CAPTION

Requesting approval of Change Order No.3 [increase] for Texas Cordia Construction, LLC for Hidalgo County Precinct No.1-Mile 6 W Road Project (Mile 9 to Mile 11) as recommended by the project engineer, SAMES, Inc. and concurrence by TxDOT [C-19-274-04-07].

BACKGROUND

Change Order#3 allows or changes to the construction based on craftsmanship issues related with the backfill and compaction operations of a third party. Said party removed 11 power poles that were located within the ROW and within the in-place stabilized base material of the proposed roadway. After the removal of the power poles, the party backfilled and compacted the 11 holes. However, the backfill operations/procedures did not comply with the required compaction and in-place density stipulated by the contract. The concerns related with the non-compliant compaction of the backfill were forwarded to Texas Cordia Construction (TCC) along with a directive to provide a proposal for reworking the backfill on the 11 holes. TCC submitted a proposal for this item, and it was forwarded to TxDOT for concurrence. TxDOT approved the proposal as submitted. 

Fiscal Impact

CALENDAR YEAR:
2021
ACCT. #:
1-1315-431-00-121-039-1-721
FUNDS AVAILABLE Y/N?:
Y
MATCHING FUNDS Y/N?:

BUDGETARY IMPACT:

TXDOT-PCT1 M6W PHASE 1 (M9-M11)-ROADS; FUNDS AVAILABLE AS OF 10.1.2021

Attachments

Form Review

Inbox Reviewed By Date
Purchasing / Internal msalazar 10/01/2021 03:12 PM
Budget and Management Veronica Ortiz 10/01/2021 03:45 PM
Final Approval Monica Salinas 10/01/2021 06:22 PM
Form Started By:
Hector Garcia
Started On:
09/30/2021 04:33 PM
Final Approval Date:
10/01/2021