- Meeting Date:
- 11/18/2008
- Submitted For:
- Joe Pena
- Submitted By:
- Sandra Garcia, RIGHT OF WAY DEPT.
- Department:
CAPTION
1. L & G Engineering Laboratory, LLC:
a. Geo-technical Drilling-On Inspiration Road
b. Geo-technical Drilling-On Chuihuhaua Street
2. North Alamo Water Supply:
a. NEC of Texas Rd and Doolittle Rd- Bore- Jaime Tamez- 3/4" service connection
b. Approximately 500' going north from Alberta Rd on the west side of "I" Rd- Bore- Luis Miguel Arechiga 1.5" service connection
c. Approximately 815' of line extension going south from Lotts Rd on the east side of Soderquist Rd- Line Ext-David Alfonso Gonzalez- 3/4" service connection
d. Approximately 500' east of 1423 on the south side of mile 11.5N- Bore- Samuel Tafolla-3/4" service connection
3. Heraclio Garcia (Heraclio Garcia Subdivision):
a. The 8-inch sanitary sewer line being proposed will connect to an existing manhole located approximately 35 feet east of the east line of Heraclio Garcia Subdivision. The material for this line is PVC SDR-35.
b. The 6-inch water line being proposed will connect to an existing 6-inch line located on the south side of Trenton Road. The purpose for this line is to feed a proposed fire hydrant, which will be located on the north side of said Road, approximately 1/4 of a mile east from "I" Road. The material for this line is PVC C900 Dr-25.
c. The 3/4 of an inch water service line being proposed will connect to an existing 6-inch line located on the south side of Trenton Road. The purpose for this service line is to provide with potable water to lot 1 of Heraclio Garcia Subdivision.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Veronica Lopez | 11/13/2008 07:58 AM |
| Auditor's Office | lfong | 11/14/2008 12:02 PM |
- Form Started By:
- Saul Garcia
- Started On:
- 11/10/2008 10:02 AM
- Final Approval Date:
- 11/14/2008