AI- 13387
16.A.
CC REGULAR
- Meeting Date:
- 01/20/2009
- Submitted For:
- Joe Pena
- Submitted By:
- Sandra Garcia, RIGHT OF WAY DEPT.
- Department:
Information
CAPTION
1. North Alamo Water Supply Corporation:
Approximately 500' west of Doolittle Rd on the south side of Benito Ramirez Rd- Bore- Sara Rios 3/4" service connection
2. Omar Garcia (Palomar Subdivision):
The 8-inch sanitary sewer line being proposed will connect to an existing 8-inch sanitary sewer line with a manhole. The existing 8-inch line is located on the east side and within the right-of-way of Trosper Rd. The purpose of the proposed line is to provide with sanitary sewer collection service to Palomar Subdivision. The material for this line is PVC SDR-26.
Approximately 500' west of Doolittle Rd on the south side of Benito Ramirez Rd- Bore- Sara Rios 3/4" service connection
2. Omar Garcia (Palomar Subdivision):
The 8-inch sanitary sewer line being proposed will connect to an existing 8-inch sanitary sewer line with a manhole. The existing 8-inch line is located on the east side and within the right-of-way of Trosper Rd. The purpose of the proposed line is to provide with sanitary sewer collection service to Palomar Subdivision. The material for this line is PVC SDR-26.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Veronica Lopez | 01/14/2009 03:23 PM |
| Auditor's Office | lfong | 01/15/2009 02:06 PM |
- Form Started By:
- Saul Garcia
- Started On:
- 01/13/2009 03:26 PM
- Final Approval Date:
- 01/15/2009