5.A.
CC CONSENT
Meeting Date:
01/16/2007
Submitted For:
Joe Pena
Submitted By:
Sandra Garcia, RIGHT OF WAY DEPT.
Department:

Information

CAPTION

North Alamo Water Supply: 
1.  The proposed 8" PVC C-900 Class 150 water line cross under Old La Blanca Road at approximately 1,300 LF south from Mile 10 1/2 N Road.  The proposed line will be bored and encased in a 16" steel casing.  Donna Elementary.
2.  Approximately 500' going west from Doolittle Rd on the north side of Pinkston Rd - Bore- Miguel A. Garcia;  
3/4" meter installation
3.  Approximately 500' going west from the intersection of Victoria Rd and Stites Rd on the south side - Bore- 
David Yanez - 3/4" meter installation.
4.  Approximately 400' East of Mile 6 on the south side of Mile 14 1/2 (Villa Del Rio L7) X Rd - Esperanza Garza- 
3/4" meter installation.
5.  NEC of Alamo Rd and Ramseyer Rd - Bore- Garco, LTD - 3/4' meter installation.

6. David Omar Salinas, P.E., President, Salinas Engineering  Associates:
    An 8" PVC water line from North 23rd St. (Depot Road) west along a line 35.0 feet North from the center of Rogers Road to a distance of 808.0 feet to and through the frontage of Moreno Subdivision, Phases I,II, and III.

BACKGROUND


Fiscal Impact