AI- 21424
7.B.
CC CONSENT
- Meeting Date:
- 06/08/2010
- Submitted For:
- Joe Pena
- Submitted By:
- Sandra Garcia, RIGHT OF WAY DEPT.
- Department:
Information
CAPTION
Valley Telephone Cooperative:
1. Upgrading existing telephone lines with fiber optic cable inside a 1-1/4" HDPE Sch.40 conduit through out the Hargill and San Manuel Area. All pavement and concrete driveways and roads will be bored.
1. Upgrading existing telephone lines with fiber optic cable inside a 1-1/4" HDPE Sch.40 conduit through out the Hargill and San Manuel Area. All pavement and concrete driveways and roads will be bored.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Erika Zamora | 06/02/2010 04:05 PM |
| Auditor's Office | lfong | 06/04/2010 04:10 PM |
- Form Started By:
- Saul Garcia
- Started On:
- 06/01/2010 09:03 AM
- Final Approval Date:
- 06/04/2010