AI - 100285
2.A.
DD-CONSENT AGENDA SPECIAL MTG
- Meeting Date:
- 08/05/2025
- Submitted For:
- Esther Mireles
- Submitted By:
- Esther Mireles
- Department:
- DRAINAGE DISTRICT
Information
CAPTION
Utility Permit
AEP Texas Inc. and Stellex Power Line OPCP, LLC propose the installation of a double-circuit 345kV transmission line. The line will originate at the Frontera Substation, located approximately 1.9 miles southwest of Palmview, Texas, and will terminate at the Del Sol Substation. As part of this project, the proposed transmission line will cross Hidalgo County Drainage District No. 1’s (HCDD1) Peñitas Drain.
AEP Texas Inc. and Stellex Power Line OPCP, LLC propose the installation of a double-circuit 345kV transmission line. The line will originate at the Frontera Substation, located approximately 1.9 miles southwest of Palmview, Texas, and will terminate at the Del Sol Substation. As part of this project, the proposed transmission line will cross Hidalgo County Drainage District No. 1’s (HCDD1) Peñitas Drain.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Final Approval | Nora Cavazos | 08/01/2025 03:12 PM |
- Form Started By:
- Esther Mireles
- Started On:
- 07/31/2025 03:15 PM
- Final Approval Date:
- 08/01/2025