CAPTION

1.  North Alamo Water Supply:
a.  El Nopal Subd.(S B83/W Whalen)- Carolina Garces- X Rd- 3/4" service connection;

2.  La Joya I.S.D. No.25 School Subdivision:
a.  Contractor shall install a 24" drain line crossing Abram Road approximately 322 feet north of mile 5 Road then run south approximately 1730 feet south along Abram Road to a manhole, discharge into the H.C.D.D. No. 1 Ditch via 36" drain line.