AI- 21520
7.A.
CC CONSENT
- Meeting Date:
- 06/15/2010
- Submitted For:
- Joe Pena
- Submitted By:
- Sandra Garcia, RIGHT OF WAY DEPT.
- Department:
CAPTION
1. Enterprise Texas Pipeline LLC:
a. The scope of work is to supply and install an 8" thick x 8'ft wide x 50' ft long pipeline protection concrete slab to the existing 8" Enterprise South Texas- TX150, Texan Gardens Gathering (TECO) pipeline line No. 607-1 @ Iowa Rd, Mission, Texas, Hidalgo County, TX in accordance with Enterprise Dwg.No.14368-9903- Typical PL Protection slab and DWG 14368-9904 to accomodate to the Valley Caliche Products proposed construction of permanent access road for heavy equipment crossing the 8" pipeline.
2. North Alamo Water Supply Corporation:
a. Approximately 500' east of Tower Rd on the south side of Trenton Rd- Bore- Ramon Martinez; 3/4" service connection
a. The scope of work is to supply and install an 8" thick x 8'ft wide x 50' ft long pipeline protection concrete slab to the existing 8" Enterprise South Texas- TX150, Texan Gardens Gathering (TECO) pipeline line No. 607-1 @ Iowa Rd, Mission, Texas, Hidalgo County, TX in accordance with Enterprise Dwg.No.14368-9903- Typical PL Protection slab and DWG 14368-9904 to accomodate to the Valley Caliche Products proposed construction of permanent access road for heavy equipment crossing the 8" pipeline.
2. North Alamo Water Supply Corporation:
a. Approximately 500' east of Tower Rd on the south side of Trenton Rd- Bore- Ramon Martinez; 3/4" service connection
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Erika Zamora | 06/08/2010 04:13 PM |
| Auditor's Office | lfong | 06/11/2010 10:13 AM |
- Form Started By:
- Saul Garcia
- Started On:
- 06/04/2010 11:09 AM
- Final Approval Date:
- 06/11/2010