blanquita Estates No. 2 Subdivision- Pct. 1 (La Cuesta Sol Development, LTD.) (Canton Road & F.M. 493)
No. of Lots: 42 Single Family
Flood Zone:C
Estimated Number of Streetlights: 10
Filling Stations: 4
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, approved by the City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF’s
Paved: Yes, Canton Road is paved and 3 internal streets to be paved.
f. El Pinto Estates Phase II Subdivision- Pct. 3 (Garvic Properties, LP) (El Pinto Road & Mesquite Lane)
No. of Lots: 47 Single Family
Flood Zone:C
Estimated Number of Streetlights: 9
Filling Stations: 6
Drainage: Yes, Drainage will be provided by onsite detention areas along the rear of the lots.
ETJ: No, Rural Area.
Water: Yes, provided by Agua SUD
Sewer: Yes, OSSF’s for lots 60-69 & sanitary sewer for the remaining lots.
Paved: Yes, El Pinto Road is paved and 1 internal street to be paved.
g. Encenada Estates Subdivision- Pct. 4 (Roman Vera Jr.) (Terry Road & Mile 17 North Road)
No. of Lots: 72 Single Family
Flood Zone:X
Estimated Number of Streetlights: 11
Filling Stations: 7
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply Corporation
Paved: Yes, Terry Road is paved and 5 internal streets to be paved.
h. Rio Rico Ranchettes No. 2 Subdivision- Pct. 1 (BPB Financial Services, LP) (Mile 4 North Road & Mile 1 1/2 East Road)
No. of Lots: 79 Single Family
Flood Zone:C
Estimated Number of Streetlights: 11
Filling Stations: 9
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by proposed drain ditch.
ETJ: No, Rural area.
Water: Yes, provided by Military Highway Water Supply Corporation
Sewer: Yes, OSSF’S
Paved: Yes, Mile 4 North Road is paved.Mile 1 ½ East Road and 2 internal streets to be paved.
i. Cantera Hermosa Phase I Subdivision- Pct. 1 (J.H. McKeever) (Eldora Road & Tower Road)
No. of Lots: 84 Single Family
Flood Zone:C
Estimated Number of Streetlights: 15
Filling Stations: 6
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by proposed drain ditch.
ETJ: Yes, approved by the City of Alamo.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply Corporation
Paved: Yes, Eldora Road is paved and 4 internal streets to be paved.
2. Final Approval with Financial Guarantee
a. The Estates at Paloma Park Subdivision- Pct. 4 (Lionel W. Gegenheimer III) (Alberta Road & Raul Longoria Road)
No. of Lots: 8 Single Family
Flood Zone:B
Streetlights: 5
Filling Stations: 3
Drainage: Yes, Drainage will be provided by natural perculation within the proposed lots and surface runoff will drain into Alberta Road side ditch.
ETJ: Yes, approved by the City of Edinburg.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF’s have been escrowed.
Paved: Yes, Alberta Road is paved.
*Final Approval with a cash deposit in the amount of $12,000.00 for (8) OSSF’s
b. Highland Manor Subdivision- Pct. 1 (Criselda Hinojosa) (Mile 11 North Road & Mile 5 ½ West Road)
No. of Lots: 11 Single Family
Flood Zone:X
Streetlights: N/A
Filling Stations: 3
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Mile 11 North Road side ditch.
ETJ: Yes, approved by the City of Weslaco.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, OSSF’s have been escrowed.
Paved: Yes, Mile 11 North Road is paved and Mile 5 ½ West Road to be paved.
*Final Approval with a cash deposit in the amount of $16,500.00 for (11) OSSF’s
c. Sedona Estates Subdivision- Pct. 1 (Cayetano Development) (Sioux Road & Tower Road)
No. of Lots: 135 Single Family
Flood Zone:B
Streetlights: 21
Filling Stations: 14
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, approved by the City of Alamo.
Water: Yes, provided by North Alamo Water Supply Corporation
Sewer: Yes, Sanitary Sewer provided by North Alamo Water Supply Corporation.
Paved: Yes, Sioux Road is paved and 5 internal streets to be paved.
*Final Approval with a cash deposit in the amount of $343,286.30 for Paving & Drainage Imps.
d. Bon Viejo Phase 5 Subdivision – Pct. 1 (Kyndel W. Bennett) (Mile 13 ½ North Road & F.M. 493)
No. of Lots: 42 Single Family
Flood Zone:C
Streetlights: 9
Filling Stations: 4
Drainage: Yes, Drainage will be provided by storm sewer system and detention will be provided by widening the existing drain ditch.
ETJ: Yes, approved by the City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s have been installed.
Paved: Yes, Mile 13 ½ North Road and 3 internal streets are paved.
*Final Approval with a cash deposit in the amount of $12,500.00 for Drain ditch & Lot grading.
3. Final Approval
a. AAA Subdivision – Pct. 3 (Angel De La Cerda) (Doffing Road & Mile 5 North Road)
No. of Lots: 1 Multi- Family
Flood Zone:X
Streetlights: N/A
Filling Stations: 1
Drainage: Yes, Drainage will be provided by onsite detention and discharging onto Doffing Road side ditch.
ETJ: Yes, approved by the City of Mission.
Water: Yes, provided by Agua SUD.
Sewer: Yes, OSSF’s have been installed.
Paved: Yes, El Coyote Circle and Doffing Road are paved.
b. Rancho El Viejito Subdivision – Pct. 1 (Lucila Martinez De Cantu) (Anderson Road & Dillon Road)
No. of Lots: 3 Single Family
Flood Zone:C
Streetlights: N/A
Filling Stations: N/A
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain onto Anderson Road side ditch.
ETJ: Yes, approved by the City of Donna.
Water: Yes, provided by North Alamo Water Supply Corporation.
Sewer: Yes, OSSF’s have been installed.
Paved: Yes, Anderson Road is paved.
c. T & O Ranch Subdivision – Pct. 3 (T & O Ranch Investments, LLC.) (Mesquite Lane & El Pinto Road)
No. of Lots: 7 Single Family
Flood Zone:C
Streetlights: N/A
Filling Stations: 1
Drainage: Yes, Drainage will be provided by natural perculation and surface runoff will drain into Mesquite Lane Road side ditch.
ETJ: No, Rural area.
Water: Yes, provided by Agua SUD.
Sewer: Yes, Sanitary Sewer provided by Agua SUD.
Paved: Yes, Mesquite Lane is paved.
BACKGROUND
Fiscal Impact
Attachments
- J. LEAL ;P
- EMILY VILLARREAL;P
- OWASSA SPRINGS;P
- WESTERN OAKS;P
- BLANQUITA ESTATES #2
- EL PINTO ESTATES #2
- ENCENADA ESTATES;P
- RIO RICO RANCHETTES #2
- CANTERA HERMOSA
- The Estates at Paloma Park;F
- Highland Manor;F
- Sedona Est;F
- Bon viejo #5
- AAA;F
- Rancho El Viejito;F
- T & O;F
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Veronica Ortiz | 12/14/2020 03:36 PM |
| Final Approval | Monica Salinas | 12/18/2020 06:04 PM |
- Form Started By:
- Flor Castillo
- Started On:
- 12/14/2020 02:18 PM
- Final Approval Date:
- 12/18/2020