Skip to main content

AgendaQuick™

View Agenda Item

AI- 21520
7.A.
CC CONSENT
Meeting Date:
06/15/2010
Submitted For:
Joe Pena
Submitted By:
Sandra Garcia, RIGHT OF WAY DEPT.
Department:

CAPTION

1. Enterprise Texas Pipeline LLC:
a. The scope of work is to supply and install an 8" thick x 8'ft wide x 50' ft long pipeline protection concrete slab to the existing 8" Enterprise South Texas- TX150, Texan Gardens Gathering (TECO) pipeline line No. 607-1 @ Iowa Rd, Mission, Texas, Hidalgo County, TX in accordance with Enterprise Dwg.No.14368-9903- Typical PL Protection slab and DWG 14368-9904 to accomodate to the Valley Caliche Products proposed construction of permanent access road for heavy equipment crossing the 8" pipeline.

2. North Alamo Water Supply Corporation:
a. Approximately 500' east of Tower Rd on the south side of Trenton Rd- Bore- Ramon Martinez; 3/4" service connection

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Erika Zamora 06/08/2010 04:13 PM
Auditor's Office lfong 06/11/2010 10:13 AM
Form Started By:
Saul Garcia
Started On:
06/04/2010 11:09 AM
Final Approval Date:
06/11/2010