CAPTION

1.  L & G Engineering Laboratory, LLC:
a.  Geotechnical Drilling- Mile 3 Rd;  boring will be approximately 4" in diameter and are to be advanced to maximum depths of 90'.

2.  North Alamo Water Supply:
a.  Approximately 95' east from Terry Rd on the south side of Ingle Rd- Line Ext- Irasema Perez; 3/4" service connection.